Hydrofoil Board Supplier
About hydrofoil board supplier
Where to Find Hydrofoil Board Suppliers?
China remains the central hub for hydrofoil board manufacturing, with key production clusters in Guangdong and Jiangsu provinces. These regions host vertically integrated supply chains specializing in carbon fiber composites, precision aluminum machining, and electric propulsion systems—core components of modern e-foils. Shenzhen and Huizhou in Guangdong are particularly notable for their concentration of water sports equipment manufacturers, offering rapid prototyping, scalable assembly lines, and proximity to major export ports like Yantian and Shekou.
The industrial ecosystem supports both OEM/ODM models and small-batch customization, enabling competitive pricing and lead times. Factories typically operate automated layup processes for carbon fiber boards and wings, supported by CNC-machined aluminum masts and modular battery-integrated motor systems. Average monthly output per mid-sized facility ranges from 500 to 1,200 units, depending on complexity and material specifications. Buyers benefit from localized access to raw materials, reducing component procurement time by up to 40% compared to offshore alternatives.
How to Choose Hydrofoil Board Suppliers?
Selecting a reliable supplier requires due diligence across technical, operational, and transactional dimensions:
Quality and Compliance Verification
Prioritize suppliers with demonstrable adherence to international standards such as CE certification for electrical safety and RoHS compliance for restricted substances. While not all suppliers list formal ISO 9001 certification, evaluate quality control through documented testing protocols for waterproofing, battery endurance, and structural integrity under dynamic load conditions.
Production and Customization Capacity
Assess the following indicators of manufacturing maturity:
- In-house composite molding (carbon fiber/glass fiber) and curing capabilities
- On-site CNC machining for aluminum fuselage and wing components
- Integration of lithium-ion battery packs and brushless motor systems
- Customization options including color, graphics, logo branding, and packaging configurations
Confirm minimum order quantities (MOQs), which range from 1 piece for sample validation to full container loads for bulk procurement. Lead times average 15–30 days post-deposit, depending on customization scope.
Supplier Performance Metrics
Leverage verifiable performance data where available:
- On-time delivery rates above 95% indicate reliable logistics management
- Response times under 2 hours reflect strong customer support infrastructure
- Reorder rates below 15% may suggest niche specialization or limited market penetration, while higher rates (>30%) indicate repeat buyer confidence
Cross-reference online revenue estimates and transaction volume as proxies for operational scale and financial stability.
What Are the Best Hydrofoil Board Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Reorder Rate | Avg. Response | Customization Options | Product Range | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Changzhou Double Spring Machinery Co., Ltd. | Hydrofoil Boards, Carbon Fiber Components | US $5.5M+ | 100% | <15% | ≤2h | Color, material, size, logo, packaging | High-end electric hydrofoils | $6,032–6,756 |
| Huizhou Guanyong Sports Equipment Co., Ltd. | Hydrofoil Boards, Water Sport Equipment | US $460,000+ | 81% | 22% | ≤2h | Color, material, size, logo, packaging | Aluminum-carbon hybrid foils | $218–458 |
| Shenzhen Chuyuan Mtech Co., Ltd. | Surfing, Diving, Yachts | US $450,000+ | 98% | <15% | ≤1h | Color, material, size, logo, packaging | Multisport marine gear | Data not available |
| Sabo Sports Technology (Shenzhen) Co., Ltd. | Water Scooters, Jetskis, Racing Boats | US $360,000+ | 96% | 31% | ≤2h | Limited | Branded electric hydrofoils | $2,499–5,299 |
| INTERTRADE LIMITED | Plants Oil, Recycled Plastics, Spices | Not disclosed | Not available | Not available | ≤7h | Limited | Entry-level carbon fiber boards | $650–850 |
Performance Analysis
Changzhou Double Spring Machinery stands out with a 100% on-time delivery rate and high transaction volume, indicating robust production planning and export experience. Its premium pricing reflects focus on original branded designs and full carbon fiber construction. In contrast, Huizhou Guanyong offers aggressive cost leadership with entry-level hybrid models priced under $500, though its 81% delivery performance warrants closer shipment monitoring. Shenzhen Chuyuan Mtech demonstrates strong responsiveness (≤1 hour) and low reorder rates, suggesting specialization in customized marine accessories beyond core hydrofoil production. Sabo Sports shows balanced performance with moderate pricing and a 31% reorder rate, indicative of consistent product satisfaction. INTERTRADE LIMITED operates outside the core sports equipment sector, posing potential risks in after-sales support and technical consistency despite competitive pricing.
FAQs
How to verify hydrofoil board supplier reliability?
Cross-check provided certifications (CE, RoHS) with official databases. Request factory audit reports or video walkthroughs to confirm in-house production capabilities. Analyze transaction history, focusing on dispute resolution records and customer feedback related to waterproofing failures, battery lifespan, and structural durability.
What is the typical MOQ and lead time?
Most suppliers accept MOQs as low as 1 unit for samples. Bulk orders typically start at 10–20 units. Standard lead time ranges from 15 to 30 days after deposit confirmation, extending to 45 days for fully customized configurations involving new molds or proprietary electronics integration.
Can suppliers provide custom hydrofoil designs?
Yes, many suppliers offer ODM/OEM services including custom graphics, color schemes, logo embossing, and packaging. Advanced customization—such as wing shape modification or battery capacity adjustment—requires engineering collaboration and may involve NRE (non-recurring engineering) fees. Prototypes can typically be delivered within 3–4 weeks.
Do hydrofoil board suppliers support global shipping?
Established suppliers manage international logistics via air or sea freight under FOB, CIF, or DDP terms. Air shipping is preferred for samples (7–10 days transit); sea freight is cost-effective for containerized orders. Confirm compliance with destination regulations for lithium battery transport (e.g., IATA UN38.3 certification).
Are samples available before bulk ordering?
Most suppliers provide paid samples to validate design and quality. Sample costs vary from $218 to $6,756 depending on model complexity and are often credited toward subsequent bulk orders. Expect 10–25 days for sample production and an additional 7–14 days for international delivery.









