Projector Game Console Producer
About projector game console producer
Where to Find Projector Game Console Producers?
China remains the dominant hub for projector-integrated game console manufacturing, with Shenzhen serving as the primary industrial cluster. The city’s ecosystem of electronics OEMs and ODMs offers end-to-end production capabilities, from optical engine assembly to embedded software integration. These manufacturers specialize in hybrid devices combining HD projection, Android-based operating systems, and preloaded gaming platforms, targeting mid-tier consumer markets in North America, Europe, and Southeast Asia.
Suppliers leverage vertically integrated supply chains for key components such as LED light sources, LCD/DLP optics, and system-on-chip (SoC) units, enabling rapid prototyping and scalable production. Most facilities operate under ISO 9001-aligned quality management systems, with CE and RoHS compliance commonly documented for export readiness. Average monthly output across verified producers ranges from 5,000 to 20,000 units, supporting both bulk procurement and low-volume customized runs.
How to Choose Projector Game Console Suppliers?
Procurement decisions should be guided by objective evaluation criteria to mitigate risks related to product performance, delivery consistency, and post-sale support.
Technical Capability Verification
Confirm that suppliers specify core technical parameters including native resolution (720P–4K), lumens output (≥800 ANSI), supported video decoding formats (H.265, VP9), and HDMI/USB connectivity standards. Devices typically run on Android 9.0 or higher, with built-in storage ranging from 16GB to 64GB. Request firmware SDK access if custom UI or boot animation integration is required.
Production & Customization Capacity
Evaluate supplier flexibility based on:
- Minimum Order Quantity (MOQ): Ranges from 1–5 pieces for sample validation; bulk orders often require 500+ units
- Customization scope: Includes branding (logo, packaging), OS skinning, pre-installed applications, plug type regionalization, and hardware configuration adjustments
- Lead time: Typically 15–25 days after deposit confirmation, depending on order size and customization level
Supplier Reliability Indicators
Prioritize partners demonstrating high operational efficiency:
- On-time delivery rate ≥99%
- Average response time ≤3 hours
- Reorder rate below 22%, indicating stable customer acquisition rather than dependency on repeat buyers
- Verified online transaction volume exceeding US $100,000 annually
What Are the Leading Projector Game Console Producers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Product Range | Customization Support |
|---|---|---|---|---|---|---|---|
| Shenzhen Topleo Technology Limited | Home, outdoor, 4K projectors with gaming functions | US $480,000+ | 99% | ≤3h | <15% | 4 models | Color, packaging, chipset, battery, HDMI logo, video decoding |
| Shenzhen Mooden Electronics Co., Ltd. | X10, S40, M300 series gaming projectors | US $490,000+ | 99% | ≤2h | <15% | 5 models | Color, label, brightness, throw ratio, plug design, logo |
| Shenzhen Onekey Technology Development Co., Ltd. | HY300PRO, HY320MINI smart game consoles with projection | US $310,000+ | 99% | ≤2h | 21% | 4 models | Boot animation, UI, projector size, color, Netflix integration |
| Shenzhen Hong Rong Xin Electronics Co., Ltd. | L-series mini projectors with built-in games | US $110,000+ | 96% | ≤3h | <15% | 5 models | Limited (based on listed accessories) |
| Shenzhen Zilikai Electronic Co., Ltd. | HCS350, X10, S40 Pro Max gaming projectors | US $20,000+ | 100% | ≤2h | 22% | 5 models | Basic hardware configurations |
Performance Analysis
Shenzhen Topleo and Mooden lead in revenue volume and customization depth, offering comprehensive OEM/ODM services suitable for branded distribution. Both maintain sub-3-hour response times and 99% on-time fulfillment, critical for time-sensitive campaigns. Shenzhen Onekey distinguishes itself with advanced UI-level customization, including animated boot screens and tailored OS interfaces—ideal for niche market positioning. While Zilikai reports a perfect 100% delivery rate, its lower annual revenue suggests limited scalability for large-scale orders. Hong Rong Xin maintains a broad accessory portfolio but shows relatively lower delivery reliability at 96%. Buyers seeking high-volume, technically consistent output should prioritize suppliers with documented firmware control and optical testing procedures.
FAQs
How to verify projector game console supplier reliability?
Cross-check declared certifications (CE, RoHS) through official databases. Request evidence of in-house quality testing, including lumen decay reports, thermal endurance cycles, and HDMI signal compatibility logs. Analyze transaction history via trade assurance programs and validate customer feedback on delivery accuracy and product conformity.
What is the typical sampling timeline?
Standard samples are produced within 7–12 days. Customized units requiring firmware modifications or unique housing designs take 15–20 days. Air shipping adds 5–8 business days internationally. Sample costs typically range from $28–$50 per unit, partially refundable against future orders.
Do these manufacturers support global shipping?
Yes, all listed suppliers offer international logistics via express, air, or sea freight. FOB terms are standard; CIF options available upon request. Ensure compliance with destination regulations regarding electrical safety (e.g., FCC, UKCA) and digital content licensing where applicable.
Can I request private labeling and packaging customization?
Full branding customization is widely supported, including custom box design, user manual localization, sticker labels, and device engraving. Minimum quantities for fully customized packaging typically start at 500 units, though some suppliers accept smaller batches at increased unit cost.
How to initiate technical customization?
Submit detailed specifications covering desired resolution, brightness, supported input formats, OS version, preloaded apps, and physical dimensions. Reputable suppliers will provide engineering feedback within 48 hours and deliver functional prototypes within 3 weeks for approval prior to mass production.









