Hub In Computer
About hub in computer
Where to Find Hub in Computer Suppliers?
China remains the global epicenter for computer hub manufacturing, with key production clusters concentrated in Shenzhen, Dongguan, and Guangzhou. These regions host vertically integrated supply chains that streamline component sourcing—from USB controllers and PCB boards to aluminum housings and injection-molded plastics—enabling rapid prototyping and high-volume output. Shenzhen leads in innovation, offering access to advanced Type-C and multiport docking solutions, while Dongguan excels in cost-efficient mass production of standard USB 2.0/3.0 hubs.
The industrial ecosystem supports economies of scale, with many suppliers operating facilities equipped for surface-mount technology (SMT) assembly, automated testing, and full enclosure fabrication within a single campus. This integration reduces lead times to 15–25 days for bulk orders and allows flexibility in MOQs, ranging from 1 to 3,000 units depending on model complexity. Buyers benefit from localized logistics networks, mature subcontractor pools, and compliance-ready production lines capable of meeting international export standards.
How to Choose Hub in Computer Suppliers?
Selecting reliable suppliers requires rigorous evaluation across technical, operational, and transactional dimensions:
Quality Assurance & Compliance
Prioritize suppliers demonstrating adherence to electronic safety and environmental standards such as RoHS and CE. While formal ISO 9001 certification is not universally listed, consistent on-time delivery rates above 95% and responsive communication serve as practical proxies for process discipline. Verify product compliance through sample testing for signal integrity, power distribution stability, and thermal performance under sustained load.
Production Capacity and Responsiveness
Assess operational scale using measurable indicators:
- On-time delivery rate exceeding 96%
- Average response time under 3 hours
- Monthly online revenue exceeding US $200,000 as an indicator of active production volume
- In-house design and tooling capabilities for custom housing and port configurations
Cross-reference supplier claims with order fulfillment metrics and customer reorder rates where available.
Customization and Transaction Security
Confirm availability of customization options including color, material (ABS, aluminum), logo imprinting, packaging, and cable length. For procurement security, utilize payment structures that align financial release with delivery milestones. Request samples before scaling orders to validate build quality, connector durability, and data transfer performance across multiple device types.
What Are the Best Hub in Computer Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Response Time | Reorder Rate | Min. Order Quantity | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Licheng Electronics Co., Ltd. | Shenzhen, CN | 7-in-1, 8-in-1 USB Type-C Hubs | US $470,000+ | 100% | ≤2h | 15% | 5–10 pcs | Color, material, size, logo, packaging, label, graphic |
| Dongguan Yilian Photoelectric Technology Co., Ltd. | Dongguan, CN | 5-in-1 to 7-in-1 USB-C Hubs with HDMI/VGA | US $410,000+ | 99% | ≤3h | 36% | 1 pc | VGA, color, material, size, HDMI, logo, packaging, label, graphic |
| Guangzhou Luxun Technology Co., Ltd. | Guangzhou, CN | 4-in-1 to 8-in-1 USB 3.0 Hubs | US $220,000+ | 99% | ≤3h | <15% | 2–5 pcs | Color, material, size, logo, packaging, label, graphic |
| Shenzhen Focuses Electronics Co., Ltd. | Shenzhen, CN | 3-Port to 8-in-1 Multiport Hubs | US $280,000+ | 85% | ≤3h | <15% | 1,000–3,000 pcs | Color, material, size, logo, packaging, label, graphic |
| Dongguan Wodexun Wire Electronics Co., Ltd. | Dongguan, CN | USB 2.0/3.0 Hubs, Mini Hubs, Video Capture Hubs | US $80,000+ | 96% | ≤1h | <15% | 1–5 pcs | Limited (product-specific) |
Performance Analysis
Dongguan Yilian stands out with the highest reorder rate (36%) and lowest MOQ (1 piece), indicating strong customer satisfaction and market adaptability. Shenzhen Licheng achieves perfect on-time delivery and low MOQs, making it ideal for agile sourcing. Guangzhou Luxun and Dongguan Yilian both report 99% on-time fulfillment, reflecting robust production control systems. In contrast, Shenzhen Focuses Electronics serves large-volume buyers but carries a lower on-time delivery rate (85%), suggesting potential bottlenecks in order execution. Suppliers in Dongguan and Shenzhen dominate responsiveness, with average reply times under 3 hours—critical for iterative design and issue resolution.
FAQs
How to verify hub in computer supplier reliability?
Evaluate on-time delivery history, response speed, and transaction volume. Request product certifications (CE, RoHS) and conduct third-party lab testing for data transfer speed, voltage regulation, and EMI shielding. Review customer feedback focused on long-term reliability and after-sales support.
What is the typical sampling timeline?
Standard hub samples are typically produced within 7–12 days. Custom designs with unique enclosures or port layouts may require 18–25 days, including tooling adjustments. Air shipping adds 5–10 days for international delivery.
Can suppliers ship computer hubs worldwide?
Yes, all listed suppliers have export experience and offer global shipping via express, air, or sea freight. Confirm Incoterms (FOB, EXW, CIF) early in negotiations and ensure compliance with import regulations for electronic peripherals in target markets.
Do manufacturers provide free samples?
Sample policies vary. Some suppliers offer paid samples refundable against future orders, particularly for quantities exceeding 100 units. Others charge full sample cost, especially for high-complexity models like 7-in-1 docking hubs with video output.
How to initiate customization requests?
Submit detailed specifications including desired ports (USB-A, USB-C, HDMI, Ethernet), housing material (plastic, aluminum), branding requirements (logo placement, color Pantone codes), and packaging format. Leading suppliers provide 3D renderings and functional prototypes within 10–14 days of approval.









