Supplier Power Examples
About supplier power examples
Where to Find Power Supply Suppliers?
China remains the global epicenter for power supply manufacturing, with Shenzhen and Zhongshan in Guangdong Province emerging as key industrial hubs. These regions host vertically integrated production ecosystems specializing in switching power supplies, AC/DC adapters, and PC power units. Shenzhen’s advanced electronics infrastructure supports rapid prototyping and high-volume output, while Zhongshan focuses on cost-efficient production of standardized components.
The concentration of component suppliers, assembly facilities, and logistics networks within 50km radii enables streamlined operations. This localization reduces lead times to 15–30 days for standard orders and lowers production costs by 20–35% compared to non-Asian manufacturers. Buyers benefit from scalable solutions—ranging from low-power adapters (5W–50W) to high-efficiency modular PSUs (up to 1000W)—with access to OEM/ODM services and compliance-ready designs.
How to Choose Power Supply Suppliers?
Effective supplier selection requires a structured evaluation across technical, operational, and transactional dimensions:
Quality & Compliance Verification
Confirm adherence to international standards such as CE, RoHS, and FCC. For regulated markets, ensure product listings include 80 Plus certification (Bronze, Gold, or higher) where applicable. Request test reports for electrical safety, thermal performance, and electromagnetic compatibility (EMC). ISO 9001 certification is recommended for consistent quality management.
Production & Customization Capability
Assess core competencies through the following indicators:
- Minimum facility size of 2,000m² for sustained volume output
- In-house design and engineering teams supporting custom voltage, connector types, cable lengths, and RGB lighting integration
- Capacity for label, packaging, and branding customization (logo, color, material)
- Availability of SFX, ATX, and Flex 1U form factors for PC power units
Cross-reference online revenue data and reorder rates to validate market acceptance and production stability.
Transaction Reliability Metrics
Prioritize suppliers demonstrating:
- On-time delivery rate ≥99%
- Average response time ≤2 hours
- Reorder rate below 25% (indicating customer satisfaction and product reliability)
- Use of secure payment frameworks and willingness to support sample validation prior to bulk orders
What Are the Best Power Supply Suppliers?
| Company Name | Main Products | Customization Options | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Verified Supplier Type |
|---|---|---|---|---|---|---|---|
| Shenzhen Wanshunze Technology Co., Ltd. | Power Adapters, Switching Power Supply | Color, material, size, logo, packaging, label, graphic | US $2,000+ | 100% | ≤1h | <15% | Custom Manufacturer |
| Shenzhen Tianfeng International Technology Co., Ltd. | PC Power Supplies (600W–1000W), Modular Units | Color, SFX size, logo, cable length, packaging, plug, label, RGB, memory fans | US $180,000+ | 99% | ≤2h | <15% | Multispecialty Supplier |
| Zhongshan Longji Technology Co., Ltd. | Switching Power Supply, Other Power Supplies | Limited customization (product-specific) | US $200,000+ | 100% | ≤1h | 16% | Not specified |
| Shantou Jinshiyuan Electric Appliance Co., Ltd. | Power Adapters, LED Modules, Smart Strip Lights | Multiple voltage outputs (5V–24V), compact designs | US $50,000+ | 100% | ≤1h | 24% | Not specified |
| Shenzhen Inloom Technology Co., Ltd. | PC Power Supplies, Switching Power Supply, LED Drivers | Standard configurations with bulk-order flexibility | US $6,000+ | 100% | ≤1h | <15% | Not specified |
Performance Analysis
Shenzhen-based suppliers dominate responsiveness and customization depth, with Shenzhen Tianfeng offering comprehensive ODM support for high-wattage PC power units. Zhongshan Longji stands out with the highest reported online revenue (US $200,000+), indicating strong market penetration, though its reorder rate (16%) suggests room for improvement in post-sale retention. Shenzhen Wanshunze and Shenzhen Inloom maintain optimal reorder rates below 15%, reflecting reliable product quality and fulfillment consistency. All top-tier suppliers achieve 100% on-time delivery except Tianfeng (99%), with average response times under two hours—critical for time-sensitive procurement cycles.
FAQs
How to verify power supply supplier reliability?
Cross-check certifications (CE, RoHS, 80 Plus) against product documentation. Request factory audit reports or video tours to confirm in-house production capabilities. Analyze transaction history metrics such as on-time delivery, response speed, and reorder behavior to assess operational stability.
What is the typical MOQ and pricing range?
MOQ varies by supplier and model: basic adapters start at 10–20 pieces ($0.48–$0.65/unit), while higher-wattage PSUs may require 50–1000 pieces. Bulk pricing for 500+ units can reduce costs by 15–30%. Sample orders are typically accepted at 1–5 pieces for evaluation.
Can suppliers provide customized power solutions?
Yes, leading manufacturers support full customization including output voltage, connector type, cable length, labeling, and RGB lighting. Design revisions and prototypes are typically delivered within 7–14 days upon submission of technical specifications.
Do suppliers offer global shipping and export compliance?
All listed suppliers have international transaction experience. Confirm FOB terms, packaging standards, and compliance with destination regulations (e.g., UL listing for North America). Most support air and sea freight options with standard lead times of 7–15 days for air and 25–40 days for ocean shipping.
How long does sampling take?
Standard sample production takes 5–10 days. Custom configurations may require up to 15 days depending on complexity. Air shipping adds 5–7 days for most international destinations.









