Yogurt Maker With Timer
CN
About yogurt maker with timer
Where to Find Yogurt Maker with Timer Suppliers?
China remains the dominant manufacturing hub for small electric kitchen appliances, including yogurt makers with timer functionality. Key production clusters are concentrated in Zhejiang and Guangdong provinces, where vertically integrated supply chains support rapid prototyping and high-volume output. Ningbo in Zhejiang hosts a dense network of appliance manufacturers specializing in compact household devices, leveraging proximity to component suppliers for heating elements, timers, and food-grade plastics. This regional specialization enables cost efficiencies of 15–25% compared to non-specialized producers.
Guangdong-based suppliers benefit from advanced tooling and injection molding infrastructure, allowing for faster mold development and lower per-unit costs in large batches. The region’s export-oriented ecosystem supports direct container consolidation through Shenzhen and Guangzhou ports, reducing logistics lead times by up to 10 days for trans-Pacific shipments. Buyers gain access to mature production ecosystems capable of fulfilling both standardized and customized orders with minimal setup delays.
How to Choose Yogurt Maker with Timer Suppliers?
Selecting reliable suppliers requires adherence to structured evaluation criteria focused on technical capability, operational reliability, and transactional safeguards.
Production Capacity Verification
Assess minimum order quantity (MOQ) thresholds and scalability. Leading suppliers offer MOQs ranging from 500 to 1,000 units for standard models, while some accommodate as low as 2–8 pieces for sample or trial orders. Confirm monthly production capacity—manufacturers with dedicated yogurt maker lines typically sustain outputs exceeding 20,000 units/month. Prioritize suppliers listing specialized product categories such as yogurt makers, egg boilers, or dehydrators, indicating domain expertise.
Quality and Compliance Indicators
While explicit certification data is not provided, evaluate performance proxies:
- On-time delivery rates ≥96% indicate stable logistics execution
- Average response time ≤4 hours reflects operational responsiveness
- Reorder rates above 50% suggest customer satisfaction and product consistency
Although formal ISO or CE declarations are absent in available data, consistent transaction histories and repeat business serve as indirect indicators of quality control systems.
Customization and Technical Flexibility
Determine scope for modifications in color, material, capacity, logo imprinting, packaging, and instruction localization. Several suppliers explicitly list customization capabilities, including temperature control settings, digital vs. mechanical interfaces, and multi-batch processing designs. For private-label sourcing, verify graphic design and labeling support during pre-production phases.
What Are the Best Yogurt Maker with Timer Suppliers?
| Company Name | Main Products (Listings) | Online Revenue | On-Time Delivery | Response Time | Reorder Rate | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|
| Ningbo Myhome Electric Appliance Co., Ltd. | Waffle Makers (66), Air Fryers (51) | US $370,000+ | 100% | ≤7h | 50% | 500–1,000 pcs | $4.50–9.00 |
| Guangdong Winners Stainless Steel Industry Co., Ltd. | Commercial Yogurt Machines | US $40,000+ | 100% | ≤4h | <15% | 1–20 pcs | $30–43 |
| Ningbo Zoolann Import And Export Co., Ltd. | Yogurt Makers (21), Egg Boilers (25) | US $700+ | 100% | ≤3h | 50% | 1,000 units | $6.80–10.40 |
| Yiwu Aikelansi Electrical Appliance Co., Ltd. | Customizable Designs | US $240,000+ | 96% | ≤4h | 17% | 2–8 pcs | $7.13–14.22 |
| Ningbo Hiking Electric Appliance Co., Ltd. | Digital & Mechanical Models | US $1,000,000+ | 100% | ≤4h | <15% | 1,000 pcs | $4.80–11.42 |
Performance Analysis
Suppliers vary significantly in market positioning and operational focus. Ningbo Hiking leads in online sales volume (over US$1M revenue), offering competitive pricing from $4.80/unit, ideal for high-volume retail buyers. Ningbo Myhome and Ningbo Zoolann demonstrate strong customer retention with 50% reorder rates, suggesting consistent product quality and service reliability. Guangdong Winners targets commercial clients with premium-priced ($30–43) smart and large-capacity models (8L–12L), supporting single-piece sampling—rare in this category—enabling low-risk testing. Yiwu Aikelansi provides flexible MOQs starting at 2 pieces, suitable for niche or startup brands requiring agile fulfillment. Despite lower reorder rates, several suppliers maintain 100% on-time delivery, underscoring logistical discipline even among newer exporters.
FAQs
How to verify yogurt maker with timer supplier reliability?
Evaluate on-time delivery records (target ≥96%), response speed (ideally ≤4 hours), and reorder rate as proxies for satisfaction. Request factory videos or third-party inspection reports if certifications are not publicly listed. Analyze product listings for consistency in specifications and professional presentation.
What is the typical sampling timeline?
Standard samples take 7–15 days to produce, depending on customization level. Shipping via express courier adds 3–7 days internationally. Some suppliers offer expedited turnaround within 5 days for non-custom items.
Can suppliers ship globally?
Yes, all listed suppliers have international transaction experience. Confirm Incoterms (FOB, CIF, DDP) and coordinate with freight forwarders for customs compliance, particularly regarding electrical safety standards in destination markets.
Do suppliers provide free samples?
Free samples are uncommon. Most charge full or partial fees, which may be credited toward bulk orders. Sample costs typically range from $30–50, excluding shipping.
How to initiate customization requests?
Submit detailed requirements covering capacity (0.7L–1.6L), timer type (digital/mechanical), voltage (110V/220V), housing material (PP/ABS), and branding elements. Reputable suppliers will respond with technical drawings, BOMs, and prototype timelines within 48–72 hours.









