Digikey Raspberry Pi
CN
About digikey raspberry pi
Where to Find Raspberry Pi and Single-Board Computer Suppliers?
China remains a central hub for single-board computer (SBC) manufacturing and distribution, with key suppliers concentrated in Shenzhen, Guangdong—a globally recognized center for electronics innovation and supply chain integration. The region hosts vertically integrated networks of component manufacturers, PCB fabricators, and assembly facilities, enabling rapid prototyping and scalable production. This ecosystem supports efficient sourcing of Raspberry Pi-compatible development boards and related electronic modules, with logistics advantages due to proximity to major ports and air freight hubs.
Suppliers in this cluster specialize in both original and compatible SBCs, offering access to mature technical support infrastructure and just-in-time inventory models. Buyers benefit from localized procurement cycles, reduced shipping lead times (typically 7–15 days via express), and competitive pricing driven by high supplier density. Economies of scale allow for flexible order volumes, from single-unit samples to bulk shipments exceeding 100 pieces, with many suppliers maintaining ready stock of popular models such as Raspberry Pi 4 Model B and Raspberry Pi 5 variants.
How to Choose Raspberry Pi and SBC Suppliers?
Effective supplier selection requires rigorous evaluation across three core dimensions:
Technical Accuracy and Product Authenticity
Verify whether listings refer to genuine Raspberry Pi Foundation products or functionally compatible alternatives. Confirm product specifications against official Raspberry Pi documentation, including SoC type (e.g., Broadcom BCM2711), RAM configuration, and GPIO layout. For development kits, assess included peripherals—such as power supplies, cases, and cooling solutions—for compatibility and quality consistency.
Operational Performance Metrics
Evaluate supplier reliability using quantifiable indicators:
- On-time delivery rate ≥95% indicates consistent logistics execution
- Average response time ≤4 hours reflects strong customer engagement capacity
- Reorder rate below 20% may suggest niche specialization or limited repeat demand, whereas higher rates could indicate broader market acceptance
- Minimum order quantities (MOQs) typically range from 1 to 100 units, with lower MOQs favoring prototyping and testing phases
Cross-reference platform-reported data with transaction history where available, particularly for volume procurement.
Transaction Security and Quality Assurance
Prioritize suppliers offering third-party transaction protection mechanisms. Request sample units to validate board build quality, thermal performance, and firmware compatibility. For integration into commercial systems, confirm compliance with relevant standards such as RoHS and CE, especially when targeting EU or North American markets. Inquire about after-sales technical support availability and warranty terms.
What Are the Leading Raspberry Pi and SBC Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|
| Shenzhen Dalu Electronics Co., Ltd. | Development Boards, Camera Modules, OLED Modules | US $110,000+ | 95% | ≤7h | <15% | 1 unit/box | $45–157 |
| Shenzhen Xingdejin Electronics Co., Ltd. | Development Boards, Microcontrollers, FPGAs | US $4,000+ | 100% | ≤1h | <15% | 1–2 pieces | $55.50–168.69 |
| Shenzhen Ai-Ksen Technology Co., Ltd. | Development Boards, FPGA, DC-DC Converters | US $50,000+ | 100% | ≤4h | <15% | 1 piece | $35.89–105.24 |
| Shenzhen Shchv Technology Co., Ltd. | Development Boards, Sensor Tools, LCD Modules | US $140,000+ | 100% | ≤7h | 16% | 1 piece | $65.40–180.67 |
| Shenzhen All True Tech Electronic Co., Ltd. | Motherboards, RAM, Development Modules | US $10,000+ | 90% | ≤3h | 20% | 10–100 pieces | $12.25–260 |
Performance Analysis
Shenzhen Xingdejin and Shenzhen Ai-Ksen demonstrate optimal delivery reliability (100% on-time), with sub-4-hour average response times, making them suitable for time-sensitive procurement. Shenzhen Shchv leads in online sales volume (US $140,000+), suggesting robust market penetration and operational stability. Shenzhen Dalu offers the broadest price range ($45–157), accommodating diverse budget requirements across Raspberry Pi 4 and Pi 5 models. Notably, Shenzhen All True Tech targets bulk buyers with significantly lower per-unit pricing but enforces high MOQs (10–100 pieces), ideal for OEM integrators. While none explicitly state ISO or RoHS certifications in available data, their presence in compliant marketplaces suggests adherence to baseline regulatory frameworks.
FAQs
How to verify Raspberry Pi supplier authenticity?
Distinguish between authorized distributors and third-party resellers by reviewing product descriptions for trademarks and original branding. Request batch numbers or purchase invoices for traceability. Test received units for pre-installed software integrity and hardware identification codes matching Raspberry Pi Foundation specifications.
What is the typical lead time for SBC orders?
In-stock units ship within 1–3 business days. Custom kits or out-of-stock models may require 7–14 days for preparation. International delivery adds 5–12 days depending on shipping method. Expedited options are widely available.
Can suppliers provide Raspberry Pi development kits?
Yes, multiple suppliers offer bundled kits including power adapters, microSD cards, heatsinks, and cases. Pricing varies based on accessory quality and completeness. Confirm kit contents explicitly before ordering to ensure compatibility.
Are samples available for testing?
Most suppliers allow single-unit purchases, effectively serving as samples. Unit pricing applies, but these can be used for functional validation, software development, and design integration testing prior to larger orders.
Is customization supported for SBC-based projects?
Limited customization—such as pre-flashed OS images, labeling, or bundling—is offered by select suppliers. Full hardware modifications require engagement with ODM partners. Confirm technical feasibility and minimum volume requirements directly with the supplier.









