Type C To Usb Adapter Producer
About type c to usb adapter producer
Where to Find Type C to USB Adapter Producers?
China remains the global epicenter for Type C to USB adapter manufacturing, with key production hubs concentrated in Shenzhen, Dongguan, and Guangzhou. These regions host vertically integrated facilities specializing in consumer electronics connectivity solutions, offering buyers access to mature supply chains for components such as precision-machined connectors, alloy casings, and high-speed data transmission circuitry. The proximity of raw material suppliers, injection molding services, and logistics networks enables streamlined production cycles and cost-efficient scaling.
Suppliers in this sector typically operate dedicated production lines for adapters, supporting both standard and customized configurations. Monthly output capacity varies significantly by manufacturer, with leading producers capable of fulfilling bulk orders exceeding 100,000 units. Material selection spans aluminum alloy, nylon braiding, and ABS plastic, influencing durability, heat dissipation, and signal integrity. Advanced processing techniques—including CNC machining, surface laser engraving, and automated soldering—ensure consistent electrical performance across high-volume batches.
How to Choose Type C to USB Adapter Suppliers?
Selecting a reliable producer requires rigorous evaluation of technical, operational, and transactional indicators:
Production & Engineering Capabilities
Verify ownership of in-house production lines to ensure control over quality and lead times. Prioritize suppliers with documented customization capabilities, including logo imprinting, color variation, cable length adjustment, and packaging design. Evidence of R&D investment—such as support for USB 3.0/3.1 standards, OTG functionality, or 10Gbps data transfer rates—indicates technical competence.
Quality Assurance Systems
While formal certifications (e.g., ISO 9001, CE, RoHS) are not explicitly listed in available data, consistent on-time delivery performance and low defect rates serve as proxy indicators. Target suppliers with on-time delivery rates exceeding 95%, response times under 6 hours, and reorder rates above 18%—metrics associated with stable production management and customer satisfaction.
Order Flexibility and Transaction Metrics
Assess minimum order quantity (MOQ) requirements against procurement scale:
- Entry-level MOQs range from 10–50 pieces, suitable for sampling or small distributors
- Bulk pricing applies at 100+ units, with some suppliers requiring 500+ for customized OEM orders
- Average unit prices span $0.19–$0.55, influenced by materials, data speed rating, and connector build
Cross-reference pricing with product specifications to identify value outliers. Confirm whether suppliers support third-party inspection or escrow-based payment terms to mitigate fulfillment risk.
What Are the Best Type C to USB Adapter Producers?
| Company Name | Location | Main Products | Customization Options | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Jian Yang Jia Ya Technology Co., Limited | Shenzhen, CN | Adapters & Connectors, Data Cables, USB Hubs | Not specified | 100% | ≤3h | 22% | $10,000+ | $0.20–$0.53 |
| Dongguan Youku Electronic Technology Limited | Dongguan, CN | Adapters & Connectors, Data Cables | Color, material, size, logo, packaging, label, graphic | 88% | ≤3h | 15% | $10,000+ | $0.25–$0.55 |
| Guangzhou Dxgroups Trading Co., Limited | Guangzhou, CN | Data Cables, Adapters & Connectors, Chargers | OEM/ODM with metal casing and logo customization | 92% | ≤5h | 20% | $7,000+ | $0.21–$0.59 |
| Shenzhen Futian Maiyouka E-Commerce Firm | Shenzhen, CN | Adapters & Connectors, USB Hubs, GPS Trackers | Not specified | 98% | ≤6h | <15% | $10,000+ | $0.06–$0.30 |
| Shenzhen Opelu Technology Co., Ltd. | Shenzhen, CN | Adapters & Connectors, Data Cables, USB Hubs | Factory-level OEM with multi-port and hub integration | 95% | ≤3h | 18% | $20,000+ | $0.33–$4.10 |
Performance Analysis
Shenzhen Jian Yang Jia Ya stands out with a perfect 100% on-time delivery rate and strong reorder performance (22%), indicating robust production planning and customer retention. Shenzhen Opelu commands higher price points due to advanced offerings like 10Gbps adapters and multi-function hubs, supported by the highest reported online revenue ($20,000+). Dongguan Youku offers broad customization breadth but lags in delivery reliability (88%) and repeat business (15%). Shenzhen Futian Maiyouka delivers competitive pricing from $0.06/unit, though lower reorder rates suggest potential gaps in long-term satisfaction. Guangzhou Dxgroups balances solid delivery (92%) and customization for OEM clients, making it suitable for branded deployments.
FAQs
How to verify Type C to USB adapter producer reliability?
Evaluate on-time delivery history, response time consistency, and reorder rates as operational health indicators. Request product samples to assess build quality, plug fit, and data transfer stability. For high-volume contracts, conduct virtual factory audits to confirm in-house production line ownership and process controls.
What is the typical sampling timeline?
Standard adapter samples are typically produced within 7–15 days. Custom designs involving logo engraving, unique housing materials, or specialized cabling may require 2–3 weeks. Add 5–10 days for international express shipping.
Can suppliers produce customized Type C to USB adapters?
Yes, most established producers support OEM/ODM services, including custom branding, color schemes, packaging, and connector configurations. MOQs for customization typically start at 500 units, with pricing adjusted for material and labor complexity.
Do manufacturers offer free samples?
Sample policies vary: some suppliers provide paid samples refundable against future orders, while others charge full cost. Free samples are rare but may be offered for high-potential buyers or standard products below $0.30/unit.
What are common lead times for bulk orders?
Standard production lead times range from 15–25 days after order confirmation and deposit receipt. Orders requiring tooling or custom molds may extend to 30–40 days. Air freight adds 5–7 days globally; sea freight requires 25–40 days depending on destination port.









