Ice Machine Devanti
About ice machine devanti
Where to Find Ice Machine Suppliers?
China remains the global hub for commercial and residential ice machine manufacturing, with key production clusters in Guangdong, Hebei, Jiangsu, and Henan provinces. These regions host vertically integrated supply chains encompassing refrigeration engineering, stainless steel fabrication, and automated assembly systems. Guangzhou and Suzhou specialize in high-efficiency freestanding units with front ventilation designs, while Shijiazhuang and Zhengzhou focus on large-capacity commercial models ranging from 60kg to over 1,200kg daily output.
The industrial ecosystems support rapid prototyping and scalable production, enabling suppliers to fulfill both small test orders and container-sized shipments within standardized lead times. Proximity to raw material sources—particularly 304 stainless steel and rotary compressors—reduces component costs by 15–25% compared to non-specialized markets. Buyers benefit from consolidated logistics networks that facilitate FOB terms from major ports like Guangzhou Nansha and Qingdao, with typical air freight sampling windows of 7–10 days and sea freight transit times of 20–35 days depending on destination.
How to Choose Ice Machine Suppliers?
Selecting reliable partners requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Compliance & Design Expertise
Verify adherence to international safety and performance standards such as CE, RoHS, and UL where applicable. For commercial buyers, confirm compressor type (rotary or scroll), condenser configuration (air-cooled or water-cooled), and energy efficiency ratings (kWh/100kg ice). Request detailed CAD drawings and refrigerant specifications (commonly R-134a or R-404A) to ensure compatibility with local regulations.
Production Capability Verification
Assess supplier infrastructure using the following benchmarks:
- Minimum factory area of 3,000m² for sustained volume output
- In-house capabilities in sheet metal forming, welding, foam insulation injection, and final assembly
- Dedicated quality control stations conducting leak testing, electrical safety checks, and ice cycle validation
Cross-reference claimed production capacity with actual online revenue data and reorder rates to gauge market acceptance and fulfillment reliability.
Transaction Safeguards and After-Sales Support
Prioritize suppliers offering third-party trade assurance programs and escrow payment options. Evaluate responsiveness through average reply time (sub-4 hours is competitive) and language proficiency. Confirm availability of spare parts inventory and technical documentation in English or target market languages. Pre-shipment inspection rights and post-delivery warranty terms (typically 12 months) should be contractually defined.
What Are the Best Ice Machine Suppliers?
| Company Name | Location | Main Products | Customization Options | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue | Min. Order (MOQ) |
|---|---|---|---|---|---|---|---|---|
| Guangzhou Universal Venture Holding Co., Ltd. | Guangdong, CN | Ice Machines, Refrigeration Equipment, Snack Machines | Not specified | 100% | ≤7h | 33% | US $190,000+ | 1 piece/set |
| Shijiazhuang Daina Machinery Commerce Co., Ltd. | Hebei, CN | Commercial Cube & Snowflake Ice Makers | Color, material, size, logo, packaging | 100% | ≤2h | 22% | US $360,000+ | 1 set |
| Suzhou Seitek Co., Ltd. | Jiangsu, CN | Freestanding, Front-Ventilation, OEM Models | Color, material, size, logo, packaging | 100% | ≤20h | - | - | 48–170 sets/pieces |
| Henan Qianying Machinery Co., Ltd. | Henan, CN | Professional Commercial Ice Machinery | Color, material, size, logo, packaging | 96% | ≤2h | 22% | US $970,000+ | 1 set/carton |
| Changzhou Vanace Environmental Technology Co., Ltd. | Jiangsu, CN | Countertop, Vending, Mini Ice Makers | Color, design, freezer size, logo, packaging | 100% | ≤1h | <15% | US $140,000+ | 1–5 pieces |
Performance Analysis
Guangzhou Universal Venture and Shijiazhuang Daina demonstrate strong delivery consistency (100% on-time rate) and moderate reorder volumes, indicating stable customer satisfaction. Changzhou Vanace leads in responsiveness (≤1h average reply), making it ideal for urgent procurement cycles, though its lower reorder rate suggests room for improvement in long-term client retention. Suzhou Seitek targets bulk OEM clients with high MOQs (up to 170 pieces), reflecting a focus on private-label contracts rather than spot buyers. Henan Qianying stands out with the highest verified revenue (US $970,000+), diversified product range, and flexible ordering options, supporting both retail and wholesale strategies. Suppliers in Hebei and Henan exhibit faster response times, with 80% replying within 2 hours, enhancing communication efficiency for international buyers.
FAQs
How to verify ice machine supplier reliability?
Cross-check certifications (CE, RoHS) with official databases and request test reports for noise levels (dB), power consumption, and ice production consistency under varying ambient temperatures. Analyze transaction history, including repeat order rates and dispute resolution records. Conduct virtual factory audits to observe production lines and quality checkpoints.
What is the typical MOQ and pricing range?
Standard units start at 1 set (MOQ: 1 piece) for ready-to-ship models, particularly among Guangdong and Hebei suppliers. OEM-focused manufacturers require higher volumes—typically 48 to 170 units per order. Price ranges vary from $120 for compact countertop units to $1,390 for specialized dry ice machines, with mid-range commercial models averaging $260–$700 per set.
Can suppliers customize ice machine designs?
Yes, most suppliers offer customization in color finish, cabinet dimensions, logo branding, packaging, and internal components. Some provide full OEM services including mold development and user interface modifications. Lead time may extend by 10–20 days for custom configurations, especially those involving structural changes or unique refrigerant setups.
What are standard lead times and shipping options?
Production lead time averages 15–25 days for standard orders after deposit confirmation. Air freight delivers samples within 7–10 days globally; full container loads via sea freight take 20–35 days depending on port of discharge. FOB terms are standard, but suppliers often coordinate CIF arrangements upon request.
Do suppliers provide warranties and technical support?
Most offer a 12-month warranty covering compressor and critical electrical components. Support typically includes installation manuals, troubleshooting guides, and remote assistance. Some suppliers stock key spare parts (e.g., evaporator plates, water pumps) and may dispatch technicians for large-scale installations upon agreement.









