Tecre Button Maker Machine
About tecre button maker machine
Where to Find Tecre Button Maker Machine Suppliers?
China serves as the global hub for button maker machine manufacturing, with key production clusters concentrated in Zhejiang and Guangdong provinces. These regions host vertically integrated supply chains that support rapid prototyping and scalable production of pressing, covering, and badge-making equipment. Taizhou in Zhejiang is recognized for its specialization in precision mechanical assemblies, particularly manual and semi-automatic button machines, while Foshan and Dongguan in Guangdong focus on automated systems and industrial-grade machinery for large-scale garment accessory production.
The regional ecosystems enable cost efficiencies through localized component sourcing—steel dies, pneumatic actuators, and mold tooling are produced within 50km of final assembly plants. This integration reduces lead times by up to 30% compared to offshore alternatives and supports flexible order fulfillment. Buyers benefit from a mature industrial base where suppliers offer both standard models and OEM-configured machines, with typical delivery windows ranging from 15–30 days depending on customization level and order volume.
How to Choose Tecre Button Maker Machine Suppliers?
Selecting reliable partners requires structured evaluation across technical, operational, and transactional dimensions:
Technical Capability Verification
Confirm machine specifications align with intended application—manual lever presses suit small-batch craft operations, while pneumatic or electric hydraulic models (e.g., 5,600W high-output units) serve industrial environments. Demand detailed schematics for force output (measured in kN), die compatibility (round, square, rectangular formats), and material thickness capacity (fabric, plastic, metal covers). For export compliance, verify CE or equivalent safety certifications where applicable.
Production Infrastructure Assessment
Evaluate supplier capabilities based on facility scale and product range:
- Suppliers with >500 active listings in button-making equipment indicate established production lines
- In-house tooling and die fabrication enhance customization agility
- Dedicated R&D teams support non-standard configurations (e.g., multi-station rotary presses)
- Cross-reference response time (<4 hours preferred) and on-time delivery rate (>95%) as indicators of operational maturity
Procurement Risk Mitigation
Utilize secure payment mechanisms such as escrow services to ensure quality validation prior to full disbursement. Request sample units to assess build quality, press consistency, and ease of die replacement. Prioritize suppliers offering multilingual technical documentation and post-sale service support, especially for electrical components subject to regional voltage variations.
What Are the Best Tecre Button Maker Machine Suppliers?
| Company Name | Location | Main Products (Listings) | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Notable Offerings |
|---|---|---|---|---|---|---|---|
| Taizhou My Button Machine Co., Limited. | Zhejiang, CN | Button Making Machines (125) | US $40,000+ | 78% | ≤10h | <15% | Entry-level round and square badge machines ($65–$468); compact designs for retail and promotional use |
| Taizhou Woxing Machinery Co., Ltd. | Zhejiang, CN | Sewing Machines (600) | US $130,000+ | 100% | ≤8h | 20% | Britex-branded industrial button setters (BR-1377D, BR-1903 SQ); higher price point ($240–$2,650); integration with apparel production workflows |
| Foshan Zeming Hardware Technology Co., Ltd. | Guangdong, CN | Buttons (400) | US $20,000+ | 100% | ≤3h | 28% | Broad range from hand-press units ($96) to fully automatic fabric-covered button systems ($5,600); strong aftermarket presence |
| Dongguan Jinyu Automation Equipment Co., Ltd. | Guangdong, CN | Rubber Product Making Machinery (628) | US $20,000+ | 90% | ≤2h | 66% | High-capacity automated systems ($3,500–$5,800); suitable for integrated accessory lines including fridge magnets and shoe charms |
| Yancheng Stik Pro Machinery Equipment Co., Ltd. | Jiangsu, CN | Button Making Machines (944) | US $130,000+ | 100% | ≤3h | 17% | Largest product catalog; competitive pricing ($60–$620); specializes in manual and rotation-based machines for diverse button sizes (50mm–80mm) |
Performance Analysis
Yancheng Stik Pro and Taizhou Woxing demonstrate robust transactional reliability with 100% on-time delivery and strong online revenue performance, indicating scalable operations. Foshan Zeming stands out for responsiveness (≤3h) and customer retention (28% reorder rate), suggesting effective after-sales engagement. Dongguan Jinyu’s 66% reorder rate reflects niche dominance in automation solutions despite fewer direct button machine listings. While Taizhou My Button Machine has lower delivery reliability (78%), it offers entry-tier models ideal for startups or low-volume users. Buyers seeking industrial throughput should prioritize suppliers with documented automation experience and verified facility audits.
FAQs
What is the typical MOQ for tecre button maker machines?
Minimum Order Quantities vary: individual units are available (MOQ 1 set/piece), though bulk orders (10+ units) unlock optimized pricing. Some suppliers require full carton or container loads for custom configurations.
How long does production and shipping take?
Standard machine lead time ranges from 15–25 days post-payment. Air freight delivers samples in 7–10 days; sea freight for full orders takes 25–35 days depending on destination port and customs processing.
Can suppliers customize button machine specifications?
Yes, most manufacturers support modifications including die size (50mm–80mm), power source (manual, pneumatic, electric), and frame configuration (single/dual station). Provide technical drawings or functional requirements for quotation.
Are spare parts and tooling included?
Basic kits typically include one set of dies and pressing pins. Additional tooling (e.g., square, rectangular, novelty shapes) is sold separately. Confirm availability of wear-prone components like rubber pads and alignment guides before purchase.
Do suppliers offer machine warranties?
Warranty terms vary from 6 months to 1 year on structural and mechanical components. Electrical systems may carry shorter coverage periods. Warranty validity often requires adherence to operating guidelines and preventive maintenance logs.









