Defrost Timer For Fridge Producer
About defrost timer for fridge producer
Where to Find Defrost Timer for Fridge Producers?
China remains the central hub for defrost timer manufacturing, with key production clusters in Ningbo and Xiamen offering specialized capabilities in refrigeration control components. These regions host vertically integrated suppliers equipped with dedicated production lines for electromechanical timers used in residential and commercial refrigeration systems. The concentration of component manufacturers, precision molding facilities, and logistics networks enables efficient scale-up and rapid order fulfillment.
Suppliers in these industrial zones benefit from established supply chains for critical materials such as thermoplastics, copper contacts, and timing springs, reducing material lead times by 20–30%. Most producers operate under ISO 9001-aligned quality management systems, with a growing number supporting CE and RoHS compliance documentation for export markets. Typical monthly output ranges from 50,000 to over 200,000 units per facility, depending on automation level and product complexity. Buyers gain access to flexible MOQs (as low as 500 pieces), short production cycles (15–25 days), and customization across voltage specifications, mounting configurations, and timing intervals (6–8 hours standard).
How to Choose Defrost Timer for Fridge Producers?
Effective supplier selection requires structured evaluation across three core areas:
Production & Technical Capacity
Confirm ownership of in-house injection molding, gear assembly, and functional testing lines. Suppliers advertising "own production line" should demonstrate control over mold fabrication and motor calibration processes. Prioritize companies with documented R&D capabilities, particularly those offering OEM/ODM services including custom cam design and dual-function integration (defrost + compressor control). Facility size is less critical than process integration—look for evidence of automated burn-in testing and batch traceability.
Quality Assurance & Compliance
While formal ISO certification is not universally listed, verify adherence through performance metrics: 100% on-time delivery rates across multiple suppliers suggest robust internal controls. Request sample test reports covering dielectric strength (≥1,500V AC), contact resistance (≤50mΩ), and operational lifespan (minimum 50,000 cycles). For EU and North American markets, confirm material compliance with RoHS and REACH regulations. Third-party packaging validation (drop testing, humidity exposure) adds assurance for long-distance shipping.
Transaction Reliability & Support
Evaluate responsiveness (≤6 hours preferred) and reorder rate as proxies for customer satisfaction. A reorder rate above 40% indicates strong product reliability and service consistency. Use incremental ordering strategies—start with 500–1,000 unit batches—to validate performance before scaling. Confirm labeling, branding, and multilingual instruction sheet options if distributing under private label. Escrow-based payment terms mitigate financial risk during initial engagements.
What Are the Top Defrost Timer for Fridge Producers?
| Company Name | Location | Main Product Lines | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Ningbo Whicepart Electric Co., Ltd. | Ningbo, CN | Laundry Appliance Parts (1196), Refrigerator & Freezer Parts (359) | US $300,000+ | 100% | ≤2h | 16% | 500 pcs | $1.50–2.50 |
| Xiamen Bestyn Import & Export Co., Ltd. | Xiamen, CN | Customization-focused refrigeration parts | US $20,000+ | 100% | ≤4h | <15% | 1000 pcs | $0.60–2.50 |
| Xiamen Sino-Cool Refrigeration Parts Industry Co., Ltd. | Xiamen, CN | Sino-Cool branded TMDC/TMDF series | US $1,400,000+ | 100% | ≤6h | 40% | 500 pcs | $1.60–2.50 |
| Ningbo Moco Home Appliance Co., Ltd. | Ningbo, CN | High-volume mechanical timer production | US $1,000+ | 100% | ≤11h | - | 500 pcs | $1.20–2.50 |
| Ningbo Dyd Import & Export Co., Ltd. | Ningbo, CN | Replacement models (WR9X502, WR9X483) | US $380,000+ | 100% | ≤6h | 41% | 500 pcs | $1.50–2.80 |
Performance Analysis
Xiamen Sino-Cool and Ningbo Dyd stand out with reorder rates of 40% and 41%, indicating high end-user satisfaction and consistent quality execution. Both support MOQs of 500 units and offer pricing within the $1.60–$2.80 range, balancing cost efficiency with technical reliability. Ningbo Whicepart leads in responsiveness (≤2h) and diversified appliance part offerings, making it suitable for buyers managing multi-component procurement. Xiamen Bestyn offers the lowest price point at $0.60/unit but requires 1,000-piece minimums and shows lower repeat order activity. Ningbo Moco presents competitive pricing from $1.20 yet lacks reorder data and exhibits slower response times, suggesting potential service limitations.
FAQs
What materials are used in defrost timer construction?
Common materials include ABS or PC for housing, brass or copper for electrical contacts, and spring steel for the timing mechanism. Some models integrate nylon gears for quiet operation. Material certifications (e.g., UL94 V-0 for flammability) should be available upon request.
What is the standard lead time for production orders?
Standard lead time ranges from 15 to 25 days after confirmation of specifications and deposit. Expedited production (10–14 days) may be available for urgent orders at an additional cost.
Can suppliers customize defrost timer specifications?
Yes, most listed suppliers offer customization in timing cycle (6–12 hours), voltage (120V/220V), terminal type, mounting bracket design, and branding. Minimum order quantities for custom designs typically start at 1,000 units unless otherwise negotiated.
Do producers provide samples?
Sample availability is common. Suppliers usually charge a nominal fee (refundable against future orders) and require shipping payment. Sample lead time averages 7–10 days. Buyers are advised to conduct functional testing under simulated load conditions before bulk procurement.
What are typical payment terms?
Standard terms include 30% advance payment via T/T, with balance due before shipment. Letters of Credit (L/C) are accepted by larger suppliers. New buyers may be required to pay full amount upfront for small trial orders.









