Ram Ddr3 8gb
About ram ddr3 8gb
Where to Find RAM DDR3 8GB Suppliers?
China remains a central hub for memory module manufacturing, with Shenzhen and Guangzhou serving as key production centers for DDR3 8GB RAM. These regions host vertically integrated supply chains encompassing IC packaging, PCB fabrication, and final assembly, enabling rapid prototyping and scalable output. The concentration of semiconductor component suppliers within the Pearl River Delta reduces logistics overhead and supports just-in-time production models.
Suppliers in this ecosystem typically operate automated SMT (Surface Mount Technology) lines capable of high-volume output, with many facilities equipped for both industrial-grade and consumer-oriented memory modules. This infrastructure allows consistent production of DDR3L and standard DDR3 variants, meeting JEDEC specifications for voltage (1.35V/1.5V), clock speeds (1333–1600 MHz), and latency profiles. Buyers benefit from localized access to DRAM die sources, test equipment, and firmware programming tools, contributing to shorter lead times—typically 15–25 days for batch orders—and cost efficiency compared to non-Asian markets.
How to Choose RAM DDR3 8GB Suppliers?
Selecting reliable suppliers requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Compliance
Verify adherence to industry standards including JEDEC DDR3 specifications, RoHS compliance for hazardous substance restrictions, and compatibility testing across major chipset platforms (Intel and AMD). Request validation reports for signal integrity, thermal performance, and burn-in testing under sustained load conditions. For integration into industrial or embedded systems, confirm support for ECC (Error-Correcting Code) or non-ECC configurations as required.
Production Capability Verification
Assess core manufacturing competencies through the following indicators:
- Automated testing stations with >95% fault detection coverage
- In-house capability for PCB design, BIOS integration, and SPD programming
- Support for both SO-DIMM (laptop) and U-DIMM (desktop) form factors
Cross-reference on-time delivery rates (target ≥97%) and response times (ideally ≤3 hours) as proxies for operational reliability and customer service responsiveness.
Transaction Safeguards
Prioritize suppliers with documented quality management systems and verifiable transaction histories. Utilize secure payment frameworks that align financial release with shipment milestones. Conduct sample testing to benchmark read/write speeds, stability under overclocked conditions, and long-term endurance before scaling procurement. Confirm labeling, anti-static packaging, and ESD-safe handling protocols for product integrity during transit.
What Are the Best RAM DDR3 8GB Suppliers?
| Company Name | Location | Type | Main Products | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue | Customization |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Elsky Technology Co., Ltd. | Shenzhen, CN | Custom Manufacturer | Motherboards, Mini PCs, Industrial Computers | 97% | ≤3h | 36% | US $3.9M+ | Yes |
| Dunao (Guangzhou) Electronics Co., Ltd. | Guangzhou, CN | - | Gaming PCs, Motherboards, Power Supplies | 97% | ≤2h | 53% | US $1.2M+ | No |
| Shenzhen Flashnoble Technology Co., Ltd. | Shenzhen, CN | Multispecialty Supplier | Memory Modules, DDR4/DDR5 Upgrades | 98% | ≤4h | <15% | US $5.0M+ | Yes |
| Shenzhen Kamer Technology Limited | Shenzhen, CN | - | RAMs, Hard Drives, CPUs | 100% | ≤5h | 23% | US $50K+ | No |
| SHENZHEN LONG TERM INTERNATIONAL LIMITED | Shenzhen, CN | Custom Manufacturer | RGB RAM, Desktop & Laptop Memory | 100% | ≤2h | 34% | US $390K+ | Yes |
Performance Analysis
SHENZHEN LONG TERM INTERNATIONAL LIMITED and Shenzhen Kamer Technology Limited achieve perfect on-time delivery records (100%), indicating strong logistical control and inventory management. Dunao Electronics stands out with a 53% reorder rate—the highest among peers—suggesting strong buyer satisfaction despite moderate response time. Shenzhen Flashnoble leads in revenue volume (US $5M+), reflecting extensive market reach, though its low reorder rate (<15%) may indicate transactional rather than relationship-based buying patterns.
Suppliers offering customization—such as color-coded heatsinks, branded labels, or tailored SPD settings—are primarily those identified as custom manufacturers. These partners support OEM/ODM projects requiring private labeling, specific timing parameters, or integration into proprietary computing platforms. For standardized replacements or bulk upgrades, suppliers like Dunao and Kamer offer competitive pricing with minimal MOQs (as low as 6 pieces), enhancing flexibility for small-to-mid volume buyers.
FAQs
How to verify RAM DDR3 8GB supplier reliability?
Cross-check declared certifications (e.g., ISO, RoHS) with official databases. Request evidence of functional testing procedures, including temperature cycling and compatibility validation across motherboards. Analyze historical order data focusing on dispute resolution frequency and return rates for defective units.
What is the typical sampling timeline?
Standard sample production takes 7–14 days, depending on configuration. Custom-labeled or performance-tuned modules may require up to 21 days. Air shipping adds 5–10 business days for international delivery. Some suppliers offer reduced or waived sample fees upon commitment to volume orders.
Can suppliers ship globally?
Yes, most suppliers have export experience and manage international logistics via express carriers or sea freight for containerized orders. Confirm Incoterms (FOB, CIF), customs documentation, and compliance with destination country regulations for electronic components.
Do suppliers provide free samples?
Policies vary. Established suppliers may offer paid samples (covering material and handling) with credit applied toward first orders. Free samples are typically reserved for qualified buyers placing anticipated orders exceeding 100 units.
How to initiate customization requests?
Submit detailed specifications including module type (SO-DIMM/U-DIMM), speed grade, voltage, latency (CL-tRCD-tRP-tRAS), PCB color, label design, and packaging format. Reputable manufacturers respond with technical feasibility assessments within 48–72 hours and provide prototypes within 2–3 weeks.









