Shaved Ice Block Maker
About shaved ice block maker
Where to Find Shaved Ice Block Maker Suppliers?
China is the dominant manufacturing hub for shaved ice block makers, with key supplier clusters concentrated in Guangdong, Henan, and Shandong provinces. These regions host vertically integrated production ecosystems that combine refrigeration engineering, metal fabrication, and food-grade equipment design. Guangdong-based suppliers leverage proximity to Hong Kong’s logistics network for rapid export processing, while Henan and Shandong benefit from established heavy machinery supply chains, enabling cost-efficient compressor integration and stainless steel machining.
The industrial clusters support scalable production through localized access to core components—compressors, evaporators, and food-safe motors—reducing lead times by 20–30% compared to fragmented supply models. Facilities typically operate under ISO 9001-aligned quality systems, with many offering CE compliance for international market access. Buyers can expect standard lead times of 25–40 days for containerized orders, with MOQs ranging from 1 to 10 sets depending on automation level and output capacity. The region's mature cold chain equipment sector also enables hybrid designs, such as combined ice block freezing and shaving units.
How to Choose Shaved Ice Block Maker Suppliers?
Procurement decisions should be guided by technical validation, production transparency, and transactional reliability:
Technical & Safety Compliance
Verify adherence to electrical safety standards (CE, CB Scheme) and food contact material regulations (FDA-compliant surfaces). For commercial deployments, confirm motor IP ratings (minimum IPX4 for moisture resistance) and compressor type (hermetic or semi-hermetic for durability). Request test reports for continuous operation cycles (72+ hours) and temperature stability (−15°C to −30°C operating range).
Production Capability Assessment
Evaluate supplier infrastructure using these benchmarks:
- Minimum 1,000m² dedicated manufacturing area for consistent batch output
- In-house assembly lines with welding, CNC cutting, and powder coating capabilities
- Stainless steel (SUS304 preferred) construction for hygiene and corrosion resistance
Cross-reference delivery performance (target ≥98%) with response time (≤2 hours ideal) to assess operational responsiveness.
Transaction & Quality Assurance
Utilize secure payment mechanisms such as escrow services, especially for first-time transactions. Prioritize suppliers with documented quality control checkpoints—leak testing, pressure validation, and final product ice consistency checks. Request pre-shipment inspection rights or third-party audit access (e.g., SGS, TÜV) to verify build quality. Sample testing is recommended to evaluate shaving fineness, noise levels (≤75 dB), and energy efficiency (kW/h per 100kg ice).
What Are the Best Shaved Ice Block Maker Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Product Range | Min. Order |
|---|---|---|---|---|---|---|---|---|
| Guangzhou Kengming Trading Co., Ltd. | Guangdong, CN | US $40,000+ | 100% | ≤2h | <15% | Color, logo, capacity, compressor | 5 models ($246–$1,133) | 1 set |
| Zhengzhou Taizy Trading Co., Ltd. | Henan, CN | US $20,000+ | 100% | ≤3h | 20% | Color, size, logo, packaging | 5 models ($1,900–$2,500) | 1 set |
| Shandong Qianrui Machinery Technology Co., Ltd. | Shandong, CN | US $9,000+ | 100% | ≤1h | <15% | Material, labeling, graphics | 5 models ($2,000–$7,600) | 1 set |
| Zhecheng Hong Xin Machinery Factory | Henan, CN | US $620,000+ | 100% | ≤2h | <15% | Color, material, logo, packaging | 5 models ($155–$1,200) | 1 set/piece |
| Henan Huanor Import And Export Trade Co., Ltd. | Henan, CN | US $120,000+ | 98% | ≤1h | 15% | Output, color, plug, graphics | 5 models ($228–$723) | 1 set/piece |
Performance Analysis
Zhecheng Hong Xin Machinery Factory demonstrates the highest export volume (US $620,000+), indicating strong market penetration and production scalability. Shandong Qianrui and Henan Huanor lead in responsiveness (≤1h), a critical factor for post-purchase technical coordination. Guangzhou Kengming offers the widest price range, including entry-level models at $246, suitable for small vendors. Zhengzhou Taizy targets high-capacity industrial users with uniform pricing across large-scale machines ($1,900–$2,500). All top-tier suppliers provide customization for branding and voltage compatibility (110V/220V), with several supporting OEM labeling and graphic integration. Buyers seeking compact, restaurant-grade units may prioritize lower-cost options, while industrial operators should focus on compressors and daily output ratings (up to 3 tons).
FAQs
How to verify shaved ice block maker supplier reliability?
Validate certifications through official registries and request factory audit reports. Analyze customer feedback focusing on after-sales service, spare parts availability, and compressor longevity. Confirm whether the supplier conducts in-line quality inspections and pressure tests on refrigerant circuits.
What is the typical sampling timeline?
Standard sample production takes 10–20 days, depending on customization. Shipping via express courier adds 5–7 days internationally. Complex configurations with dual-voltage systems or custom molds may require up to 30 days.
Can suppliers ship shaved ice block makers worldwide?
Yes, most suppliers offer FOB, CIF, and DAP shipping terms. Confirm compliance with destination electrical codes and customs documentation requirements. Sea freight is optimal for bulk orders due to machine weight (200–800 kg per unit).
Do manufacturers provide free samples?
Free samples are rare for industrial equipment. Most suppliers charge full or partial sample fees, which may be credited toward bulk orders (typically 5+ units). Negotiate sample costs during initial procurement discussions.
How to initiate customization requests?
Submit detailed specifications: required ice output (kg/24h), voltage/frequency (e.g., 110V/60Hz), physical dimensions, and branding elements. Reputable suppliers will provide technical drawings and component lists within 48–72 hours for approval prior to production.









