Sensor Light Switch
About sensor light switch
Where to Find Sensor Light Switch Suppliers?
China remains the global hub for sensor light switch manufacturing, with production concentrated in Guangdong Province—particularly Shenzhen and Huizhou. These regions host vertically integrated supply chains combining electronic component sourcing, PCB assembly, and smart lighting R&D. The proximity to semiconductor suppliers and logistics infrastructure enables rapid prototyping and scalable production, supporting MOQs as low as 1–5 pieces for sample validation and volume orders exceeding 10,000 units monthly.
Suppliers leverage automated SMT lines and in-house testing labs to maintain consistent output quality across PIR, microwave radar, voice-activated, and hand-wave induction technologies. Integration of IoT protocols such as Zigbee and Tuya is increasingly common, aligning with demand for smart home compatibility. Buyers benefit from localized ecosystems where design, molding, surface finishing, and packaging are managed under one roof, reducing lead times to 15–25 days for standard orders and enabling cost reductions of 20–35% compared to Western-based manufacturers.
How to Choose Sensor Light Switch Suppliers?
Effective supplier selection requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical & Functional Validation
Verify product specifications against application requirements, including voltage range (commonly 5V–24V DC or 110V–240V AC), detection method (PIR, microwave, ultrasonic), response time, and environmental resilience. Confirm compliance with international standards such as CE, RoHS, and FCC for market-specific regulatory clearance. Request test reports on sensor sensitivity, false-trigger resistance, and cycle durability (minimum 50,000 operations).
Production & Customization Capability
Assess suppliers' ability to support customization:
- Options for color, material (PC/ABS), size, logo imprinting, and packaging labeling
- In-house engineering teams for circuit modification or protocol integration (e.g., Wi-Fi/Zigbee)
- Tooling and mold development capacity for unique form factors
Prioritize suppliers offering sample prototypes within 7–10 days and batch production scalability above 50,000 units/month.
Quality Assurance & Transaction Security
Evaluate on-time delivery performance (target ≥96%) and reorder rates as indicators of reliability. A low reorder rate may reflect inconsistent quality or poor post-sales service. Response time ≤2 hours suggests strong customer support infrastructure. Where available, review verified revenue data as a proxy for operational scale. Utilize secure payment mechanisms and request pre-shipment inspection rights to mitigate fulfillment risks.
What Are the Best Sensor Light Switch Suppliers?
| Company Name | Main Products | On-Time Delivery | Reorder Rate | Avg. Response | Online Revenue | Customization | Sample MOQ | Key Product Features |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Tuodi Electronics Co., Ltd. | Smart Home Lights, LED Sensor Lights, Wall Switches | 100% | <15% | ≤1h | US $4,000+ | No | 1–2 pcs | Microwave motion sensing, Tuya/Zigbee integration, 5–24V DC operation |
| Huizhou Shunyi Technology Co., Ltd. | Hand-Wave Induction, Bluetooth Music Mirror Switches | 100% | 36% | ≤1h | US $130,000+ | Yes | 5 pcs | Time/temperature display, RGB lighting control, multi-function bathroom switches |
| Foshan Innova Technology Co.Ltd | Inductive Switches, LED Mirror Sensors | 96% | 30% | ≤2h | US $40,000+ | No | 2–10 pcs | Touch and hand-sweep activation, 12V DC systems for cabinetry and mirrors |
| Shenzhen Rizhengda Lighting Appliance Co., Ltd. | PIR Sensors, Smart Bulbs, Ceiling Lights | 66% | <15% | ≤4h | US $500+ | No | 1 pc | Voice control, auto ON/OFF PIR detection, microwave radar switches |
| Shenzhen Suenw Sensor Co., Ltd. | Optical, Proximity, Safety Sensors | 100% | <15% | ≤3h | US $700+ | No | Not specified | Broad sensor portfolio including inductors and ultrasonic modules |
Performance Analysis
Huizhou Shunyi stands out for high-volume export capacity (US $130,000+ online revenue) and full customization capabilities, making it ideal for branded or private-label projects. Despite a higher reorder rate (36%), its 100% on-time delivery and sub-one-hour response time indicate robust operational execution. Shenzhen Tuodi offers competitive pricing (as low as $2.01/unit) and fast sampling with no minimum order restrictions, suitable for startups and small-batch testing. Foshan Innova demonstrates balanced performance with reliable delivery (96%) and moderate reorder frequency, indicating stable product satisfaction. In contrast, Shenzhen Rizhengda’s low on-time delivery rate (66%) presents a fulfillment risk despite broad product variety and single-piece sampling availability.
FAQs
How to verify sensor light switch supplier reliability?
Cross-check declared certifications (CE, RoHS) with product documentation. Request evidence of functional testing, such as detection range accuracy and power consumption metrics. Analyze response consistency and technical depth in communications. High online revenue combined with 100% on-time delivery provides a strong indicator of scalability and process discipline.
What is the typical sampling timeline?
Standard samples ship within 5–7 days after order confirmation. Customized units requiring new molds or firmware adjustments take 10–15 days. Air freight adds 3–7 days for international delivery.
Can suppliers accommodate private labeling and packaging changes?
Yes, select manufacturers like Huizhou Shunyi Technology offer full customization, including logo printing, color variants, user manuals, and retail packaging. Minimum volumes may apply depending on complexity. Confirm tooling costs and setup fees prior to approval.
Do suppliers provide free samples?
Free samples are uncommon; most suppliers charge a nominal fee refundable against future bulk orders. Sample costs typically range from $1.20 to $11.80 per unit, reflecting component and programming complexity.
What are standard lead times for bulk orders?
Lead times average 15–25 days for quantities between 1,000 and 10,000 units. Larger batches may extend to 30–40 days, especially for customized configurations. Confirm production scheduling and shipping options during negotiation to align with inventory planning.









