Cnc Lathe Machine Factory
CN
About cnc lathe machine factory
Where to Find CNC Lathe Machine Suppliers?
China remains the global epicenter for CNC lathe machine manufacturing, with key production hubs concentrated in Guangdong, Shandong, and Jiangsu provinces. These regions host vertically integrated industrial ecosystems that support end-to-end production—from raw material processing and casting to precision machining and final assembly. Taian (Shandong), Shenzhen (Guangdong), and Changzhou (Jiangsu) have emerged as core clusters due to their access to skilled technical labor, mature supply chains for servo systems and tooling components, and proximity to major export ports.
Suppliers in these zones typically operate dedicated production lines for CNC turning equipment, enabling scalable output and rapid prototyping. The localized availability of cast iron beds, linear guides, ball screws, and spindle units reduces component lead times by 20–30% compared to offshore alternatives. Buyers benefit from consolidated sourcing networks where machining centers, electrical cabinet builders, and automation integrators are located within 50 km, ensuring faster troubleshooting and customization turnaround. Standard order fulfillment averages 30–45 days, with express production options available for urgent requests.
How to Choose CNC Lathe Machine Suppliers?
Selecting a reliable supplier requires rigorous evaluation across technical, operational, and transactional dimensions:
Production Infrastructure Verification
Confirm suppliers possess in-house manufacturing capabilities, including CNC machining centers, heat treatment facilities, and assembly lines. Prioritize companies with minimum factory areas exceeding 3,000m² and documented monthly output capacity. Evidence of owned production lines—rather than OEM-only models—indicates greater control over quality and delivery timelines.
Quality Assurance & Compliance
Demand ISO 9001 certification as a baseline for quality management systems. For exports to regulated markets, verify CE marking or equivalent safety compliance. Request documentation on spindle runout tests, backlash measurements, and thermal stability reports. Suppliers should conduct full-load testing on finished machines before shipment.
Customization & Technical Support
Evaluate flexibility in accommodating custom specifications:
- Control system options (e.g., Fanuc, Siemens, GSK, Syntec)
- Spindle configurations (single/dual, live tooling, Y-axis milling capability)
- Automation integration (bar feeders, gantry loaders, robotic cells)
- Software compatibility (CAD/CAM interface, DNC connectivity)
Assess responsiveness through average reply time (target ≤2 hours) and availability of multilingual engineering support.
Transaction Risk Mitigation
Utilize secure payment mechanisms such as letter of credit or escrow services until post-delivery acceptance testing is completed. Review historical performance metrics including on-time delivery rate (target ≥95%) and reorder rate (indicative of customer satisfaction). Conduct video audits of assembly processes and request sample unit inspections prior to bulk orders.
What Are the Best CNC Lathe Machine Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Product Range |
|---|---|---|---|---|---|---|---|---|
| Taian Hiscience Machinery Co., Ltd. | Shandong, CN | CNC Lathe, Tire Changers, Drilling Machines | US $580,000+ | 100% | ≤1h | 42% | Color, Material, Size, Logo, Packaging, Design, Graphics | Wide: Mini to Heavy-Duty Models |
| Changzhou Weizhuo Industrial Technology Co., Ltd. | Jiangsu, CN | CNC Lathe, Other Vehicle Equipment | US $10,000+ | 87% | ≤3h | <15% | Color, Material, Size, Logo, Packaging, Model, Graphics | Narrow: 4–8 Axis Standard Lathes |
| Shenzhen Richon Industry Co., Ltd. | Guangdong, CN | CNC Lathe, Metal Processing Equipment | US $290,000+ | 88% | ≤2h | 16% | System, Color, Material, Size, Logo, Packaging, Graphics | Broad: Entry-Level to Heavy-Duty T3650A |
| Guangdong Ruifeng Machinery Co., Ltd. | Guangdong, CN | CNC Lathe, Tool Holder | Not Disclosed | 100% | ≤1h | Not Available | High-Precision Customization Offered | Specialized: Precision Horizontal Lathes |
| Taizhou Luqiao Shiheng Cnc Lathe Co., Ltd. | Zhejiang, CN | CNC Lathe, Machining Centre | Not Disclosed | 100% | ≤1h | Not Available | Standard Industrial Customization | Diverse: Mini CK0632 to Multi-Axis Mill-Turn |
Performance Analysis
Taian Hiscience stands out with the highest online revenue and an exceptional 42% reorder rate, reflecting strong market trust and repeat business. Its broad product range and comprehensive customization capabilities make it suitable for diverse procurement needs. Shenzhen Richon offers a wide model spectrum from compact CNC210 units ($4,900) to heavy-duty T3650A machines ($38,987+), providing scalability for tiered purchasing strategies.
Guangdong Ruifeng and Taizhou Shiheng demonstrate perfect on-time delivery records and sub-one-hour response times, indicating robust internal coordination and customer service discipline. While reorder data is unavailable, their specialization in high-precision horizontal lathes caters to buyers requiring tight tolerances (±0.005mm) and long-term reliability. Changzhou Weizhuo, despite competitive pricing at $11,200–12,200 per unit, shows lower reorder activity (<15%), suggesting potential gaps in after-sales support or machine longevity.
FAQs
How to verify CNC lathe machine supplier reliability?
Cross-check quality certifications (ISO 9001, CE) with official registries. Request factory audit reports or schedule virtual walkthroughs to assess production line organization, inventory management, and testing procedures. Analyze verifiable buyer feedback focusing on machine accuracy retention, spare parts availability, and technical support responsiveness.
What is the typical MOQ and lead time?
Most suppliers list a minimum order quantity of 1 set, facilitating trial purchases. Standard lead times range from 30 to 45 days after deposit confirmation. Express production may reduce this to 20 days for pre-configured models. Complex custom builds require 50–60 days depending on automation integration.
Can suppliers customize CNC control systems and software?
Yes, leading suppliers offer multiple control system options including GSK, Siemens, Fanuc, and Syntec. Custom HMI layouts, PLC programming, and communication protocols (RS232, Ethernet, USB) can be tailored upon request. Confirm firmware version compatibility and provide detailed functional requirements during quotation.
Do manufacturers provide machine testing before shipment?
Reputable suppliers conduct no-load run tests, positioning accuracy verification, and simulated cutting cycles. Some offer remote inspection via live video feed or recorded test footage. Buyers may also appoint third-party inspectors (e.g., SGS, BV) for pre-shipment quality audits under Incoterms DAP or FOB arrangements.
What are common packaging and export practices?
Machines are typically secured in seaworthy wooden crates with anti-rust coating, moisture absorbers, and shock indicators. Export documentation includes packing lists, commercial invoices, and conformity certificates. Most suppliers coordinate container loading and provide CIF/FOB shipping options with freight forwarder recommendations.









