Best Countertop Ice Cube Maker
CN
CN
About best countertop ice cube maker
Where to Find Countertop Ice Cube Maker Suppliers?
China remains the global epicenter for countertop ice cube maker manufacturing, with key production clusters in Guangdong and Zhejiang provinces. These regions host vertically integrated supply chains encompassing compressor fabrication, mold development, injection molding, and final assembly—enabling rapid prototyping and scalable output. Guangzhou and Ningbo-based suppliers dominate export activity, leveraging proximity to major ports like Shenzhen and Ningbo-Zhoushan for efficient containerized shipping.
The industrial ecosystem supports both high-volume OEM/ODM production and low-MOQ customized models. Facilities typically integrate automated production lines capable of 50–200 units per day per line, depending on model complexity. Buyers benefit from localized access to critical components such as evaporators, condensers, and refrigeration systems, reducing lead times by 15–25% compared to offshore alternatives. Average production cycles range from 25–40 days for standard orders, with express manufacturing options available for urgent procurement.
How to Choose Countertop Ice Cube Maker Suppliers?
Procurement decisions should be guided by systematic evaluation of technical, operational, and transactional indicators:
Technical & Quality Compliance
Verify adherence to international safety and performance standards including CE, RoHS, and UL certifications where applicable. For commercial-grade units, confirm compliance with NSF or ETL listings related to food-contact materials and electrical safety. Request test reports for compressor longevity (minimum 8,000-hour lifespan), energy consumption (Wattage per kg of ice produced), and noise levels (ideally below 45 dB).
Production Capacity Assessment
Evaluate supplier infrastructure based on the following benchmarks:
- Minimum factory area exceeding 3,000m² for sustained volume output
- In-house engineering teams supporting design modifications and tooling adjustments
- Capacity for both air-cooled and water-cooled systems across 15–200 kg/24h output ranges
Cross-reference claimed capacity with verified order history and on-time delivery rates (target ≥90%) to assess reliability under load.
Transaction Security & Procurement Terms
Prioritize suppliers offering third-party inspection services (e.g., SGS, BV) prior to shipment. Utilize secure payment mechanisms such as trade assurance or escrow services that release funds upon confirmation of product conformity. Confirm return policies for defective units and availability of spare parts inventory for post-sale support.
What Are the Best Countertop Ice Cube Maker Suppliers?
| Company Name | Main Products | Output Range (kg/24h) | Min. Order Quantity | Avg. Unit Price (USD) | On-Time Delivery | Avg. Response Time | Reorder Rate | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Guangzhou Guangshen Electric Produce Co., Ltd. | Ice Machines, Refrigeration Equipment | 100–150 | 1–10 pcs | $179–748 | 100% | ≤7h | - | Limited |
| NINGBO KAISON ELECTRIC APPLIANCE CO.,LTD | Commercial Ice Makers, Nugget Ice Systems | 50–200 | 2–100 pcs | $33–1,500 | 100% | ≤1h | 15% | Color, size, logo, packaging |
| Cixi Jirui Electric Appliance Co., Ltd. | Ice Makers, Crushers, Blenders | 135–200 | 2–10 pcs | $135–420 | 50% | ≤7h | <15% | Basic configurations |
| Guangzhou Dubang Electrical Appliances Co., Ltd. | High-Capacity Ice Machines | 80–200 | 1 set | $500–1,650 | 83% | ≤10h | 66% | Model-specific customization |
| Gongxingren Industrial Internet (Ningbo) Co., Ltd. | Mini & Portable Ice Makers | 25–100 | 50–100 pcs | $53–223 | 100% | ≤4h | <15% | Standardized variants |
Performance Analysis
NINGBO KAISON stands out for responsiveness (≤1h average reply time) and comprehensive customization capabilities, making it ideal for branded retail or hospitality clients requiring tailored designs. Guangzhou Dubang demonstrates strong customer retention (66% reorder rate), indicating reliable product quality and after-sales service despite moderate delivery consistency. Gongxingren and Guangshen achieve perfect on-time delivery records, suitable for time-sensitive procurement. However, Cixi Jirui’s 50% on-time delivery rate presents a logistical risk despite competitive pricing. Suppliers with lower MOQs (as low as 1 piece) offer flexibility for small businesses and pilot testing, while bulk producers provide unit cost advantages at 100+ quantities.
FAQs
How to verify countertop ice maker supplier reliability?
Cross-check certifications with issuing bodies and request recent batch test reports for refrigerant leakage, power efficiency, and cycle durability. Conduct virtual factory audits to observe assembly line operations and quality control checkpoints. Analyze buyer feedback focusing on defect rates, communication clarity, and resolution speed for discrepancies.
What is the typical sampling timeline?
Standard sample production takes 10–20 days, depending on whether existing molds are used. Custom designs involving new tooling may require 30–45 days. Air freight adds 5–10 days for international delivery. Sample costs typically range from 1.5x to 3x the unit price, partially refundable against future orders.
Can suppliers accommodate custom branding and design?
Yes, select manufacturers offer full ODM/OEM services including custom housing colors, logo embossing, user interface labeling, and packaging design. Minimum volumes vary: logo-only changes start at 50 units, while structural redesigns require 500+ units. Confirm material compatibility (ABS vs. stainless steel casings) and IP ratings for intended environments.
Do manufacturers support dropshipping or small-batch fulfillment?
A limited number support single-unit or small-lot fulfillment (MOQ: 1–5 units), primarily for portable or residential models. These arrangements often carry higher per-unit prices but enable e-commerce resellers to minimize inventory risk. Confirm fulfillment logistics and labeling requirements before integration.
What are common payment terms and logistics options?
Standard terms include 30% deposit, 70% before shipment, with options for LC or TT. FOB terms are standard; CIF can be arranged for full-container loads. Sea freight is optimal for orders over 20 units, while air freight suits samples and urgent deliveries under 500 kg.









