Stand Up Ice Maker
CN
About stand up ice maker
Where to Find Stand Up Ice Maker Suppliers?
China remains the dominant hub for stand-up ice maker manufacturing, with key production clusters in Anhui, Shandong, and Shanghai. These regions host vertically integrated facilities specializing in commercial refrigeration equipment, enabling cost-efficient production and rapid scalability. Anhui and Shandong are particularly notable for their stainless steel fabrication capabilities and proximity to raw material suppliers, reducing component lead times by up to 25% compared to offshore alternatives.
Suppliers in these industrial zones operate advanced production lines equipped for automated assembly, precision welding, and air-cooled condenser integration—critical for high-capacity freestanding units. The ecosystem supports both standard and customized models, with many manufacturers offering end-to-end design, prototyping, and testing under one roof. Buyers benefit from localized supply chains that maintain 20–30% lower production costs while supporting MOQs as low as 1 unit for select models.
How to Choose Stand Up Ice Maker Suppliers?
Selecting a reliable supplier requires due diligence across technical, operational, and transactional dimensions:
Technical Compliance & Design Capability
Verify adherence to international standards such as CE, RoHS, and ISO 9001 where applicable. For commercial-grade units, confirm compressor brand (e.g., Embraco, Secop), coolant type (R134a, R404A), and cooling method (air/water-cooled). Evaluate customization options including output capacity (50kg–400kg/24h), operating language interface, self-cleaning functions, and compliance with ambient temperature ranges (up to 43°C).
Production Capacity & Quality Assurance
Assess supplier infrastructure based on the following indicators:
- Minimum factory area supporting batch production (verified through facility videos or audits)
- In-house engineering teams capable of modifying size, shape, plug type, and labeling per regional requirements
- On-time delivery rate exceeding 97% and reorder rates above 20% indicating customer satisfaction
- Response time under 2 hours for technical inquiries and configuration support
Cross-reference performance metrics such as online revenue (e.g., >US $270,000 annually) as an indicator of market presence and order volume stability.
Transaction Security & Sampling Protocols
Utilize secure payment methods with escrow protection until product inspection is completed. Prioritize suppliers offering sample units for performance validation—typical sampling lead time ranges from 7–15 days depending on customization level. Inspect materials (stainless steel grade 304 preferred), build quality, noise levels, and energy efficiency before placing bulk orders.
What Are the Best Stand Up Ice Maker Suppliers?
| Company Name | Location | Verified Manufacturer | Online Revenue | On-Time Delivery | Reorder Rate | Avg. Response | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Anhui Liangzhi Energy Saving Technology Co., Ltd. | Anhui, CN | Yes | US $360,000+ | 98% | 21% | ≤1h | 1 set | $489–1,540 |
| Tianbuer Import and Export (Shandong) Co., LTD. | Shandong, CN | No | US $20,000+ | 84% | 23% | ≤2h | 1 piece | $229–1,945 |
| Zhongji (Shandong) Metal Products Co., Ltd. | Shandong, CN | Yes | US $270,000+ | 99% | <15% | ≤2h | 3 units | $179–584 |
| Cangzhou Hongfa Packing Technology Research Institute | Hebei, CN | No | US $10,000+ | 100% | <15% | ≤9h | 1 set | $2,000–15,000 |
| Shanghai Chuangli Refrigeration Equipment Co., Ltd. | Shanghai, CN | Yes | US $15,000,000+ | 100% | 40% | ≤5h | 5 sets | $380–3,140 |
Performance Analysis
Shanghai Chuangli stands out with the highest reorder rate (40%) and substantial annual revenue, indicating strong customer retention and global market penetration. Despite a longer average response time, its full customization capabilities and scalable production make it ideal for large-volume buyers. Anhui Liangzhi combines fast response times (≤1h) with robust delivery performance (98%) and offers mid-range pricing suitable for diversified commercial deployments.
Zhongji (Shandong) delivers competitive pricing starting at $179 with near-perfect on-time fulfillment (99%), though minimum order thresholds begin at 3 units. Tianbuer provides entry-level pricing and single-unit availability but exhibits lower on-time delivery (84%), suggesting potential logistical constraints. Cangzhou Hongfa, while recording perfect delivery performance, operates outside core refrigeration manufacturing and lists significantly higher-priced systems likely intended for specialized packaging applications rather than direct ice production.
FAQs
How to verify stand up ice maker supplier reliability?
Validate certifications (CE, ISO 9001) through issuing bodies and request test reports for compressor performance, insulation integrity, and electrical safety. Analyze transaction history, focusing on consistent on-time delivery (>97%), repeat business rates, and responsiveness. Conduct virtual factory audits to confirm in-house production versus trading operations.
What is the typical lead time for samples and bulk orders?
Sample units ship within 7–15 days after confirmation of specifications. Bulk production lead time averages 30–45 days for orders of 50+ units, depending on customization complexity and shipping method. Air freight allows delivery within 5–7 days; sea freight takes 20–35 days based on destination port.
Can suppliers customize stand up ice makers?
Yes, most verified manufacturers offer extensive customization: color, logo printing, language display, plug type (EU/US/AU), cabinet dimensions, and cooling system configuration. Output capacities can be tailored from 50kg to over 300kg per 24 hours. Confirm availability of specific components such as digital controls, self-cleaning cycles, and dual-compressor setups prior to order placement.
Do suppliers offer after-sales support and spare parts?
Leading suppliers provide technical documentation, troubleshooting guides, and access to replacement parts such as evaporator trays, water pumps, and control boards. Some include free spare kits with initial shipments. Ensure warranty terms (typically 1 year) cover compressor and refrigeration system failures, and clarify responsibilities for repairs or replacements.
What are common payment and shipping terms?
Standard payment methods include T/T (30% deposit, 70% before shipment) and platform-secured transactions. FOB terms are widely used; CIF arrangements are available upon request. Shipping options range from express courier (for samples) to LCL or FCL container loads for bulk consignments. Confirm packaging standards (wooden crate vs. carton) and export compliance documentation (commercial invoice, packing list, bill of lading).









