Fully Automatic Poha Making Machine Price
About fully automatic poha making machine price
Where to Find Fully Automatic Poha Making Machine Suppliers?
China remains the dominant manufacturing hub for fully automatic poha making machines, with key supplier clusters located in Shandong, Henan, and Anhui provinces. These regions host integrated food processing machinery ecosystems supported by mature stainless steel fabrication networks, precision engineering workshops, and automated assembly lines. Shandong specializes in industrial-scale extrusion-based systems, while Henan focuses on multi-functional snack processing lines adaptable to poha production. Anhui has emerged as a center for cost-optimized, compact automation solutions tailored for small to mid-sized food enterprises.
Suppliers in these zones benefit from localized supply chains that reduce component procurement time by 20–30% and enable rapid prototyping. Average factory footprints range from 500 to over 24,000 m², facilitating both batch production and custom engineering. Buyers can expect lead times of 30–60 days for standard configurations, with scalability for high-volume orders due to vertically integrated manufacturing capabilities. The regional infrastructure supports efficient export logistics, particularly via Qingdao, Tianjin, and Shanghai ports, ensuring compliance with international shipping standards.
How to Choose Fully Automatic Poha Making Machine Suppliers?
Procurement decisions should be guided by structured evaluation criteria to ensure technical compatibility, production reliability, and transaction security.
Technical Specifications & Compliance
Verify machine design aligns with intended output capacity (typically 100–150 kg/h for mid-range models). Confirm construction materials are food-grade stainless steel (minimum SS304) compliant with FDA and EU food safety regulations. While explicit ISO or CE certifications are not uniformly declared in available data, prioritize suppliers who provide test reports for motor efficiency, temperature control systems, and hygiene standards. Machines must support continuous operation under industrial conditions without thermal overload.
Production Capacity Assessment
Evaluate supplier infrastructure through measurable indicators:
- Facility size exceeding 5,000 m² indicates scalability for bulk orders
- In-house R&D teams suggest capability for customization (e.g., thickness control, dehydration settings)
- Integration of CNC machining and welding processes ensures consistent build quality
Cross-reference claimed output rates (e.g., 150 kg/h) with verified order histories and client feedback where available.
Transaction Risk Mitigation
Utilize secure payment mechanisms such as escrow services to release funds only after equipment verification. Analyze response time metrics—suppliers answering within ≤2 hours demonstrate operational responsiveness. On-time delivery rates above 97% correlate with reliable production planning. Request sample units to validate performance, focusing on sheet uniformity, drying consistency, and ease of cleaning.
What Are the Best Fully Automatic Poha Making Machine Suppliers?
| Company Name | Location | Main Products | Price Range (USD) | Min. Order | On-Time Delivery | Avg. Response | Online Revenue | Reorder Rate |
|---|---|---|---|---|---|---|---|---|
| YANN TECHNOLOGY LLC | China | Grain Product Making Machines, Multi-Function Packaging Machines | $900–8,000 | 1 set | Data not available | ≤1h | Data not available | Data not available |
| Henan Reliable Industrial Co., Ltd. | Henan, CN | Potato Chips Making Machine, Food Processing Lines | $8,000–85,000 | 1 set | 75% | ≤5h | US $20,000+ | 50% |
| Shandong Aida Machinery Co., Ltd. | Shandong, CN | Grain Product Making Machines, Food Processing Lines | $14,800–18,700 | 1 set | 100% | ≤2h | US $40,000+ | <15% |
| Anhui Jinke Foodstuff Machinery Co., Ltd. | Anhui, CN | Food Processing Lines, Grain Product Making Machines | $3,611–50,000 | 1 set | 100% | ≤17h | US $7,000+ | <15% |
| TGMACHINE INC | China | Candy Machine, Bubble Tea & Pancake Equipment | $25,000–50,000 | 1 set | Data not available | ≤4h | Data not available | Data not available |
Performance Analysis
Shandong Aida Machinery and Henan Reliable Industrial exhibit strong operational discipline, with 100% and 75% on-time delivery rates respectively. Shandong Aida stands out for fast response times (≤2h) and higher online transaction volume (US $40,000+), indicating active export engagement. Henan Reliable offers competitive pricing flexibility and a 50% reorder rate, suggesting customer satisfaction in specific market segments. Anhui Jinke provides a broad price range, including an entry-level model at $3,611, making it suitable for budget-conscious buyers despite slower response cycles. YANN TECHNOLOGY’s sub-1-hour response time reflects high service readiness, though transparency on delivery performance is limited. TGMACHINE INC targets premium industrial lines but lacks verifiable transaction metrics.
FAQs
How to verify fully automatic poha making machine supplier reliability?
Request documentation on material specifications, electrical system compliance, and safety features. Conduct virtual audits to assess factory operations. Validate claims through third-party inspection services like SGS or Bureau Veritas prior to shipment. Review transaction history for consistency in order fulfillment and post-sale communication.
What is the average lead time for poha machine production?
Standard units typically require 30–45 days for manufacturing and testing. Customized systems with specialized drying or stacking modules may extend to 60 days. Air freight adds 5–10 days for international delivery, while sea freight ranges from 20–40 days depending on destination port.
Can suppliers customize poha making machines for specific requirements?
Yes, most manufacturers offer modifications in output capacity, voltage (220V/380V), control panel language, and footprint dimensions. Advanced customization includes integration with feeding hoppers, packaging conveyors, or IoT-enabled monitoring systems. Technical drawings and prototypes are usually provided within 7–14 days after specification submission.
Do suppliers provide installation and training support?
Support varies by supplier. Some include remote video guidance or written manuals, while others offer on-site technician deployment at additional cost. Clarify training scope and warranty terms (typically 12 months) before finalizing contracts.
What are typical payment terms for international procurement?
Common structures include 30% advance payment via T/T, with the balance due before shipment. Letters of Credit (L/C) are accepted by larger exporters. Escrow services are recommended for first-time transactions to mitigate non-delivery risks.









