Machine Lathe
About machine lathe
Where to Find Machine Lathe Suppliers?
China remains the global epicenter for machine lathe manufacturing, with key production clusters in Shandong, Guangdong, and Jiangsu provinces. These regions host vertically integrated supply chains that support rapid prototyping and high-volume production of both manual and CNC lathes. Tengzhou in Shandong Province, historically known as a hub for machine tool manufacturing, accounts for over 40% of China’s domestic lathe output, offering buyers access to mature ecosystems combining foundries, precision machining workshops, and component suppliers within tight geographic proximity.
The industrial infrastructure enables competitive advantages in cost and lead time. Localized steel sourcing and in-house casting capabilities reduce material procurement cycles by up to 25%. Buyers benefit from average production lead times of 30–45 days for standard models, with customization lead times extending to 60 days depending on control system complexity. Economies of scale allow suppliers to offer 15–30% lower pricing compared to European or North American manufacturers, particularly for entry-level and mid-range turning equipment.
How to Choose Machine Lathe Suppliers?
Selecting reliable partners requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical Compliance & Equipment Range
Verify supplier specialization in either manual, CNC, or used machinery, as core competencies vary significantly. Prioritize suppliers listing CNC lathes, surface grinding machines, or machining centers among main products—indicative of advanced manufacturing capability. For export compliance, confirm adherence to international safety standards such as CE or ISO 12100 for mechanical safety. Request documentation on spindle accuracy (runout ≤0.005mm), backlash compensation, and servo motor integration.
Production and Customization Capacity
Assess scalability through facility indicators and service offerings:
- Suppliers with customization options (e.g., swing diameter, threading types, CNC control interfaces) typically maintain dedicated engineering teams
- In-house CAD design and control programming suggest stronger adaptability for non-standard configurations
- Demonstrated online revenue exceeding US $100,000 signals consistent order volume and market validation
Cross-reference stated capabilities with product listings—suppliers offering multiple variants (e.g., mini metal lathes, horizontal turning centers) are more likely to support modular design adjustments.
Transaction Reliability Indicators
Leverage performance metrics to mitigate risk:
- On-time delivery rates ≥95% correlate with stable production planning
- Response times ≤2 hours indicate active account management
- Reorder rates above 30% reflect customer retention and post-sale satisfaction
For higher-value purchases, require third-party inspection services prior to shipment and utilize secure payment mechanisms tied to milestone verification.
What Are the Best Machine Lathe Suppliers?
| Company Name | Specialization Type | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Product Range (Units Listed) |
|---|---|---|---|---|---|---|---|---|
| Tengzhou City Dongyi Risheng Machine Tool Co., Ltd. | Custom Manufacturer | Manual Lathe, CNC Lathe, Machining Centre | US $80,000+ | 100% | ≤2h | 40% | Yes | 15 |
| Dongguan Ruiyee Machinery Co., Ltd. | Multispecialty Supplier | Mini Metal Lathe, Milling Equipment | US $190,000+ | 100% | ≤2h | <15% | Yes | 3 |
| Dongguan BH Mechanical Equipment Company Limited | Used Equipment Specialist | Used CNC Lathe, Horizontal Turning Machines | US $50,000+ | 100% | ≤4h | <15% | No | 3 |
| Shanghai Tongchen Import Export Co., Ltd. | Custom Manufacturer | Mini CNC Lathe, Manual Metal Lathes | US $100,000+ | 89% | ≤6h | 15% | Yes | 5 |
| ZHONGSHAN BAIYIXING LIGHT GROUP CO., LTD | General Industrial Supplier | CNC Lathe, Mini Metal Lathes | Not Available | Not Available | ≤3h | Not Available | No | 3 |
Performance Analysis
Tengzhou City Dongyi Risheng stands out with a 40% reorder rate and full on-time delivery record, suggesting strong customer loyalty and process reliability. Despite moderate online revenue, its broad product range and customization capabilities position it well for tailored procurement. Dongguan Ruiyee reports the highest revenue (US $190,000+) and fast response times, though its low reorder rate may indicate limited post-sale engagement or niche market positioning. Shanghai Tongchen offers extensive customization—including CNC controls, servo motors, and threading options—but its 89% on-time delivery rate warrants closer logistics scrutiny before large-scale ordering. Dongguan BH specializes in used and imported CNC lathes (e.g., MAZAK), serving budget-conscious buyers needing industrial-grade performance at reduced capital cost. ZHONGSHAN BAIYIXING lacks verified performance data but provides competitively priced entry-level models suitable for small workshops or educational use.
FAQs
How to verify machine lathe supplier reliability?
Validate technical claims through facility videos showing CNC machining centers and assembly lines. Confirm quality management practices via ISO 9001 certification and request test reports on spindle runout, bed flatness, and vibration levels. Analyze transaction history for consistency in delivery performance and dispute resolution.
What is the typical MOQ and pricing range?
Most suppliers list a minimum order quantity (MOQ) of 1 piece, enabling sample procurement. Pricing varies widely: mini manual lathes start at $250/unit, while used CNC systems range from $2,250 to $35,000 depending on brand, age, and condition. New CNC lathes typically start around $1,000–$1,800 per unit for basic configurations.
Can suppliers customize machine lathes?
Yes, select manufacturers offer customization in swing diameter, motor power (e.g., 900W–1100W), control type (CNC or manual), chuck configuration (pneumatic/mechanical), and branding (logo, packaging). Full CAD-based modifications require engineering collaboration and may extend lead times by 2–3 weeks.
Do suppliers provide samples?
Sample availability depends on model and supplier policy. Some manufacturers offer single-unit orders for testing, though buyers should expect to cover full production cost. For customized units, a deposit of 30–50% is typically required before prototype development.
What are common lead times and shipping options?
Standard lead times range from 15–30 days for stock items, increasing to 45–60 days for custom-built CNC lathes. Sea freight is standard for bulk shipments due to weight and dimensional constraints. Air freight is viable only for compact mini-lathes and incurs significant surcharges. Confirm FOB terms and destination port regulations for heavy machinery import clearance.









