Scrubber Packing Machine Automatic
CN
CN
CN
About scrubber packing machine automatic
Where to Find Scrubber Packing Machine Automatic Suppliers?
China remains the global epicenter for automated packaging machinery manufacturing, with key production clusters in Shandong, Jiangsu, and Guangdong provinces. Shandong and Jiangsu host specialized industrial zones focused on home product making machinery, particularly scourer and sponge processing equipment. These regions benefit from vertically integrated supply chains—encompassing wire drawing, mesh fabrication, and plastic film extrusion—that reduce component procurement lead times by 25–40% compared to decentralized markets.
The concentration of technical expertise and supporting infrastructure enables suppliers to offer fully automated scrubber packing systems with integrated cutting, counting, wrapping, and sealing functions. Facilities in Suzhou and Foshan are equipped with CNC machining centers and servo-driven assembly lines, allowing precise control over packaging speed (60–120 units per minute) and format flexibility. Buyers gain access to standardized machine platforms (e.g., YB-250, YB-350 series) that support rapid deployment, while larger factories maintain R&D departments to customize feeding mechanisms and changeover protocols for diverse scrubber geometries.
How to Choose Scrubber Packing Machine Automatic Suppliers?
Effective supplier evaluation requires a structured approach across three core dimensions:
Technical Capability Verification
Confirm that suppliers possess in-house engineering teams capable of designing control systems (typically PLC + HMI interface) and mechanical integration. Machines should support multiple packaging formats (pillow bags, flow wraps, blister packs) and accommodate materials such as PP, PET, and PVC films. Demand operational documentation including electrical schematics, pneumatic diagrams, and user manuals in English. For export compliance, verify CE marking or equivalent safety certifications where applicable.
Production Infrastructure Assessment
Evaluate manufacturer scale through objective metrics:
- Minimum factory area exceeding 3,000m² to ensure stable output
- In-house fabrication capabilities for critical components (forming tubes, sealing jaws, feed rollers)
- Demonstrated monthly production capacity of at least 20 units per model
Cross-reference online revenue indicators and reorder rates: suppliers with reorder rates above 30% and response times under 6 hours typically exhibit higher service reliability.
Transaction Risk Mitigation
Utilize secure payment frameworks that tie disbursements to verifiable milestones—such as pre-shipment inspection reports or third-party quality audits. Prioritize suppliers offering trial runs via video or remote monitoring before shipment. Insist on detailed machine specifications prior to order confirmation, including power requirements (typically 380V/50Hz), compressed air needs (0.6–0.8 MPa), and dimensional footprint.
What Are the Best Scrubber Packing Machine Automatic Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Response Time | Reorder Rate | Price Range (USD) | Min. Order |
|---|---|---|---|---|---|---|---|---|
| Suzhou YangBang Machinery Co., Ltd | Jiangsu, CN | Multi-Function Packaging Machines, Flow Packaging Lines | US $560,000+ | 100% | ≤3h | 64% | $3,900–$4,600 | 1 set |
| Foshan Boshi Packing Machinery Co., Ltd. | Guangdong, CN | Wrapping Machines, Filling & Sealing Systems | US $250,000+ | 100% | ≤6h | 35% | $3,199–$12,500 | 1 set |
| Foshan Soonpack Automation Equipnent Co., Ltd. | Guangdong, CN | Automatic Sponge & Scouring Pad Packers | US $30,000+ | 100% | ≤2h | 28% | $1,900–$17,800 | 1 set |
| Shandong Qidian Machinery Equipment Co., Ltd. | Shandong, CN | Scourer Making Machines, Knitting & Cleaning Tools | US $400+ | 66% | ≤5h | <15% | $1,143–$4,900 | 1 unit/set |
| Lanzhou Limac Machinery Works Co., Ltd. | Gansu, CN | Soap & Chemical Product Packaging Systems | US $400+ | - | ≤21h | <15% | $3,000–$20,000 | 1 set |
Performance Analysis
Suzhou YangBang stands out with the highest reorder rate (64%) and consistent delivery performance, indicating strong customer satisfaction and process stability. Foshan-based suppliers demonstrate superior responsiveness and broader packaging functionality, with Boshi and Soonpack both achieving 100% on-time delivery. Notably, Soonpack offers the widest price range, reflecting capability in both entry-level and high-speed configurations. In contrast, Shandong Qidian and Lanzhou Limac show limited transaction volume and slower response cycles, suggesting potential constraints in post-sales support or scalability. Buyers seeking proven automation platforms should prioritize suppliers with documented packaging line integrations and multi-market export experience.
FAQs
What is the typical lead time for automatic scrubber packing machines?
Standard models are typically delivered within 20–35 days after deposit confirmation. Customized systems with modified tooling or control interfaces may require 45–60 days. Peak manufacturing periods (Q1 and Q4) can extend timelines by up to 10 days due to higher order volumes.
What are common customization options available?
Suppliers commonly offer adjustments to bag length (100–300mm), film width (up to 400mm), and feeding mechanism type (vibratory tray, belt conveyor, robotic pick-and-place). Additional features include nitrogen flushing, date coding, multi-head weighers, and IoT-enabled monitoring systems for predictive maintenance.
Do suppliers provide installation and training support?
Most manufacturers include basic setup guidance and operation manuals. Advanced support—such as on-site commissioning or technician training—is often available at additional cost. Remote assistance via video call is standard practice for troubleshooting initial startup issues.
What are the minimum order quantity (MOQ) policies?
The prevailing MOQ is one set, allowing small-scale buyers to procure single units for testing or low-volume production. Some suppliers waive container loading fees for orders of 5+ units, improving cost efficiency for full-container shipments.
How is machine quality assured before shipment?
Reputable suppliers conduct functional tests lasting 4–8 hours to validate sealing integrity, sensor accuracy, and system stability. Buyers can request test videos or arrange third-party inspections (e.g., SGS, BV) prior to dispatch. Retention of partial payment until successful destination testing is a recommended risk mitigation strategy.









