Step By Step Laying Artificial Grass
About step by step laying artificial grass
Where to Find Suppliers for Step by Step Laying Artificial Grass?
China remains the central hub for artificial grass manufacturing, with key production clusters in Shandong, Hebei, and Zhejiang provinces. These regions host vertically integrated facilities specializing in synthetic turf extrusion, tufting, UV stabilization, and backing lamination—critical processes for durable installation-ready products. Shandong accounts for over 40% of national output, supported by proximity to polymer raw material suppliers and ports like Qingdao, enabling efficient export logistics. Hebei's Xingtai and Shijiazhuang zones focus on cost-competitive residential and landscaping-grade turf, while Zhejiang excels in high-end custom solutions including interlocking tiles and putting greens.
The industrial ecosystem supports rapid scalability, with many suppliers operating automated tufting lines capable of producing 50,000–200,000 square meters monthly. Integrated supply chains reduce component lead times, allowing fulfillment of standard orders within 20–35 days. Buyers benefit from competitive pricing due to economies of scale, localized PP/PE fiber sourcing, and streamlined customs processing. Most factories support roll widths from 2m to 4m and pile heights between 10mm and 60mm, accommodating diverse laying requirements across residential, commercial, and sports applications.
How to Choose Suppliers for Step by Step Laying Artificial Grass?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional criteria:
Material & Performance Specifications
Confirm use of UV-stabilized polyethylene (PE) or polypropylene (PP) fibers to ensure colorfastness and durability under prolonged sunlight exposure. Request accelerated weathering test reports (e.g., QUV testing per ASTM G154) validating minimum 5-year outdoor performance. For outdoor installations, verify sand-infill compatibility and drainage-backed substrates to prevent water pooling.
Production Capacity Verification
Assess infrastructure maturity through objective metrics:
- Minimum 3,000m² factory area for consistent volume output
- In-house tufting and coating capabilities to control quality variance
- Monthly production capacity exceeding 100,000 sqm for large-scale projects
Cross-reference delivery performance data; prioritize suppliers with ≥95% on-time shipment rates and response times under 3 hours.
Customization and Compliance
Evaluate flexibility in color, pile height, roll size, logo imprinting, and packaging. Ensure compliance with international standards such as REACH (EU), RoHS, and California Proposition 65 for chemical safety. For commercial or public space installations, request fire resistance certification (e.g., DIN 4102 B1 or NFPA 253).
Procurement Safeguards
Utilize secure payment terms with milestone-based disbursements. Prioritize suppliers offering sample validation before bulk production. Conduct virtual audits via live video tours to verify facility conditions, inventory levels, and quality control checkpoints. Retain third-party inspection rights prior to shipment, especially for container-load orders.
What Are the Leading Suppliers for Step by Step Laying Artificial Grass?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Min. Order Flexibility |
|---|---|---|---|---|---|---|---|
| Shandong Demax Group | Shandong, CN | US $2,600,000+ | 96% | ≤3h | <15% | Color, size, logo, packaging | 1,000 sq ft / 1,000 sq m |
| Yiwu Lishi Imp & Exp Co., Ltd. | Zhejiang, CN | US $130,000+ | 98% | ≤2h | <15% | Color, material, size, logo, label | 50 pieces |
| Hebei Sensairunsi Import & Export Trading Co., Ltd | Hebei, CN | US $420,000+ | 98% | ≤2h | <15% | Color, material, size, logo, packaging | 1–50 sq m |
| Zhejiang Shendu Import And Export Co., Ltd. | Zhejiang, CN | US $270,000+ | 66% | ≤2h | 20% | Limited (product-specific) | 500 rolls / 500 sq m |
| Shandong Asia Europe Evergreen International Trade Co., Ltd. | Shandong, CN | US $60,000+ | 91% | ≤1h | <15% | Size, packaging | 10 sq m |
Performance Analysis
Shandong Demax Group leads in volume capability and revenue scale, supporting large-area contracts with competitive pricing starting below $0.30/sq ft. Yiwu Lishi and Hebei Sensairunsi offer strong customization breadth with high delivery reliability (98%), making them suitable for branded or niche-market projects. Zhejiang Shendu presents higher risk due to a 66% on-time delivery rate despite extensive product listings, suggesting potential fulfillment bottlenecks. Shandong Asia Europe Evergreen provides the fastest average response time (≤1h), advantageous for time-sensitive procurement cycles. Buyers should prioritize partners with sub-3-hour response windows and reorder rates below 15%, indicating stable customer satisfaction and low defect incidence.
FAQs
What is the typical MOQ for artificial grass suppliers?
MOQs vary significantly: bulk orders often require 1,000–500,000 sq ft/m, while sample or trial runs may be fulfilled at 1–50 sq m. Some suppliers allow mixed-product containers to meet minimum thresholds flexibly.
How long does production and shipping take?
Manufacturing lead time averages 20–30 days for standard orders. Air freight delivers samples in 5–10 days; sea freight takes 25–40 days depending on destination port. Expedited production (10–15 days) is available from select suppliers at +15–25% cost premium.
Do suppliers support OEM branding?
Yes, most leading suppliers offer full OEM services including custom labeling, packaging design, logo embossing, and private-labeled rolls. Minimum branding quantities typically start at 5,000 sq m.
Can I request product samples before ordering?
Sample availability is standard. Many suppliers provide free samples (10cm x 10cm to 1 sq m) with freight collect. Full-roll trials are chargeable but may be credited toward subsequent orders.
What are common payment terms for international buyers?
Standard terms include 30% T/T deposit with balance before shipment, or 100% LC at sight. Established buyers may negotiate 30–60 day credit terms after order history verification. Escrow and trade assurance options enhance transaction security.









