Format Factory 3.6
About format factory 3.6
Where to Find Format Factory 3.6 Production Line Suppliers?
China remains the global hub for industrial production line manufacturing, with key suppliers of Format Factory 3.6 systems concentrated in Jiangsu and Liaoning provinces. Suzhou and Zhangjiagang in Jiangsu host advanced extrusion and automation engineering clusters, offering vertically integrated facilities that streamline component sourcing and final assembly. Shenyang in Liaoning specializes in high-precision digital fabrication equipment, particularly for large-format output applications in signage and advertising industries.
These regional ecosystems enable efficient coordination between material feed systems, extrusion units, and downstream processing modules. Suppliers benefit from localized access to CNC machining services, electrical control system integrators, and polymer processing expertise, reducing lead times for both standard and customized configurations. Buyers can expect typical delivery windows of 30–45 days for fully assembled lines, with cost advantages of 20–35% compared to European or North American manufacturers due to lower labor and overhead expenses.
How to Choose Format Factory 3.6 Production Line Suppliers?
Selecting a reliable supplier requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical Compliance & System Integration
Verify compatibility with required materials such as ABS, PLA, PETG, PVC, HDPE, and PP. Confirm nozzle diameter options (typically 1.75mm or 3.0mm), extruder configuration (single/dual), and filament accuracy tolerance (±0.02mm is industry standard). For automated setups, ensure integration capabilities with upstream crushers, dryers, and downstream spooling or labeling systems.
Production Capability Verification
Assess infrastructure through available data points:
- Minimum facility size supporting full-line assembly (suppliers with ≥500m² operations demonstrate scalability)
- In-house R&D capacity indicated by customization offerings (e.g., adjustable width, color mixing, vertical tower design)
- Own production lines versus trading models—prioritize companies listing multiple machine types under consistent branding
Cross-reference on-time delivery performance (target ≥95%) and response time (≤8 hours preferred) as indicators of operational reliability.
Transaction Safeguards & Quality Assurance
Require documented quality management processes, preferably ISO 9001 certification. While not always explicitly stated, CE marking should be confirmed for electrical panels and motion components to meet international safety standards. Utilize secure payment mechanisms such as escrow services until site acceptance testing is completed. Request sample production runs—either physical units or video demonstrations—to validate output consistency and system stability before full deployment.
What Are the Best Format Factory 3.6 Production Line Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Key Product Range |
|---|---|---|---|---|---|---|---|---|
| Suzhou Acc Machinery Co., Ltd. | Jiangsu, CN | Plastic Extruders, Auxiliary Machines | US $270,000+ | 66% | ≤10h | 40% | Yes | Fully Automated 1.5kg/h 3D Filament Line ($8,900/set) |
| Zhangjiagang Beierman Machinery Co., Ltd. | Jiangsu, CN | Plastic Extruders (3,643), Processing Lines | US $400+ | 100% | ≤4h | - | No | PVC Pipe Line ($210,000/set), HDPE 3-Layer Pipe Line ($15,500/set) |
| Shenyang Kawalong Science Tec. Co., Ltd. | Liaoning, CN | Large-Format Printing Systems | US $50,000+ | 100% | ≤3h | 50% | Yes | Eco-Friendly Large Format Printer ($1,499/set) |
| Zhengzhou Duoyuan Intelligent Equipment Co., Ltd. | Henan, CN | Assembly Lines, Metal Processing | - | 100% | ≤8h | - | No | Tyre Making Machine ($45K–50K/set), Car/Bus Assembly Lines |
| Suzhou Poks Machinery Co., Ltd. | Jiangsu, CN | Extruders, Crushers, Granulators | - | 100% | ≤2h | - | Yes | ABS/PLA 3D Filament Lines ($14.5K–20K/set), PVC Electric Conduit Line ($2.8K/set) |
Performance Analysis
Zhangjiagang Beierman and Suzhou Poks demonstrate strong technical specialization in plastic extrusion systems, supported by extensive product portfolios and fast response times (≤4h). Shenyang Kawalong stands out with a 50% reorder rate, indicating high customer satisfaction in niche large-format printing solutions. Suzhou Acc offers mid-range pricing but has a notably lower on-time delivery rate (66%), suggesting potential fulfillment risks. Zhengzhou Duoyuan focuses on broader industrial automation, positioning it better for integrated factory layouts than dedicated filament production. Buyers seeking customization should prioritize Suzhou Acc and Suzhou Poks, which explicitly list variable parameters such as material type, nozzle diameter, and feedback controls.
FAQs
How to verify Format Factory 3.6 supplier reliability?
Validate company legitimacy through business registration documents and cross-check export history. Request references from past buyers, especially in your target region. Review response consistency and technical depth in communications as proxies for post-sale support capability.
What is the typical MOQ and lead time?
Minimum order quantity is typically 1 set. Lead times range from 20–45 days depending on complexity, with additional 10–20 days for sea freight to most international ports. Air shipping is rarely viable due to equipment weight and dimensions.
Can suppliers customize filament production lines?
Yes, select manufacturers offer adjustments in extrusion speed, screw design, cooling system layout, spooling mechanism, and control interface. Customization may extend lead time by 10–15 days and increase costs by 15–25%, depending on scope.
Do suppliers provide installation and training?
Most offer remote guidance via video or manuals. On-site commissioning and operator training are typically available at an additional cost (e.g., $150–$200/day plus travel). Confirm availability before purchase, especially for first-time users.
What certifications should I look for?
While formal ISO or CE documentation may not always be provided, insist on evidence of internal quality checks, electrical safety compliance, and motor/controller specifications. For regulated markets, require CE-marked components and conformity declarations.









