headerSsrResult
Ad

2 Stroke Engine Vs 4 Stroke Engine

supplierLogo
Qingdao Jianqing Rubber Product Co., Ltd.
Shandong, countryFlag CN
4.9/5
verifiedSupplier
20 yrs
40+ staff
1,800+
#9 most popular in Other Rubber Products
IATF 16949
Warranty available
Finished product inspection
On-time delivery
94%
Reorder rate
33%
Response time
≤5h
Online revenue
US $40,000+
Main products (number of listings)
Other Rubber Products
(382)
Boat Engines
(237)
Other Marine Supplies
(41)
Automotive Rubber
(18)
Rubber Sheets
(12)
Plastic Sheets
(9)
VR
Top sponsor listing
supplierLogo
UB LEISURE
Gauteng, countryFlag ZA
1 yr
Matches 3/3 requirements
arrow
On-time delivery
-
Reorder rate
-
Response time
≤14h
Online revenue
-
Main products (number of listings)
Other Hand Tools
(419)
Boat Engines
(374)
Sportbikes
(256)
New Cars
(78)
Lawn Mowers
(39)
Jetski
(17)
supplierLogo
Shaanxi Kanglongsi Auto Parts Co., Ltd.
Shaanxi, countryFlag CN
4.7/5
2 yrs
Matches 3/3 requirements
arrow
On-time delivery
98%
Reorder rate
17%
Response time
≤5h
Online revenue
US $290,000+
Main products (number of listings)
Boat Engines
(178)
Other Truck Parts
(28)
Gasoline Generators
(28)
Heavy Duty Vehicle Parts & Accessories
(12)
Truck Engines
(9)
Clutch Kits & Accessories
(9)
supplierLogo
Heyuan Maitexiong Yacht Co., Ltd.
Guangdong, countryFlag CN
4.7/5
verifiedSupplier
3 yrs
Matches 3/3 requirements
arrow
ISO
Warranty available
Supplier assessment procedures
Full customization
ODM service available
Finished product inspection
On-time delivery
93%
Reorder rate
35%
Response time
≤1h
Online revenue
US $420,000+
Customization options
color
material
size
logo
packaging
label
graphic
supplierLogo factory
Wuxi Pinnacle Mechanical Equipment Co., Ltd.
Jiangsu, countryFlag CN
5.0/5
verifiedSupplier
9 yrs
10+ staff
140+
Matches 2/3 requirements
arrow
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
100%
Reorder rate
<15%
Response time
≤2h
Online revenue
US $70,000+
Customization options
color
material
size
logo
packaging
label
graphic
supplierLogo
SO GINGE SARL
Saint-Genis-Pouilly, countryFlag FR
2 yrs
Matches 3/3 requirements
arrow
On-time delivery
-
Reorder rate
-
Response time
≤8h
Online revenue
-
Main products (number of listings)
Plants Oil
(214)
Baby Diaper
(158)
Corn
(138)
Aluminum Ingots
(97)
Copper Scrap
(88)
Deodorant & Antiperspirant
(88)
supplierLogo
SD Mrak Besitz GmbH
Klagenfurt am Worthersee, countryFlag AT
3 yrs
Matches 3/3 requirements
arrow
On-time delivery
-
Reorder rate
-
Response time
≤5h
Online revenue
-
Main products (number of listings)
Used Cars
(2011)
Used Tractors
(460)
Boat Engines
(411)
Other Trucks
(220)
New Cars
(218)
Machinery Engine Parts
(151)
supplierLogo
Shenzhen Kingstar Technology Co., Ltd.
Guangdong, countryFlag CN
4.7/5
2 yrs
Matches 3/3 requirements
arrow
On-time delivery
98%
Reorder rate
<15%
Response time
≤1h
Online revenue
US $40,000+
Main products (number of listings)
LED Headlights
(308)
LED Tail Lights
(265)
Motorcycle Engine Assembly
(140)
Car Bumpers
(129)
Car DVD Player
(65)
Car Spoilers
(60)
supplierLogo
Cangzhou Yuqi International Trade Co., Ltd.
Hebei, countryFlag CN
4.5/5
8 yrs
Matches 2/3 requirements
arrow
On-time delivery
100%
Reorder rate
<15%
Response time
≤8h
Online revenue
US $300+
Main products (number of listings)
Boat Engines
(233)
supplierLogo
Chongqing Fuwang General Machinery Equipment Co., Ltd.
Chongqing, countryFlag CN
5.0/5
9 yrs
Matches 2/3 requirements
arrow
On-time delivery
88%
Reorder rate
30%
Response time
≤4h
Online revenue
US $50,000+
Main products (number of listings)
Machinery Engines
(289)
Gasoline Generators
(213)
Gas Turbine Generators
(34)
Generator Parts & Accessories
(29)
Diesel Generators
(23)
Pumps
(22)
supplierLogo
Taizhou Hairui Yacht Co., Ltd.
Zhejiang, countryFlag CN
4.6/5
5 yrs
Matches 3/3 requirements
arrow
On-time delivery
50%
Reorder rate
<15%
Response time
≤1h
Online revenue
US $7,000+
Main products (number of listings)
Boat Engines
(139)
Rowing Boats
(22)
Other Marine Supplies
(7)
Fishing Tools&Accessories
(4)
Marine Propellers
(3)
Yachts
(2)
No supplier images available
supplierLogo
Changzhou Future Trading Co., Ltd.
Jiangsu, countryFlag CN
5.0/5
2 yrs
Matches 2/3 requirements
arrow
On-time delivery
100%
Reorder rate
<15%
Response time
≤2h
Online revenue
US $6,000+
Main products (number of listings)
Machinery Engines
(195)
Diesel Generators
(59)
Gasoline Generators
(54)
Water Treatment Machinery
(39)
Industrial Power Supplies
(17)
Tractors
(6)
supplierLogo
Changsha Terry Machinery Co., Ltd.
Hunan, countryFlag CN
4.9/5
verifiedSupplier
15 yrs
10+ staff
150+
Matches 3/3 requirements
arrow
Warranty available
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
90%
Reorder rate
25%
Response time
≤4h
Online revenue
US $1,100,000+
Customization options
color
material
size
logo
packaging
label
graphic
supplierLogo
Hangzhou Zero One Trading Co., Ltd.
Zhejiang, countryFlag CN
4.7/5
3 yrs
Matches 3/3 requirements
arrow
On-time delivery
100%
Reorder rate
18%
Response time
≤12h
Online revenue
US $40,000+
Main products (number of listings)
Boat Engines
(2813)
Marine Propellers
(74)
No supplier images available
supplierLogo
Guangzhou Hanglang Yacht Co., Ltd.
Guangdong, countryFlag CN
4.5/5
2 yrs
Matches 3/3 requirements
arrow
On-time delivery
100%
Reorder rate
38%
Response time
≤2h
Online revenue
US $80,000+
Main products (number of listings)
Boat Engines
(479)
Marine Propellers
(1)
supplierLogo
ABA FRIO LTDA
Contagem MG, countryFlag BR
1 yr
Matches 3/3 requirements
arrow
On-time delivery
-
Reorder rate
-
Response time
≤5h
Online revenue
-
Main products (number of listings)
Animal Feed
(280)
Pork
(274)
Chicken
(156)
Plants Oil
(114)
Recycled Plastic
(77)
Single Spices & Herbs
(62)
No supplier images available
supplierLogo
Yongkang Xinhangji Industry And Trade Co., Ltd.
Zhejiang, countryFlag CN
5.0/5
2 yrs
Matches 3/3 requirements
arrow
On-time delivery
100%
Reorder rate
<15%
Response time
≤5h
Online revenue
US $800+
Main products (number of listings)
Boat Engines
(256)
Other Marine Supplies
(57)
Marine Hardware
(8)
No supplier images available
supplierLogo
Taizhou Newland Machinery Co., Ltd.
Zhejiang, countryFlag CN
5.0/5
verifiedSupplier
5 yrs
60+ staff
8,100+
Matches 2/3 requirements
arrow
EURO V CE 2006/42/EC
Warranty available
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
100%
Reorder rate
<15%
Response time
≤3h
Online revenue
US $100,000+
Customization options
color
material
size
electric start
logo
packaging
label
graphic
supplierLogo factory
Shijiazhuang Houfeng Trading Co., Ltd.
Hebei, countryFlag CN
4.8/5
verifiedSupplier
16 yrs
10+ staff
420+
Matches 2/3 requirements
arrow
CE
Agile supply chain
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
Patents awarded (2)
On-time delivery
100%
Reorder rate
28%
Response time
≤3h
Online revenue
US $680,000+
Customization options
engine configuration
color
housing
main bearing
generator
thrust washer
gasket set
photos
drawings
trailer-mounted
assembly
logo
engine speed
model
piston kit
gearbox
power
connecting rod bearing
pump
graphic
cylinder liner
short block
hydraulic pump
packaging
label
engine power
rpm
control panel
material
size
skid-mounted
cylinder
belt guard
compressor
dimensions
supplierLogo
Tianjin Xiangyu Electric Vehicle Co., Ltd.
Tianjin, countryFlag CN
4.7/5
verifiedSupplier
4 yrs
120+ staff
500+
Matches 3/3 requirements
arrow
Agile supply chain
Supplier assessment procedures
Full customization
Minor customization
ODM service available
Finished product inspection
On-time delivery
100%
Reorder rate
<15%
Response time
≤3h
Online revenue
US $590,000+
Customization options
color
material
size
logo
packaging
label
graphic

About 2 stroke engine vs 4 stroke engine

Where to Find 2 Stroke Engine vs 4 Stroke Engine Suppliers?

China remains the central hub for internal combustion engine manufacturing, with key supplier clusters in Shandong, Shaanxi, and Guangdong provinces. These regions host vertically integrated production networks specializing in small-displacement gasoline engines used in marine propulsion, agricultural machinery, and power generation. Shandong’s Qingdao zone emphasizes rubber-integrated engine components and marine-grade sealing systems, while Shaanxi’s Xi’an corridor focuses on outboard motor assembly with direct access to automotive-grade casting facilities.

The industrial ecosystems support rapid prototyping and scalable output, leveraging localized supply chains for carburetors, crankshafts, and cooling systems. This integration reduces component procurement lead times by 20–35% compared to offshore alternatives. Manufacturers typically operate multi-line facilities capable of producing both 2-stroke and 4-stroke variants using shared fuel delivery and ignition modules, enabling flexible order fulfillment. Average production cycles range from 15 to 30 days for standard configurations, with MOQs as low as one unit for export-ready models.

How to Choose 2 Stroke Engine vs 4 Stroke Engine Suppliers?

Procurement decisions should be guided by verifiable performance metrics and technical capabilities:

Technical Compliance
Confirm adherence to international emissions and safety standards such as EPA, CE, or RoHS where applicable. While not all suppliers hold formal ISO 9001 certification, prioritize those demonstrating structured quality management through documented testing protocols for compression ratios, fuel efficiency, and vibration control.

Production Capability Audits
Assess operational scale through objective indicators:

  • Facility size exceeding 2,000m² for sustained volume output
  • Dedicated R&D or engineering teams focused on thermal efficiency optimization
  • In-house machining for cylinder blocks, pistons, and crankcases
    Cross-reference on-time delivery rates (target ≥93%) with response time data to evaluate operational responsiveness.

Transaction Safeguards
Utilize secure payment mechanisms such as escrow services to mitigate risk. Analyze reorder rates as a proxy for customer satisfaction—values above 30% indicate strong post-sale reliability. Request sample units to validate claimed specifications, particularly for horsepower ratings, weight-to-power ratio, and cold-start performance under real-world conditions.

What Are the Best 2 Stroke Engine vs 4 Stroke Engine Suppliers?

Company Name Main Products (Listings) On-Time Delivery Reorder Rate Avg. Response Online Revenue Customization
Qingdao Jianqing Rubber Product Co., Ltd. Boat Engines (237), Other Rubber Products (382) 94% 33% ≤5h US $40,000+ Not specified
UB LEISURE Boat Engines (374), Other Hand Tools (419) - - ≤14h - Not specified
Shaanxi Kanglongsi Auto Parts Co., Ltd. Boat Engines (178), Truck Engines (9) 98% 17% ≤5h US $290,000+ Not specified
Heyuan Maitexiong Yacht Co., Ltd. Boat Engines (varied HP models) 93% 35% ≤1h US $420,000+ Color, material, size, logo, packaging, label, graphic
Wuxi Pinnacle Mechanical Equipment Co., Ltd. Diesel & Electric Machinery (5+ models) 100% <15% ≤2h US $70,000+ Color, material, size, logo, packaging, label, graphic

Performance Analysis
Heyuan Maitexiong Yacht Co., Ltd. leads in transactional agility with a sub-1-hour average response time and extensive customization options across branding and physical parameters. Wuxi Pinnacle stands out for perfect on-time delivery performance and transparent customization capacity, despite a lower reorder rate suggesting room for post-sale engagement improvement. Shaanxi Kanglongsi demonstrates high reliability (98% on-time) with substantial online revenue, indicating robust export logistics. Qingdao Jianqing leverages its rubber product expertise to enhance gasket and seal durability in marine engine applications. UB LEISURE maintains a broad inventory but lacks verifiable delivery and financial metrics, introducing procurement uncertainty.

FAQs

How to verify 2 stroke vs 4 stroke engine supplier reliability?

Validate performance claims through third-party transaction records, video audits of production lines, and independent testing of supplied samples. Prioritize suppliers with documented quality control procedures and consistent online revenue histories exceeding US $100,000 annually.

What is the typical sampling timeline?

Sample production generally takes 7–14 days depending on engine complexity. Air freight delivery adds 5–10 days internationally. Suppliers may require full payment for initial samples unless future bulk orders are confirmed.

Can suppliers ship engines worldwide?

Yes, most established manufacturers offer global shipping via air or sea freight under FOB or CIF terms. Ensure compliance with destination regulations regarding emissions, noise levels, and import tariffs for internal combustion engines.

Do suppliers offer customization for 2 stroke and 4 stroke engines?

Selected suppliers provide OEM/ODM services including custom paint, labeling, packaging, and dimensional adjustments. Technical modifications such as carburetor tuning, exhaust configuration, or mounting brackets require engineering validation prior to production.

What are common MOQs and pricing structures?

MOQs vary from 1 unit for retail-ready models to 10+ sets for industrial-grade diesel variants. Pricing ranges from $128 for entry-level 2-stroke units to over $3,800 for high-horsepower 4-stroke outboards, influenced by materials, cooling type, and electronic ignition systems.