Iceq Compact Ice Maker
About iceq compact ice maker
Where to Find Compact Ice Maker Suppliers?
China remains the central hub for compact ice maker manufacturing, with key production clusters in Zhejiang and Guangdong provinces. Ningbo and Cixi in Zhejiang account for over 50% of China’s small-scale refrigeration appliance exports, supported by mature supply chains for compressors, molds, and food-grade plastics. Shenzhen in Guangdong specializes in tech-integrated models, leveraging proximity to electronics component suppliers to reduce BOM costs by 18–22% compared to offshore producers.
These industrial ecosystems enable vertically integrated production—from injection molding and sheet metal fabrication to final assembly—within tightly coordinated networks. Suppliers benefit from localized access to certified materials, third-party testing labs, and export logistics providers, ensuring lead times of 25–35 days for standard orders. Buyers gain scalability advantages, with established factories capable of monthly outputs exceeding 50,000 units and flexibility for OEM/ODM configurations.
How to Choose Compact Ice Maker Suppliers?
Implement structured evaluation criteria to mitigate sourcing risks:
Technical Compliance
Verify adherence to international safety and performance standards, including CE, RoHS, and UL certifications where applicable. Request test reports for compressor efficiency, ice clarity, and cycle time consistency. For household-grade units, confirm compliance with IEC 60335-2-89 for refrigerating appliances.
Production Capability Assessment
Evaluate supplier infrastructure based on the following benchmarks:
- Minimum factory area of 3,000m² for sustained volume output
- In-house tooling and mold-making capabilities
- Dedicated quality control lines with leak testing and electrical safety checks
Cross-reference declared production capacity with historical online revenue and on-time delivery rates (target ≥98%) to validate operational stability.
Transaction & Quality Safeguards
Utilize secure payment mechanisms such as escrow services, especially for first-time engagements. Prioritize suppliers offering sample testing with clear return policies. Conduct virtual or on-site audits to verify self-cleaning functions, noise levels (≤45 dB), and ice production rates (typically 9–26 lbs/24h for compact models).
What Are the Leading Compact Ice Maker Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Ningbo Konwin Electrical Appliance Co., Ltd. | Zhejiang, CN | US $2,000,000+ | 100% | ≤3h | 33% | 1,000–2,600 pcs | $33–69 | Color, material, logo, packaging, label, time settings |
| Ningbo Aquart Electrical Appliance Co., Ltd. | Zhejiang, CN | US $140,000+ | 100% | ≤5h | 33% | 700–1,500 pcs | $42–54 | Material, size, logo, packaging, label, graphic |
| Cixi East Electrical Appliance Factory | Zhejiang, CN | US $590,000+ | 100% | ≤4h | 28% | 1–200 pcs | $29.50–96 | Water tank, color, capacity, display, plug, logo, packaging |
| Shenzhen Bway Tech Co., Ltd. | Guangdong, CN | US $900+ | 100% | ≤10h | <15% | 100–1,000 pcs | $34.58–120.75 | Color, material, size, logo, packaging, label, graphic |
| Luohe Ejin Machinery Co., Ltd. | Henan, CN | US $140,000+ | 98% | ≤2h | <15% | 1 set | $450–1,500 | Color, material, size, logo, packaging, label, graphic |
Performance Analysis
Ningbo-based suppliers dominate in reorder performance and responsiveness, with both Konwin and Aquart achieving 100% on-time delivery and 33% customer retention. Konwin stands out for high-volume export capacity and broad customization scope, while Cixi East offers low MOQs down to 1 piece, ideal for market testing. Shenzhen Bway provides competitive pricing at $34.58/unit but has limited transaction history and lower reorder activity. Luohe Ejin caters to commercial segments with high-end countertop and flake ice systems, though unit prices exceed $450. Buyers seeking cost-effective residential models should prioritize Zhejiang suppliers with MOQs between 700–2,600 units and verified production consistency.
FAQs
How to verify compact ice maker supplier reliability?
Confirm certifications through official databases and request product test reports from accredited labs. Analyze response times, order fulfillment history, and customer feedback focusing on post-delivery support and defect resolution timelines.
What is the typical sampling timeline?
Sample production takes 7–14 days for standard models. Customized units require 15–21 days depending on design complexity. Air shipping adds 5–8 days for international delivery.
Can suppliers accommodate low MOQs?
Yes, select manufacturers like Cixi East offer MOQs as low as 1 piece for certain models, enabling prototyping and small-batch trials. Volume pricing applies at 700+ units across most factories.
Do suppliers support OEM/ODM customization?
Extensive customization is available, including color, housing material, control panel layout, branding, packaging, and functional adjustments like timer settings and water tank capacity. Most suppliers provide design support and 2D/3D mockups within 72 hours.
What are standard lead times after order confirmation?
Lead times range from 25–35 days for full container loads. Production begins within 3–5 days after deposit receipt and approval of technical drawings. Sea freight transit to North America or Europe typically requires 18–28 days.










