Amazon Clear Ice Maker
CN
CN
About amazon clear ice maker
Where to Find Amazon Clear Ice Maker Suppliers?
China remains the dominant hub for manufacturing clear ice makers, with key supplier clusters concentrated in Guangdong and Jiangsu provinces. These regions offer mature ecosystems integrating plastic molding, refrigeration engineering, and appliance assembly, enabling efficient production of both consumer-grade and commercial units. Guangdong’s Shenzhen and Dongguan areas specialize in high-volume silicone molds and compact electric appliances, while Jiangsu's Yancheng and Suzhou zones focus on fully automated ice-making systems with advanced cooling technology.
The industrial clusters support vertical integration—from polymer processing to final electronics assembly—allowing suppliers to maintain tight control over component sourcing and quality assurance. This localization reduces lead times by 20–30% compared to offshore alternatives and enables flexible order fulfillment. Buyers benefit from proximity to Tier-1 material suppliers (e.g., BPA-free food-grade silicone, ABS plastic) and specialized logistics networks capable of handling temperature-sensitive components. Average production cycles range from 25–40 days for standard orders, depending on complexity and customization level.
How to Choose Amazon Clear Ice Maker Suppliers?
Procurement decisions should be guided by structured evaluation criteria focused on technical capability, compliance, and transaction reliability:
Manufacturing & Customization Capability
Assess whether suppliers can accommodate design modifications including mold creation, color matching (Pantone standards), logo embossing, packaging formats (polybag, blister pack, private label inserts), and electrical plug variants. Prioritize manufacturers offering end-to-end OEM/ODM services with in-house tooling departments. Minimum facility size for reliable volume output typically exceeds 3,000m², supported by dedicated R&D teams.
Quality Assurance Protocols
Verify adherence to international safety and material standards such as RoHS, REACH, and FDA compliance for food-contact materials. While formal ISO 9001 certification is not universally listed, consistent on-time delivery rates above 97% and documented response times under 6 hours serve as operational proxies for process discipline. Request test reports for leakage resistance, freeze cycle durability, and thermal efficiency where applicable.
Order Flexibility and Transaction Security
Evaluate minimum order quantities (MOQs), which vary significantly across product tiers—from as low as 2 pieces for pre-assembled units to 100+ sets for custom molds. Favor suppliers participating in trade assurance programs that offer payment protection and dispute mediation. Conduct sample testing before full-scale orders to validate clarity performance, ejection mechanism reliability, and noise levels during operation.
What Are the Best Amazon Clear Ice Maker Suppliers?
| Company Name | Location | Verified Type | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Min. Order Range |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Benhaida Rubber And Plastic Products Co., Ltd. | Guangdong, CN | Custom Manufacturer | US $220,000+ | 97% | ≤3h | 20% | Color, shape, mold, packaging, label, logo, graphic, size | 12–100 pcs/sets |
| Guangdong Invitop Technology Co., Ltd. | Guangdong, CN | Custom Manufacturer | US $210,000+ | - | ≤9h | - | Color, material, size, logo, packaging, plug, graphic | 2–100 pcs |
| Guangdong Taihe Refrigeration Technology Co., Ltd. | Guangdong, CN | Multispecialty Supplier | US $50,000+ | 100% | ≤2h | 33% | Capacity, refrigeration type, cooling method, voltage, design | 1 set |
| Guangzhou Argion Electric Appliance Co., Ltd. | Guangdong, CN | Custom Manufacturer | US $2,000+ | 100% | ≤13h | - | Material, size, logo, packaging, label, graphic | 10 cartons |
| Jiangsu Jinzhiyun Intelligent Technology Co., Ltd. | Jiangsu, CN | Custom Manufacturer | - | 100% | ≤6h | - | Capacity, design, voltage, branding | 1 set |
Performance Analysis
Shenzhen Benhaida stands out for low-cost silicone-based ice trays with extensive customization and strong reorder metrics, making it ideal for Amazon sellers targeting budget-conscious consumers. Guangdong Invitop offers mid-tier electric countertop models with flexible MOQs down to two units, suitable for sampling or niche market testing. For commercial-grade equipment, Guangdong Taihe and Jiangsu Jinzhiyun provide scalable solutions with full automation, high daily outputs (up to 500kg/day), and robust after-sales responsiveness. Notably, all top-performing suppliers report 100% on-time delivery, indicating strong production planning despite limited public revenue data. Buyers seeking premium crystal-clear cube machines should prioritize suppliers with stainless steel construction experience and validated cooling system designs.
FAQs
How to verify clear ice maker supplier reliability?
Cross-check claimed certifications with third-party verification platforms. Request factory audit reports or video walkthroughs highlighting injection molding lines, QC checkpoints, and packaging stations. Analyze customer feedback focusing on product consistency, freezing clarity, and mechanical longevity.
What is the typical sampling timeline?
Standard samples take 7–14 days for off-the-shelf models. Custom molds require 18–25 days for development and initial runs. Air shipping adds 5–10 days globally, depending on destination region.
Can suppliers ship worldwide?
Yes, most suppliers support global exports via air or sea freight. Confirm Incoterms (FOB, CIF, DDP) early in negotiations. Commercial units may require voltage adaptation (110V/220V) and CE/FCC documentation for customs clearance in North America and Europe.
Do manufacturers offer free samples?
Sample policies vary. Some suppliers refund sample costs upon bulk order placement (typically ≥500 units). For customized prototypes, expect fees covering 40–60% of development expenses, especially for new molds.
How to initiate customization requests?
Submit detailed specifications including desired ice shape (cube, sphere, diamond), mold material (silicone, ABS), capacity per cycle, power requirements, packaging format, and branding elements. Reputable suppliers will respond with CAD drawings or 3D renderings within 72 hours and provide functional prototypes within 3–4 weeks.










