Small Scale Exercise Book Making Machine
CN
CN
About small scale exercise book making machine
Where to Find Small Scale Exercise Book Making Machine Suppliers?
China remains the central hub for small scale exercise book making machine manufacturing, with key production clusters in Henan and Zhejiang provinces. These regions host vertically integrated supply chains specializing in paper processing and post-press equipment, enabling cost-efficient production and rapid scalability. Henan, particularly around Zhengzhou, is home to multiple engineering-focused manufacturers offering fully automated and semi-automated bookmaking lines. Zhejiang’s Hangzhou-Fuyang corridor specializes in compact, office-grade binding and finishing machinery tailored for small-volume producers.
The industrial ecosystem supports both high-capacity production and customization, with suppliers often operating end-to-end facilities that include CNC machining, assembly, and testing units within 5,000–20,000m² factories. This integration reduces component lead times and ensures tighter quality control. Buyers benefit from localized access to raw materials such as steel frames, pneumatic systems, and glue application modules, which contribute to a 15–25% cost advantage over equivalent machinery produced outside Asia. Standard lead times range from 20 to 40 days, depending on automation level and order complexity.
How to Choose Small Scale Exercise Book Making Machine Suppliers?
Selecting a reliable supplier requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Capability Verification
Confirm the supplier's ability to deliver machines matching required specifications: book size (A4, A5), binding type (glue, spiral, saddle-stitch), and output capacity (units per hour). For automated systems, verify integration of feeding, folding, gluing, and trimming functions. Request performance data sheets and video demonstrations of live machine operation.
Production Infrastructure Assessment
Evaluate critical indicators of manufacturing maturity:
- Factory area exceeding 3,000m² to support stable output
- In-house R&D or engineering teams capable of customization
- Integrated CNC, welding, and assembly capabilities
Cross-reference facility size with on-time delivery rates—suppliers maintaining ≥98% fulfillment are more likely to meet deadlines under volume pressure.
Quality and Compliance Standards
Prioritize suppliers adhering to international quality frameworks. While ISO 9001 certification is not universally listed, its presence indicates structured quality management. For export markets, CE marking is essential for compliance with EU safety directives. Request documentation on material sourcing, electrical system standards, and machine safety interlocks.
Transaction Reliability Indicators
Use response time, reorder rate, and verified revenue as proxies for service reliability. Suppliers responding within ≤3 hours and maintaining >98% on-time delivery demonstrate operational discipline. Where available, examine customization logs to assess flexibility in design, voltage configuration, and language interface options.
What Are the Best Small Scale Exercise Book Making Machine Suppliers?
| Company Name | Location | Main Products | On-Time Delivery | Response Time | Reorder Rate | Online Revenue | Customization | Min. Order Value |
|---|---|---|---|---|---|---|---|---|
| Qinyang Guorui Papermaking Machinery Co., Ltd. | Henan, CN | Paper Processing Machinery, Paper Product Making Lines | 100% | ≤3h | - | - | No data | $34,333/set |
| Hangzhou Fuyang Sigo Office Supplies Co., Ltd. | Zhejiang, CN | Binding Machines, Laminators, Post-Press Equipment | 98% | ≤2h | 15% | US $1,600,000+ | Yes | $50/piece |
| Qinyang Shengfeng Paper Making Machinery Co., Ltd. | Henan, CN | Notebook Manufacturing Machines, Tissue Paper Lines | 100% | ≤10h | <15% | US $700+ | Yes | $10,000/set |
| Zhengzhou Perfect Co., Ltd. | Henan, CN | Automatic Note Book Production Lines, High-Speed Binders | 100% | ≤3h | <15% | US $80,000+ | Yes | $5,500/set |
| Zhengzhou Miles Tech Company Ltd. | Henan, CN | Hard-Cover Book Machines, Semi-Automatic Sewing Systems | 92% | ≤3h | <15% | US $1,000,000+ | Yes | $1,300/set |
Performance Analysis
Qinyang Guorui and Zhengzhou Perfect demonstrate strong logistical reliability with 100% on-time delivery, ideal for time-sensitive procurement. Hangzhou Fuyang Sigo stands out for low MOQs ($50/unit) and high reorder activity, indicating market acceptance of its compact desktop models. Zhengzhou Miles Tech offers the widest range of modular solutions, including spiral binding and hard-cover casing machines, though its 92% delivery rate warrants closer shipment monitoring. Custom manufacturers like Zhengzhou Perfect and Qinyang Shengfeng provide design flexibility for voltage, automation level, and material compatibility, critical for integration into existing production environments.
FAQs
What is the typical MOQ for small scale exercise book making machines?
MOQs vary significantly by machine type. Fully automated lines require 1 set (unit price $35,000+), while desktop or manual units may be ordered individually (as low as $50). Suppliers like Hangzhou Fuyang Sigo allow single-piece trials, reducing entry barriers for startups.
How long does it take to fulfill an order?
Standard delivery windows range from 20 to 45 days after deposit confirmation. Complex automated systems may require up to 60 days if custom tooling or control panels are specified. Expedited builds are occasionally available at premium cost.
Can these machines handle different paper sizes and weights?
Yes, most mid-range to high-end models support adjustable rollers and programmable settings for A4, A5, and custom formats. Paper weight ranges typically span 60–150 gsm. Confirm compatibility with coated or recycled stock during technical validation.
Do suppliers offer installation or training support?
Some suppliers include remote setup guidance via video. On-site commissioning and operator training are typically billable services. Clarify these terms before purchase, especially for automated systems requiring calibration.
Are spare parts and after-sales service available?
Leading suppliers maintain inventories of wear components (glue nozzles, cutting blades, drive belts). Warranty periods range from 6 months to 1 year. For long-term maintenance, establish a spare parts inventory based on supplier recommendations.









