Transfer Switch For Generator
About transfer switch for generator
Where to Find Transfer Switch for Generator Suppliers?
China remains the central hub for transfer switch manufacturing, with key production clusters concentrated in Zhejiang and Guangdong provinces. Yueqing City in Zhejiang hosts over 70% of China’s low-voltage electrical equipment suppliers, including automatic transfer switches (ATS), leveraging mature supply chains for circuit breakers, contactors, and control panels. This region benefits from vertically integrated production—encompassing die-casting, coil winding, and final assembly—reducing component procurement lead times by 25–40% compared to offshore alternatives.
The industrial ecosystem supports rapid prototyping and scalable output, with many facilities capable of monthly production volumes exceeding 10,000 units. Proximity to Shanghai and Ningbo ports enables efficient global distribution, with standard sea freight transit times of 18–25 days to North America and Europe. Buyers gain access to a dense network of certified component suppliers, testing laboratories, and logistics providers within a 30km radius, ensuring shorter fulfillment cycles (typically 15–30 days for bulk orders) and cost advantages of 20–35% versus Western or Southeast Asian manufacturers.
How to Choose Transfer Switch for Generator Suppliers?
Selecting reliable suppliers requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Compliance & Certifications
Verify adherence to international standards such as IEC 60947-6-1 for automatic transfer switching equipment. CE, CCC, and RoHS markings are essential for market access in regulated regions. Request test reports for dielectric strength, temperature rise, and mechanical endurance (minimum 10,000 operations for ATS units). For critical applications, confirm compliance with UL 1008 (North American ATS standard).
Production and Engineering Capability
Assess supplier infrastructure using these benchmarks:
- Minimum factory area of 2,000m² for stable volume output
- In-house design capability for customization (e.g., voltage range, control logic, enclosure material)
- Integrated quality control systems with automated testing stations
Cross-reference on-time delivery performance (>95% recommended) and response time (<3 hours) as indicators of operational efficiency.
Customization and Transaction Security
Confirm availability of OEM/ODM services including label, logo, packaging, and cable length modifications. Prioritize suppliers offering third-party inspection arrangements and secure payment terms. Sample validation is critical—test switching speed, contact resistance, and overload protection functionality before scaling procurement.
What Are the Best Transfer Switch for Generator Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Response Time | Reorder Rate | Customization Options | Product Range |
|---|---|---|---|---|---|---|---|
| Orient Tech Limited | Power Distribution Equipment, LV Products, Cooling Systems | US $470,000+ | 90% | ≤3h | 29% | Yes (color, cable type, labeling, monitoring, size, logo) | 15+ models |
| Abel Energy Sourcing Company | Automatic Transfer Switches, Stainless Steel Enclosures | US $150,000+ | 100% | ≤3h | 29% | Yes (material, color, size, logo, packaging) | 5 models |
| Yueqing Feeo Electric Co., Ltd. | ATS, MCBs, Surge Protection, Solar Switches | US $620,000+ | 100% | ≤3h | <15% | Limited (standard configurations) | 5 models |
| Yueqing Woerjia Electric Co., Ltd. | ATS, Voltage Regulators, Moulded Case Breakers | US $40,000+ | 100% | ≤2h | 63% | No explicit mention | 5 models |
| Wenzhou Chen Intelligent Technology Co., Ltd. | Intelligent ATS, Dual-Power Uninterruptible Switches | US $30,000+ | 100% | ≤1h | <15% | Limited (handle color, display options) | 5 models |
Performance Analysis
Yueqing Feeo Electric leads in revenue generation and product diversity, offering robust ATS solutions across 63A–125A ranges with competitive pricing starting at $18/unit. Abel Energy distinguishes itself with stainless steel enclosures and UL-compliant designs suitable for harsh environments. Yueqing Woerjia exhibits the highest reorder rate (63%), indicating strong customer satisfaction despite lower online visibility. Wenzhou Chen stands out for fastest response time (≤1h) and specialized uninterruptible switching technology. While Orient Tech offers the broadest customization scope, its 90% on-time delivery rate warrants closer scrutiny for time-sensitive contracts. Buyers seeking high-volume reliability should prioritize suppliers with 100% on-time delivery and in-house testing capabilities.
FAQs
How to verify transfer switch supplier credibility?
Cross-check certifications (CE, CCC, UL) with official databases. Request factory audit reports or video tours to validate production lines. Analyze transaction metrics such as on-time delivery rate, response speed, and reorder frequency as proxies for operational stability.
What is the typical MOQ and lead time?
Standard MOQ ranges from 5 to 100 units depending on model complexity. Lead times average 15–25 days post-deposit, with express production available for sample orders (7–10 days). Bulk shipments via sea freight add 20–30 days for international delivery.
Can suppliers provide customized transfer switches?
Yes, leading suppliers support OEM customization including enclosure material, control panel layout, meter integration, cable length, and branding. Minimum order quantities may apply for non-standard configurations (typically ≥50 units).
Are samples available before bulk ordering?
Most suppliers offer samples at 1.5–2x unit price, fully refundable upon order confirmation. Sample lead time is typically 5–10 days. Testing should include switching sequence accuracy, load transfer duration, and thermal performance under rated current.
What are common export packaging and logistics terms?
Standard export packaging includes reinforced cartons with foam lining; wooden crates for container loads. FOB Ningbo or FOB Shanghai are most common. Suppliers typically partner with freight forwarders to manage customs clearance and insurance under CIF or DDP terms upon request.









