Fully Automated Production Lines | Large-scale, 24/7 operations | Processing Capacity: 15 TPH (Industry Standard) ▲ 18 TPH (Our Base) ▲ 22 TPH (Our Advanced) (ISO 9001 certified) | ▲ 15% higher output than industry standard, PLC-controlled automation (IEC 61131-3), 1-year warranty (▲ industry standard: 6 months) | High upfront cost, requires skilled technicians, complex maintenance setup |
Semi-Automated Production Lines | Medium-scale, flexible operations | Automation Level: Partial PLC (ISO 13849 compliant), Capacity: 8 TPH (Industry) ▲ 10 TPH (Our Base) ▲ 12 TPH (Advanced) | Lower cost than fully automated, easier operation, modular scalability (ASTM E2984) | 40% lower throughput than fully automated, labor dependency persists |
Manual Production Lines | Small-scale, budget-conscious setups | Manual operation (OSHA compliant), Capacity: 3 TPH (Industry) ▲ 4 TPH (Our Base) ▲ 5 TPH (Advanced) | Lowest initial cost, easy adjustments, no specialized training required | Labor-intensive, inconsistent quality, 80% lower output than industry standard |
High-Capacity Production Lines | Bulk material suppliers, high-demand markets | Capacity: 25 TPH (Industry) ▲ 30 TPH (Our Base) ▲ 35 TPH (Advanced) (ISO 5088 compliant) | Handles 40% more volume than industry standard, dual conveyor systems | Requires large facility space, higher energy consumption (▲ 15% more than energy-efficient models) |
Energy-Efficient Production Lines | Eco-conscious manufacturers, cost-sensitive regions | Energy Use: 120 kWh/T (Industry) ▲ 100 kWh/T (Our Base) ▲ 85 kWh/T (Advanced) (ISO 50001 certified) | 30% lower operational costs, meets EU energy regulations | 20% lower capacity than high-capacity lines, requires specialized infrastructure |
Modular/Customizable Production Lines | Startups, niche markets, scalable needs | Plug-and-play design (IEC 61499 compliant), Customization: 80% client specs (ASTM E2984) | Tailored solutions, 30% faster deployment than fixed systems | Longer setup time (▲ 10 days vs industry’s 14 days), potential compatibility risks |