Wholesale Computer Memory
About wholesale computer memory
Where to Find Wholesale Computer Memory Suppliers?
China remains the global epicenter for computer memory manufacturing, with Shenzhen emerging as a dominant hub for RAM production and export. The city’s advanced electronics ecosystem integrates component fabrication, testing, and logistics within tightly coordinated supply chains, enabling rapid prototyping and high-volume output. Suppliers in this region benefit from proximity to semiconductor distributors, PCB manufacturers, and packaging facilities, reducing material lead times by 20–30% compared to non-specialized regions.
The Shenzhen cluster supports both standardized and customized memory solutions, offering DDR3, DDR4, SO-DIMM, and UDIMM modules for desktops, laptops, servers, and embedded systems. With established export channels to North America, Europe, and Southeast Asia, suppliers achieve average delivery windows of 15–25 days post-order confirmation. Economies of scale allow competitive pricing—especially for bulk orders—while maintaining access to technical specialists for compatibility validation and OEM branding.
How to Choose Wholesale Computer Memory Suppliers?
Selecting reliable partners requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical & Product Compliance
Verify support for industry-standard specifications including JEDEC memory timing, voltage tolerances (e.g., 1.2V for DDR4), and latency profiles. For international buyers, ensure adherence to RoHS and REACH regulations. Request test reports on signal integrity, thermal performance, and endurance under sustained workloads—particularly critical for server-grade or industrial applications.
Production and Customization Capability
Assess supplier flexibility based on available customization options:
- Support for branded labeling, custom packaging, and logo printing
- Memory module personalization (color coding, heat spreader design, RGB lighting)
- OEM/ODM services covering PCB layout, IC sourcing, and firmware tuning
Cross-reference product listings with reorder rates and response times to gauge reliability and customer satisfaction.
Ordering Terms and Transaction Security
Evaluate minimum order quantities (MOQs), which range from 1 piece for sample testing to 50+ units for volume pricing. Prioritize suppliers with third-party transaction protection mechanisms and clear dispute resolution policies. Confirm warranty terms (typically 1–3 years) and return conditions for defective units. Pre-shipment inspection rights are recommended for orders exceeding 500 units.
What Are the Best Wholesale Computer Memory Suppliers?
| Company Name | Main Products (Listings) | Online Revenue | On-Time Delivery | Reorder Rate | Avg. Response | Customization Options | Sample MOQ |
|---|---|---|---|---|---|---|---|
| Shenzhen Macroway Technology Co., Ltd. | RAMs (918) CPUs (469) Hard Drives (431) | US $310,000+ | 99% | 46% | ≤7h | DDR4/DDR3, size, color, label, logo, compatibility | 1 piece |
| Shenzhen Eon Technology Co., Ltd. | Hard Drives (347) CPUs (168) RAMs (111) | US $1,700,000+ | 97% | 17% | ≤3h | Limited (OEM-focused DDR4/DDR3) | 1 piece |
| Shenzhen Meixin Electronics Co., Ltd. | RAMs (N/A) DDR4/DDR3 variants | US $160,000+ | 98% | 30% | ≤4h | Speed, size, color, RGB, packaging, logo | 10 pieces |
| Aojun (Shenzhen) Technology Co., Ltd. | RAMs (39) Hard Drives (14) | US $70,000+ | 91% | 66% | ≤4h | DDR3/DDR4 laptop/desktop, custom labeling | 2–10 pieces |
| Shenzhen Juhor Precision Technology Co., Ltd. | RAMs (251) Hard Drives (69) | US $10,000+ | 77% | <15% | ≤5h | OEM DDR4 3200MHz, branded kits | 1 piece |
Performance Analysis
Shenzhen Macroway leads in product breadth and fulfillment consistency, with a 99% on-time delivery rate and extensive RAM inventory. Its high reorder rate (46%) reflects strong buyer retention, supported by broad customization capabilities. Shenzhen Eon Technology reports the highest online revenue (US $1.7M+), indicating robust sales volume, though its lower reorder rate suggests potential gaps in post-sale service or quality consistency.
Aojun stands out for customer loyalty, achieving a 66% reorder rate despite moderate delivery performance (91%), signaling strong niche appeal—likely due to responsive communication and flexible small-batch production. Shenzhen Meixin offers comprehensive customization features, including RGB-enabled modules and bandwidth-specific tuning, making it suitable for gaming and specialty markets. Juhor Precision, while offering OEM-grade DDR4 solutions, shows below-average delivery reliability (77%), warranting caution for time-sensitive contracts.
FAQs
How to verify wholesale computer memory supplier reliability?
Cross-check stated certifications (e.g., ISO, RoHS) through official registries. Request batch test reports for read/write speed, error correction, and temperature resilience. Analyze transaction history, focusing on consistent on-time delivery (>95%) and reorder rates above 30% as indicators of satisfaction.
What is the typical sampling timeline for memory modules?
Standard samples ship within 3–7 days after order confirmation. Custom-branded or performance-tuned units require 10–14 days for configuration and testing. Air freight adds 5–8 days for international delivery.
Do suppliers support global shipping and customs clearance?
Yes, most suppliers offer EXW, FOB, or CIF shipping terms with documentation compliant with destination regulations. Confirm inclusion of commercial invoices, packing lists, and conformity certificates prior to dispatch.
Are free samples available for wholesale buyers?
Policies vary: some suppliers provide paid samples refundable against future orders, while others charge full cost for initial testing. Free samples are typically reserved for qualified buyers placing follow-up orders above 100 units.
How to initiate OEM/ODM memory projects?
Submit detailed requirements including form factor (DIMM/SO-DIMM), capacity, speed grade, voltage, PCB color, label design, and packaging format. Reputable suppliers respond with compatibility assessments and prototype timelines within 72 hours.









