Ice Cube Machine Mini
About ice cube machine mini
Where to Find Mini Ice Cube Machine Suppliers?
China remains the global epicenter for mini ice cube machine manufacturing, with key production clusters concentrated in Guangdong and Zhejiang provinces. Shenzhen and Ningbo serve as primary hubs, hosting vertically integrated supply chains that streamline component sourcing, assembly, and export logistics. These regions benefit from mature ecosystems of plastic molding, refrigeration engineering, and electronics integration, enabling rapid prototyping and scalable production.
Suppliers in these zones operate within tightly coordinated industrial networks—compressors, evaporators, molds, and control panels are sourced within 50km radii, reducing lead times by up to 25%. Average monthly output for mid-tier manufacturers exceeds 10,000 units, with some high-capacity facilities producing over 30,000 units under ODM/OEM arrangements. This infrastructure supports both standard countertop models and customized configurations for commercial kitchens, offices, and hospitality sectors.
Main materials include food-grade ABS plastic, stainless steel (for premium models), and environmentally compliant refrigerants such as R600a. Processing techniques feature automated injection molding, precision sheet metal fabrication, and hermetic compressor sealing, ensuring consistent performance across batches. Buyers gain access to cost-efficient production, with localized supply chains offering 20–30% lower unit costs compared to non-Asian manufacturers.
How to Choose Mini Ice Cube Machine Suppliers?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional dimensions:
Quality Assurance & Compliance
Verify adherence to international standards including CE, RoHS, and ISO 9001. For markets in Europe and North America, CE marking is essential for customs clearance and electrical safety compliance. Request test reports for critical parameters: cooling efficiency, noise levels (ideally ≤45 dB), cycle time (target: 6–12 minutes per batch), and daily ice yield (typically 12–45 kg/24h).
Production Capacity Verification
Assess infrastructure through documented metrics:
- Minimum factory area of 2,000m² for sustained volume output
- In-house capabilities in mold development, refrigeration system assembly, and final testing
- Dedicated R&D or engineering support for design modifications
Cross-reference on-time delivery rates (target ≥99%) and response times (≤3 hours) to gauge operational reliability.
Customization & Transaction Security
Confirm available customization options: color, logo printing, packaging, plug type (US/EU/UK/AU), water intake method, and panel interface language. Prioritize suppliers offering third-party transaction protection and sample validation before bulk orders. Require pre-shipment inspection protocols and accept payment terms tied to quality checkpoints.
What Are the Best Mini Ice Cube Machine Suppliers?
| Company Name | Location | Verified Supplier Type | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | MOQ Range | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Jiuxiang Electric Appliance Co., Ltd. | Guangdong, CN | Multispecialty Supplier | US $120,000+ | 97% | ≤4h | <15% | 1–10 pcs | $40–42 |
| Ningbo Yingyi International Trade Co., Ltd. | Zhejiang, CN | Multispecialty Supplier | US $210,000+ | 100% | ≤2h | 27% | 100 pcs | $38–87.50 |
| Ningbo Huining Electrical Co., Ltd. | Zhejiang, CN | Custom Manufacturer | US $20,000+ | 100% | ≤3h | 50% | 500 pcs | $36–190 |
| Luohe Xingdian Electromechanical Equipment Co., Ltd. | Henan, CN | Multispecialty Supplier | US $640,000+ | 99% | ≤1h | <15% | 1 set | $200–2,260 |
| Nanning Nanyuanfang Refrigeration Equipment Co., Ltd. | Guangxi, CN | Multispecialty Supplier | US $740,000+ | 99% | ≤5h | <15% | 1–2 pcs | $105–370 |
Performance Analysis
Suppliers like Ningbo Yingyi and Ningbo Huining demonstrate strong operational discipline with 100% on-time delivery and robust customization capacity. While Huining offers the lowest base pricing ($36/unit), its MOQ of 500 units suits large-scale procurement. In contrast, Shenzhen Jiuxiang provides flexible MOQs starting at one piece, ideal for market testing or niche distribution.
Ningbo-based suppliers lead in responsiveness, with average reply times under three hours—critical for iterative design coordination. Luohe Xingdian and Nanning Nanyuanfang cater to higher-end segments, offering premium stainless steel models and advanced refrigeration systems, though at significantly higher price points. Notably, Ningbo Huining stands out with a 50% reorder rate, indicating strong customer satisfaction despite limited online visibility.
For buyers prioritizing scalability and compliance, suppliers with documented customization workflows—including refrigerant type, plug configuration, and branding—are recommended. Video audits of production lines and request for functional prototypes can mitigate risks associated with remote sourcing.
FAQs
How to verify mini ice cube machine supplier reliability?
Cross-check certifications (CE, RoHS, ISO) with official databases. Request factory inspection reports or video tours confirming assembly lines and QC stations. Analyze transaction history, focusing on consistent on-time delivery (>97%) and low dispute rates.
What is the typical sampling timeline?
Standard samples take 7–14 days to produce, depending on customization level. Shipping via express courier adds 3–7 days internationally. Expect to pay 1–2x unit cost for samples, often creditable against future orders.
Can suppliers accommodate low MOQs for initial orders?
Yes, several suppliers offer MOQs as low as 1 piece for standard models. However, unit prices increase accordingly. MOQs below 100 pieces typically apply only to ready-to-ship items, not custom builds.
Do manufacturers support OEM/ODM services?
Most suppliers listed provide OEM branding (logo, packaging) and ODM modifications (color, shape, control panel). Full design changes require technical drawings and may involve mold development fees ranging from $500–$2,000, depending on complexity.
What are common lead times after order confirmation?
Lead times range from 15–30 days for containerized shipments, depending on order size and customization. Air freight reduces delivery to 5–10 days but increases logistics costs significantly. Confirm production schedules and shipping terms (FOB, CIF) upfront.










