Kogan Ice Cube Maker
CN
About kogan ice cube maker
Where to Find Kogan Ice Cube Maker Suppliers?
China remains the central hub for commercial ice-making equipment manufacturing, with key supplier clusters concentrated in Guangdong and Guangxi provinces. These regions host vertically integrated production ecosystems specializing in refrigeration systems, stainless steel fabrication, and automated control panels—core components of high-capacity ice cube makers. Guangzhou and Nanning serve as primary logistics and manufacturing centers, offering proximity to port infrastructure and raw material suppliers, reducing lead times by up to 25% compared to non-specialized regions.
The industrial concentration enables efficient access to OEM and ODM services, particularly for compact to mid-range commercial units producing 30–500 kg of ice per 24 hours. Facilities in these zones typically operate under ISO-aligned quality management frameworks and maintain in-house R&D teams focused on energy efficiency, compressor integration, and cooling cycle optimization. Buyers benefit from scalable production capacities, with some manufacturers capable of fulfilling container-sized orders within 30–45 days, depending on customization level and component availability.
How to Choose Kogan Ice Cube Maker Suppliers?
Procurement decisions should be guided by rigorous evaluation criteria to ensure product reliability, compliance, and supply chain continuity:
Technical Compliance & Certifications
Verify adherence to international safety and performance standards. CE certification is essential for European market entry, while UL-listed electrical configurations are required for North American distribution. Confirm that compressors are sourced from reputable brands (e.g., Bitzer, Danfoss) and that refrigerants comply with environmental regulations such as F-gas or RoHS directives. Request test reports for insulation integrity, water consumption rates, and continuous operation cycles.
Production Capability Assessment
Evaluate supplier infrastructure based on the following benchmarks:
- Minimum factory area exceeding 3,000m² for stable batch production
- In-house capabilities in sheet metal forming, welding, and electrical panel assembly
- Integration of PLC-based control systems and evaporator testing chambers
Cross-reference claimed output capacity with verified online transaction volume and reorder metrics. Prioritize suppliers with documented on-time delivery rates above 98% and response times under 5 hours.
Transaction Security & Quality Assurance
Utilize secure payment mechanisms such as escrow services to mitigate risk during initial engagements. Require sample testing under real-world conditions, assessing ice clarity, cycle consistency, and power draw over a 72-hour period. Insist on third-party inspection reports (e.g., SGS, BV) before shipment, especially for bulk orders. Confirm packaging specifications include waterproof wrapping and shock-absorbing palletization for sea freight resilience.
What Are the Best Kogan Ice Cube Maker Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Customization Options | Key Product Range (Ice Output) |
|---|---|---|---|---|---|---|---|---|
| Guangzhou Desen Electrical Appliances Co., Ltd. | Guangdong, CN | US $200,000+ | 100% | ≤3h | 41% | 1–5 pieces | Voltage, plug type, capacity | 100–500 kg/24h |
| Nanning Nanyuanfang Refrigeration Equipment Co., Ltd. | Guangxi, CN | US $740,000+ | 99% | ≤5h | <15% | 1 piece | Cycle time, shape, refrigerant, logo | 60–500 kg/24h |
| NINGBO KAISON ELECTRIC APPLIANCE CO.,LTD | Zhejiang, CN | US $120,000+ | 100% | ≤1h | 15% | 3–100 pieces | OEM, color, size, packaging | 30–80 kg/24h |
| Shanghai Kendall Electromechanical Equipment Co., Ltd. | Shanghai, CN | US $2,000+ | - | ≤16h | <15% | 1 set | Compressor brand, cooling method, voltage | 500–20,000 kg/24h |
| Guangzhou Dubang Electrical Appliances Co., Ltd. | Guangdong, CN | US $30,000+ | 83% | ≤10h | 66% | 1 piece/set | Limited customization | 100–400 kg/24h |
Performance Analysis
Guangzhou Desen stands out with a 100% on-time delivery rate and strong reorder frequency (41%), indicating reliable operational execution and customer satisfaction. Nanning Nanyuanfang leads in revenue volume and offers extensive customization across refrigerant types and ice shapes, though its lower reorder rate suggests potential gaps in post-sale engagement. NINGBO KAISON excels in responsiveness (≤1 hour) and supports low-volume OEM projects, making it ideal for niche market entries. Shanghai Kendall targets large-scale industrial clients with outputs up to 20 tons/day but lacks verifiable delivery performance data, introducing procurement risk. Guangzhou Dubang demonstrates high customer retention (66% reorder rate), reflecting consistent product quality despite slower response times. Buyers seeking rapid iteration should prioritize suppliers with sub-5-hour response windows and documented CE or ISO certifications.
FAQs
How to verify kogan ice cube maker supplier reliability?
Validate certifications through official registries and request factory audit reports. Analyze transaction history, focusing on consistent order fulfillment and dispute resolution records. Conduct video audits to confirm production line automation and quality inspection checkpoints.
What is the typical MOQ and pricing range?
MOQ varies from 1 piece for standard models to 100 pieces for portable OEM units. Prices range from $140 for compact 30kg/day units to over $3,600 for 1,000kg+ industrial machines, influenced by compressor type, cooling method, and certification requirements.
Do suppliers offer customization options?
Yes, leading manufacturers support voltage adaptation (110V/220V), plug configuration, branding, and structural modifications. Some provide full OEM packaging and UI panel design for private-label deployments in hospitality or retail sectors.
What are standard lead times and shipping methods?
Lead times average 25–35 days after sample approval. Sea freight is standard for bulk shipments; air freight is available for samples or urgent deliveries at higher cost. Confirm FOB terms and destination port handling procedures early in negotiation.
Can I request a pre-shipment product sample?
Most suppliers allow sample orders at 1.5–2x unit price, often creditable against future bulk purchases. Expect 7–14 days for sample production and 5–10 days for international delivery via express carriers.









