7 Segment Display Counter With 1 Push Button
About 7 segment display counter with 1 push button
Where to Find 7 Segment Display Counter with 1 Push Button Suppliers?
China remains the central hub for electronic counter manufacturing, with key supplier clusters concentrated in Zhejiang and Guangdong provinces. These regions host vertically integrated supply chains specializing in industrial electronics, enabling rapid component sourcing and streamlined production. Yueqing, within Zhejiang, is particularly renowned for its electrical equipment ecosystem, where over 1,200 manufacturers support a dense network of switchgear, sensor, and display component suppliers. This localization reduces material procurement cycles by up to 40% compared to decentralized markets.
Suppliers in these zones typically operate multi-line assembly facilities capable of producing both digital LED-based counters and programmable logic-controlled units. The integration of surface-mount technology (SMT) lines and automated testing stations allows consistent output of 7-segment display counters with push-button interfaces. Buyers benefit from proximity to specialized subcontractors for PCB fabrication, die-casting, and DIN rail enclosure production—all within a 50km radius. Typical lead times range from 7–15 days for standard orders, with cost advantages of 20–35% over European or North American alternatives due to lower labor and overhead expenses.
How to Choose 7 Segment Display Counter with 1 Push Button Suppliers?
Procurement decisions should be guided by structured evaluation criteria to ensure product reliability and supply chain stability:
Quality Assurance Verification
Confirm adherence to international standards such as ISO 9001 for quality management systems. While not always explicitly stated, CE and RoHS compliance is essential for market access in Europe and regulated industries. Request test reports on display longevity, button cycle durability (minimum 500,000 actuations), and EMI/EMC performance under industrial conditions.
Production and Technical Capacity
Assess operational scale through verifiable metrics:
- Facilities with dedicated SMT and aging test lines indicate process maturity
- In-house firmware programming capability for customizable count logic or reset functions
- Integration of optical inspection (AOI) for solder joint validation
Cross-reference on-time delivery rates—suppliers maintaining ≥96% demonstrate reliable workflow control. Prioritize those with response times under 3 hours for faster issue resolution.
Transaction and Risk Mitigation
Utilize secure payment mechanisms such as trade assurance or escrow services until product verification is complete. Analyze reorder rates as an indicator of customer satisfaction; values exceeding 30% suggest consistent quality and service. For initial engagements, request functional samples to validate build quality, display clarity under ambient light, and mechanical integrity of the push-button mechanism.
What Are the Best 7 Segment Display Counter with 1 Push Button Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|
| Beijing Shuntu Technology Co., Ltd. | Push Button Switches, Relays, Optical Sensors | US $100,000+ | 97% | ≤3h | 21% | 1–5 pieces | $24.68–$68.80 |
| Yueqing Ying's Import & Export Co., Ltd. | Encoders, PLCs, Proximity Sensors | US $40,000+ | 96% | ≤2h | 21% | 2–100 pieces | $6.50–$310 |
| Yueqing Yijia Electric Co.,ltd | Counters, Cable Ties, Circuit Breakers | US $1,000+ | 100% | ≤1h | <15% | 5 pieces | $5.22–$25 |
| Guangzhou Jinpeng Science And Technology Co., Ltd. | PLCs, VFDs, Relays, Timers | US $320,000+ | 98% | ≤1h | 39% | 1 set | $9.99 (fixed) |
| Chengdu Seren Equipment Co., Ltd. | Timers, Pressure Sensors, HMIs | US $140,000+ | 100% | ≤5h | 37% | 5 pieces | $35–$60 |
Performance Analysis
Guangzhou Jinpeng stands out with the highest reorder rate (39%) and competitive pricing at $9.99 per unit, indicating strong buyer retention likely driven by consistent product availability and affordability. Beijing Shuntu and Chengdu Seren offer mid-tier pricing with verified Autonics-compatible models, suitable for OEMs requiring brand interoperability. Yueqing Yijia provides the lowest price point ($5.22) for basic mechanical-digital hybrids, though limited transaction volume suggests niche positioning. Suppliers like Yueqing Ying’s cater to high-volume buyers with scalable MOQs, including bulk quotes for 100+ units. All top-tier suppliers maintain sub-3-hour response times, with three achieving ≤1h responsiveness—critical for urgent technical clarifications.
FAQs
How to verify 7 segment display counter supplier reliability?
Evaluate on-time delivery history, reorder rate, and response time as behavioral indicators of operational efficiency. Request product certifications and conduct sample testing for display brightness, button tactile feedback, and power consumption under continuous operation.
What is the typical minimum order quantity?
MOQs vary from 1 piece for premium programmable models to 5–10 pieces for budget variants. Some suppliers offer single-unit sampling at slightly higher unit costs. Bulk pricing applies consistently at 50+ units across most vendors.
Can suppliers customize counter functionality?
Yes, many suppliers support firmware adjustments for count direction (up/down), preset values, or auto-reset delays. Custom labeling, voltage specifications (DC 12V/24V), and extended temperature ranges are available upon request, subject to engineering review.
Do suppliers provide technical documentation?
Leading suppliers supply datasheets, wiring diagrams, and dimensional drawings. For integration into larger control systems, confirm availability of communication protocols (e.g., relay outputs) and compatibility with existing PLC inputs.
What are the average shipping timelines?
Pre-shipment processing takes 3–7 days post-payment. International delivery via express courier (DHL, FedEx) requires 5–10 business days. Sea freight is viable for container-sized orders, adding 25–40 days but reducing per-unit logistics costs significantly.









