Feed Making Machine For Poultry
CN
About feed making machine for poultry
Where to Find Feed Making Machine Suppliers for Poultry?
China remains the central hub for feed making machine manufacturing, with key industrial clusters in Henan and Liaoning provinces driving production efficiency and export competitiveness. Henan, home to over 70% of China’s agricultural machinery exporters, benefits from concentrated supply chains and advanced fabrication infrastructure centered around Zhengzhou. This region specializes in compact, energy-efficient pellet mills tailored for small-to-medium poultry farms. Meanwhile, Dandong in Liaoning province hosts integrated machinery complexes focused on heavy-duty, high-capacity feed processing lines used in commercial livestock operations.
These regional ecosystems enable vertical integration—from die plate forging to final assembly—reducing component lead times by up to 40%. Proximity to raw material sources (e.g., carbon steel, stainless steel) and logistics hubs allows suppliers to maintain lean inventories while supporting both bulk orders and customized configurations. Buyers typically benefit from shorter production cycles (15–30 days for standard units), cost advantages of 20–35% compared to EU or North American manufacturers, and scalability for turnkey feed plant installations.
How to Choose Feed Making Machine Suppliers for Poultry?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Specifications & Compliance
Ensure machines meet baseline performance criteria: die diameter (≥190mm), motor power (3–22kW), and output capacity (100–1,000 kg/h). For international compliance, verify CE marking or equivalent safety certifications, particularly for electrical components. Request documentation on heat-treated alloy steel usage in critical wear parts such as rollers and flat dies to assess durability under continuous operation.
Production Capacity Verification
Assess supplier capability through measurable indicators:
- Minimum factory area exceeding 3,000m² for consistent batch production
- In-house machining capabilities including CNC lathing, welding, and tempering processes
- Dedicated quality control checkpoints during assembly and final testing
Cross-reference online revenue data and order fulfillment metrics—suppliers with >$40,000 annual digital sales often demonstrate reliable output and post-sales support capacity.
Procurement Risk Mitigation
Utilize secure payment mechanisms such as escrow services to align payment release with delivery milestones. Prioritize suppliers with documented after-sales service protocols, including spare parts availability and remote troubleshooting. Conduct pre-shipment inspections either independently or via third-party auditors to validate machine functionality against agreed specifications.
What Are the Best Feed Making Machine Suppliers for Poultry?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Product Range (Price Range) |
|---|---|---|---|---|---|---|---|
| Zhengzhou Guitang Technology Co., Ltd. | Henan, CN | Feed Processing Machines, Tractors, Cultivators | US $3,000+ | 83% | ≤1h | <15% | $188–278.80 |
| Dandong Wellgain Machinery Equipment Co., Ltd. | Liaoning, CN | Feed Processing Machines, Rice Mill Harvesters, Engines | US $190,000+ | 99% | ≤5h | <15% | $9.90–2,599 |
| Zhengzhou Runjin Machinery Manufacturing Co., Ltd. | Henan, CN | Feed Processing Machines, Wood Crushers, Pet Food Machines | US $9,000+ | 91% | ≤3h | 16% | $60–329 |
| Luohe Jinde Intelligent Equipment Co., Ltd. | Henan, CN | Feed Processing Machines, Mixing Equipment, Packaging Systems | US $40,000+ | 100% | ≤2h | 50% | $559–4,000 |
| Xuchang Jinglai Machinery Co., Ltd. | Henan, CN | Feed Processing Machines, Flour Mills, Rebar Bending Machines | US $90,000+ | 100% | ≤3h | <15% | $40–400 |
Performance Analysis
Suppliers like Luohe Jinde and Xuchang Jinglai demonstrate exceptional reliability with 100% on-time delivery records and robust reorder rates, indicating strong customer satisfaction. Dandong Wellgain stands out for scale, backed by the highest reported online revenue (US $190,000+), suggesting extensive export experience and diversified product validation. While several Henan-based suppliers offer competitive entry-level pricing ($60–200 range), higher-tier models from established producers feature hardened steel components and improved energy efficiency, justifying premiums above $350. Buyers seeking full-line integration should prioritize suppliers offering auxiliary equipment such as mixers, coolers, and packaging systems within their portfolios.
FAQs
How to verify feed making machine supplier reliability?
Cross-check claimed certifications (e.g., ISO 9001, CE) with official registries. Request evidence of quality control procedures, including material test reports and finished product inspection logs. Analyze buyer feedback focusing on machine uptime, die replacement frequency, and responsiveness to technical inquiries.
What is the typical minimum order quantity (MOQ)?
Most suppliers list MOQs at 1 set or piece, enabling low-volume trial purchases. However, unit prices often decrease significantly at 5+ sets, especially for complete pellet line configurations. Confirm whether pricing includes motor assembly or if voltage customization (e.g., 220V vs. 380V) incurs additional charges.
What are common lead times for feed making machines?
Standard models are typically shipped within 15–25 days after order confirmation. Customized units requiring specific motor types, hopper sizes, or automation features may require 30–45 days. Air freight options allow delivery in 7–10 days; sea freight remains optimal for container loads, averaging 25–35 days depending on destination port.
Do suppliers support customization?
Yes, most manufacturers offer modifications including stainless steel construction, variable speed drives, and automated feeding systems. Submit detailed technical requirements—such as desired pellet size (2–8mm), moisture tolerance, and daily throughput—to receive accurate engineering proposals. Prototypes or sample units can be produced within 20–30 days upon request.
Are spare parts readily available?
Leading suppliers stock critical wear components like flat dies, rollers, and cutter knives. Confirm spare part pricing and inventory policies prior to purchase. Some vendors include initial spare kits with full-system orders, reducing future downtime.









