Built In Pellet Ice Maker
CN
CN
About built in pellet ice maker
Where to Find Built-in Pellet Ice Maker Suppliers?
China remains the central hub for built-in pellet ice maker manufacturing, with key supplier clusters located in Henan, Jiangsu, and Guangdong provinces. These regions host vertically integrated production ecosystems that combine refrigeration engineering, sheet metal fabrication, and automated assembly lines. Henan and Jiangsu are particularly prominent, offering proximity to stainless steel suppliers and logistics networks that reduce material lead times by 10–15% compared to offshore alternatives.
The industrial clusters support both high-volume OEM output and customized commercial-grade units, with many facilities operating under ISO 9001-aligned quality management systems. Average factory areas exceed 2,000m², enabling scalable production runs from prototype to mass order fulfillment. Buyers benefit from consolidated supply chains where compressors, evaporators, and control panels are sourced within 100km, minimizing component delays. Typical lead times range from 25 to 40 days for standard orders, with express production available for urgent shipments at a premium.
How to Choose Built-in Pellet Ice Maker Suppliers?
Effective supplier selection requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical Compliance & Quality Assurance
Confirm adherence to international standards such as CE, RoHS, and UL for electrical safety and environmental compliance—essential for market entry in North America and Europe. Request documentation for compressor performance (e.g., Copeland or Embraco specifications), condenser type (air-cooled vs. water-cooled), and energy efficiency ratings (kW/24h per kg of ice produced). Verify third-party testing reports for noise levels (typically 45–60 dB) and daily ice yield accuracy.
Production Capability Verification
Assess infrastructure through verifiable metrics:
- Minimum facility size of 1,500m² for consistent batch production
- In-house capabilities in sheet metal stamping, refrigerant charging, and final assembly
- Dedicated R&D or engineering team for custom design integration
Cross-reference on-time delivery rates (target ≥94%) and response times (ideally ≤3 hours) as indicators of operational reliability.
Customization and Transaction Security
Prioritize suppliers offering customization in dimensions, ice bin capacity, control panel interface, and finish materials (e.g., 304 stainless steel). Ensure packaging supports export conditions, including moisture-resistant cartons and corner protectors. Utilize secure payment methods with escrow protection and inspect sample units before full dispatch. Evaluate reorder rates as a proxy for customer satisfaction—rates above 25% indicate strong post-sale reliability.
What Are the Best Built-in Pellet Ice Maker Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Min. Order Quantity |
|---|---|---|---|---|---|---|---|---|
| Henan Icebear Electric Appliance Co., Ltd. | Henan, CN | Ice Machines, Refrigeration Parts | US $2,000+ | 100% | ≤1h | - | No data | 1 piece |
| Jiangyin Brenu Industry Technology Co., Ltd. | Jiangsu, CN | Custom Ice Makers, Gourmet Pellet Units | US $140,000+ | 94% | ≤3h | 26% | Size, logo, packaging | 1 set |
| Foshan Shunde Maoduoyu Trading Co., Ltd. | Guangdong, CN | Countertop, Mini Ice Makers | US $100,000+ | 100% | ≤1h | <15% | No data | 1 unit |
| Ningbo Aquart Electrical Appliance Co., Ltd. | Zhejiang, CN | Portable, Countertop Pellet Makers | US $140,000+ | 100% | ≤6h | 33% | Nugget type, color, size, logo, packaging | 1,000 pieces |
| Henan Maggie Trading Co., Ltd. | Henan, CN | Energy-Efficient Commercial Units | US $230,000+ | 100% | ≤1h | <15% | Color, material, capacity, logo, packaging | 1–5 pieces |
Performance Analysis
Henan-based suppliers demonstrate superior responsiveness, with three companies achieving sub-1-hour average reply times and perfect on-time delivery records. Jiangyin Brenu and Ningbo Aquart stand out for customization breadth, supporting tailored designs for commercial kitchens and hospitality environments. While Ningbo Aquart’s MOQ starts at 1,000 pieces, it offers extensive branding flexibility ideal for private-label buyers. In contrast, Henan Icebear and Maggie Trading provide low MOQs (1 piece) suitable for pilot orders or niche applications. Reorder rates suggest Ningbo Aquart (33%) and Jiangyin Brenu (26%) maintain stronger client retention, indicating reliable product performance and service consistency.
FAQs
How to verify built-in pellet ice maker supplier reliability?
Cross-check claimed certifications (CE, ISO) with official databases or request audit summaries. Analyze transaction history, focusing on on-time delivery consistency and dispute resolution outcomes. Request references or third-party inspection reports from prior buyers, especially for large-volume contracts.
What is the typical sampling timeline?
Standard samples take 7–14 days to produce, depending on customization level. Complex configurations involving modified cooling systems or embedded controls may require 20–25 days. Air freight adds 5–10 days for international delivery.
Can suppliers ship built-in pellet ice makers worldwide?
Yes, most established manufacturers manage global logistics via FOB or CIF terms. Confirm compatibility with local voltage (110V/220V), plug types, and refrigerant regulations (e.g., R290 compliance). Sea freight is recommended for containerized orders to optimize cost efficiency.
Do suppliers offer free samples?
Free samples are uncommon for commercial-grade units. Most suppliers charge 50–100% of unit cost, refundable upon placement of a bulk order. Discounts apply when sample fees are credited toward minimum order quantities.
How to initiate customization requests?
Submit detailed technical requirements including dimensional constraints, ice production rate (kg/24h), installation type (undercounter, freestanding), power specifications, and desired user interface. Leading suppliers provide CAD drawings or 3D models within 5–7 business days for approval prior to prototyping.









