Hdmi Rf Modulator
About hdmi rf modulator
Where to Find HDMI RF Modulator Suppliers?
China remains the central hub for HDMI RF modulator manufacturing, with key production clusters concentrated in Shenzhen, Changsha, and Hangzhou. These regions host specialized electronics manufacturers equipped with integrated R&D and assembly capabilities, enabling rapid prototyping and scalable output. Shenzhen stands out as a leading export center due to its proximity to major ports and dense network of component suppliers, reducing material lead times by up to 25%. Changsha and Hangzhou-based firms leverage established expertise in broadcast equipment to deliver high-compliance solutions tailored for CATV, IPTV, and ISDB-T applications.
Suppliers in these zones operate within vertically aligned supply chains, supporting full-cycle production from PCB design to final testing. This integration allows for cost efficiencies—unit prices as low as $72 for basic single-channel models—and flexibility in configuration. Average monthly production capacity among verified suppliers ranges from 1,000 to 5,000 units, with some offering batch customization for channel count (4–24 channels), output frequency (agile or fixed), and input interface combinations. Buyers benefit from localized access to HDMI ICs, RF amplifiers, and metal enclosures, contributing to stable pricing and shorter fulfillment cycles (typically 15–25 days post-payment).
How to Choose HDMI RF Modulator Suppliers?
Procurement decisions should be guided by technical capability, quality assurance practices, and transaction reliability:
Technical Compliance
Verify adherence to international broadcasting standards such as DVB-T, ISDB-T, or ATSC depending on target market. CE, RoHS, and FCC certifications are essential for regulatory clearance in Europe and North America. Request test reports for signal integrity, harmonic distortion, and thermal stability under continuous operation.
Production Capability Audits
Assess supplier infrastructure using the following benchmarks:
- Minimum 1,000m² factory area with dedicated SMT and aging test lines
- In-house engineering team capable of firmware customization and frequency tuning
- Support for HDMI 1.4/2.0, H.264/H.265 encoding, and multi-channel aggregation
Cross-reference declared capabilities with product listings and reorder rates (target >25%) to gauge customer satisfaction and scalability.
Transaction Safeguards
Prioritize suppliers with documented on-time delivery performance (≥98%) and response times under 4 hours. Utilize secure payment methods with milestone verification, especially for custom-built units. Conduct pre-shipment inspections to validate output specifications, particularly modulation accuracy and RF output level consistency across all channels.
What Are the Best HDMI RF Modulator Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Yukuan Technology Ltd. | Guangdong, CN | Radio & TV Broadcasting Equipment, Fiber Optic Equipment | US $100,000+ | 100% | ≤2h | 50% | 1 set | $798–$2,860 |
| Changsha Tuoying Technology Co., Ltd. | Hunan, CN | Radio & TV Broadcasting Equipment, Video Splitters & Converters | US $90,000+ | 98% | ≤3h | 28% | 1 piece | $153–$1,100 |
| Hangzhou Softel Optic Co., Ltd. | Zhejiang, CN | Customization options: color, packaging, labeling, RF output | US $100,000+ | 87% | ≤4h | 15% | 1 piece | $590–$1,599 |
| Dexin Digital Technology Corp. Ltd. (Chengdu) | Sichuan, CN | Radio & TV Broadcasting Equipment, Set-top Box | US $50,000+ | 100% | ≤11h | 25% | 1 set/piece | $300–$1,600 |
| Good Mind Electronics (Shenzhen) Co., Ltd. | Guangdong, CN | Customization options: inputs, outputs, logo, packaging | US $2,000+ | 85% | ≤2h | <15% | 60–100 pieces | $72–$140 |
Performance Analysis
Yukuan Technology leads in reliability with a 100% on-time delivery rate and the highest reorder rate (50%), indicating strong client retention, though at higher price points. Changsha Tuoying offers balanced value with competitive pricing and broad product variety, including economical 4- and 8-channel models. Hangzhou Softel specializes in OEM/ODM services, supporting extensive hardware and branding customization suitable for private-label deployments. Dexin Digital provides mid-range solutions with support for advanced codecs like H.265, ideal for modern digital broadcasting upgrades. Good Mind Electronics delivers the lowest unit costs but requires larger MOQs (60–100 pieces), making it best suited for bulk buyers focused on cost optimization.
FAQs
How to verify HDMI RF modulator supplier reliability?
Cross-check compliance claims (CE, RoHS) with available documentation. Evaluate supplier credibility through confirmed transaction history, response consistency, and customer feedback on delivery accuracy and technical support. For high-volume contracts, request factory audit reports or video tours of production and testing areas.
What is the typical sampling timeline?
Standard sample production takes 7–14 days. Custom configurations involving specific frequency plans or firmware adjustments may require 20–30 days. Air shipping adds 5–10 business days depending on destination.
Can suppliers ship HDMI RF modulators worldwide?
Yes, most suppliers offer global logistics via express, air, or sea freight. Confirm Incoterms (FOB, CIF) during negotiation and ensure packaging meets international electrostatic discharge (ESD) protection standards. Export documentation typically includes commercial invoice, packing list, and bill of lading.
Do manufacturers provide free samples?
Free samples are uncommon; most suppliers charge full or partial fees. Sample costs are often credited toward future orders exceeding 50–100 units. Negotiate sample terms early to reduce upfront expenses.
How to initiate customization requests?
Submit detailed requirements including channel count, output frequency range (e.g., 470–862 MHz), modulation standard (QAM, COFDM), input types (HDMI, SDI), and physical specifications (rack-mountable, wall-mount). Reputable suppliers will respond with technical proposals and estimated timelines within 48 hours.









