Portable Ice Maker Nugget Ice
CN
About portable ice maker nugget ice
Where to Find Portable Ice Maker (Nugget Ice) Suppliers?
China remains the central hub for portable nugget ice maker production, with key manufacturing clusters in Guangdong and Zhejiang provinces. These regions host vertically integrated supply chains that streamline component sourcing—compressors, evaporators, molds, and control systems—enabling rapid prototyping and scalable output. Shenzhen and Guangzhou specialize in consumer-grade appliances, offering compact, energy-efficient models suited for household, office, and hospitality use. Cixi in Zhejiang province is recognized for its electrical appliance ecosystem, supporting high-volume production of mid-tier units with modular designs.
The industrial advantage lies in localized access to injection molding, sheet metal fabrication, and refrigeration system assembly within 50km radii. This integration reduces logistics overhead and accelerates lead times to 25–40 days for standard orders. Suppliers in these zones typically maintain monthly production capacities ranging from 10,000 to 50,000 units, depending on automation levels. Buyers benefit from 15–30% cost efficiencies compared to non-Asian manufacturers due to lower labor costs, mature supplier networks, and government-backed export incentives.
How to Choose Portable Ice Maker (Nugget Ice) Suppliers?
Procurement decisions should be guided by structured evaluation criteria:
Technical and Quality Compliance
Verify adherence to international safety and performance standards such as CE, RoHS, and UL where applicable. Request test reports for compressor efficiency, condensation management, and cycle durability (minimum 1,000 operational cycles). For food-contact components, confirm FDA-compliant materials are used in water tanks and ice chutes.
Production Capacity Verification
Assess infrastructure maturity through measurable indicators:
- Facility size exceeding 3,000m² indicates capacity for batch production
- In-house tooling and mold-making capabilities reduce customization lead time
- Presence of automated assembly lines improves consistency and throughput
Cross-reference declared output with verified online revenue data and on-time delivery records (target ≥95%) to assess reliability.
Transaction and Customization Readiness
Prioritize suppliers offering third-party transaction protection and documented quality control processes. Evaluate responsiveness (target ≤8 hours) and reorder rates as proxies for customer satisfaction. Confirm support for OEM/ODM services including logo imprinting, color variation, packaging redesign, and voltage adaptation for global markets.
What Are the Best Portable Ice Maker (Nugget Ice) Suppliers?
| Company Name | Location | Verified Supplier | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | MOQ Range | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Bway Tech Co., Ltd. | Guangdong, CN | Multispecialty Supplier | US $900+ | 100% | ≤10h | <15% | 100–200 pcs | $91.28–124.26 |
| Guangzhou Universal Venture Holding Co.,Ltd | Guangdong, CN | - | US $210,000+ | 100% | ≤7h | 33% | 1–2 pcs | $33.60–628.00 |
| Cixi East Electrical Appliance Factory | Zhejiang, CN | Multispecialty Supplier | US $590,000+ | 100% | ≤4h | 28% | 200–1,000 pcs | $70.00–96.00 |
| Suzhou Iceman Refrigeration Equipment Co., Ltd. | Jiangsu, CN | - | US $40,000+ | 50% | ≤4h | 27% | 1 pc | $131.00–1,299.00 |
| Xiamen Sunford Industry Trade Co., Ltd. | Fujian, CN | Multispecialty Supplier | US $290,000+ | 100% | ≤5h | 15% | 200–585 pcs | $46.33–126.95 |
Performance Analysis
Guangzhou Universal Venture stands out for low MOQ flexibility (as low as 1 piece), making it ideal for sample testing or niche market entry. Cixi East Electrical Appliance Factory demonstrates strong production volume readiness with sub-$75 pricing at 1,000-piece MOQs, supported by a robust US $590,000+ annual digital sales record. Shenzhen Bway Tech and Xiamen Sunford offer balanced portfolios with full customization paths and consistent on-time delivery. Suzhou Iceman, while technically specialized, presents higher risk due to a 50% on-time delivery rate despite advanced commercial-grade offerings. Suppliers based in Zhejiang and Guangdong exhibit superior responsiveness, with three achieving ≤5-hour average reply times—critical for iterative design coordination.
FAQs
How to verify portable ice maker supplier reliability?
Validate certifications through official databases and request factory audit reports or video walkthroughs. Analyze historical transaction metrics such as on-time delivery, reorder frequency, and response latency. Test communication clarity during technical inquiries about refrigerant type (e.g., R134a, R600a), power requirements (110V vs. 220V), and noise levels (dB ratings).
What is the typical sampling timeline?
Standard samples take 10–18 days to produce. Customized units with branded elements or modified cooling systems require 20–30 days. Air shipping adds 5–10 days for international delivery. Some suppliers offer free samples contingent on future bulk orders (e.g., >500 units).
Can suppliers accommodate global shipping and compliance?
Yes, most experienced exporters manage FOB, CIF, and DDP terms. Confirm compatibility with regional electrical codes (UL for North America, CE for EU), and ensure product documentation includes multilingual manuals and compliance labels. Pre-shipment inspections via SGS or Bureau Veritas can mitigate customs risks.
Do suppliers support customization?
Leading suppliers offer comprehensive customization: housing color, logo printing, plug types, packaging design, and control panel language. Factories like Shenzhen Bway Tech and Xiamen Sunford explicitly list graphic, material, and capacity modifications as available options. Minimum order thresholds apply, typically starting at 500 units for full OEM configurations.
What are common MOQ and pricing structures?
MOQs range from 1 piece (for premium models) to 1,000 pieces for cost-optimized runs. Unit prices vary significantly by output capacity and materials—compact desktop models start below $40, while higher-output portable units (20+ kg/24h) range between $90–$130. Volume discounts are standard beyond 500 units, with potential savings of 8–15%.










