Ice Maker Machine For Home
About ice maker machine for home
Where to Find Ice Maker Machine Suppliers for Home Use?
China remains the dominant hub for manufacturing compact and portable ice maker machines, with key production clusters concentrated in Guangdong and Zhejiang provinces. Shenzhen and Ningbo serve as primary industrial centers, hosting vertically integrated supply chains that specialize in small home appliances. These regions benefit from mature ecosystems of plastic injection molding, compressor sourcing, and electronic control module production, enabling cost efficiencies of 20–30% compared to non-Asian manufacturers.
Suppliers in these zones operate high-efficiency assembly lines capable of producing between 10,000 to 50,000 units monthly, depending on model complexity. The proximity of component suppliers—such as evaporator coil fabricators and food-grade water pump manufacturers—within a 50km radius reduces lead times and supports just-in-time inventory models. Buyers gain access to rapid prototyping, scalable batch production, and streamlined logistics via nearby ports like Shekou and Ningbo-Zhoushan, which facilitate global containerized shipping.
How to Choose Ice Maker Machine Suppliers for Home Applications?
Procurement decisions should be guided by systematic evaluation criteria to ensure product quality, compliance, and supply chain reliability.
Quality & Compliance Verification
Prioritize suppliers offering CE and UL certifications, particularly for export to European and North American markets. These indicate adherence to electrical safety, electromagnetic compatibility, and food-contact material standards. Validate certification authenticity through official databases or third-party inspection reports. RoHS compliance is essential for restricting hazardous substances in consumer electronics.
Production & Customization Capacity
Assess technical infrastructure based on the following benchmarks:
- Minimum factory area of 2,000m² for sustained volume output
- In-house capabilities in mold design, injection molding, and final assembly
- Dedicated R&D teams supporting firmware integration (e.g., smart sensor controls)
- Customization options including color variants, logo printing, packaging design, and capacity adjustments (0.8L–1.5L bins typical)
Cross-reference supplier claims with verified metrics such as on-time delivery rates (target ≥97%) and reorder frequency to gauge operational consistency.
Transaction Security & Order Terms
Utilize secure payment mechanisms such as Alibaba Trade Assurance or third-party escrow services until shipment verification. Analyze minimum order quantities (MOQs), which range from 10 to 1,000 pieces depending on model and supplier policy. Standard lead times average 25–35 days post-deposit, with air freight samples deliverable within 7–10 days. Request pre-shipment inspections (PSI) through independent agencies like SGS or TÜV to validate unit functionality and build quality.
What Are the Top Ice Maker Machine Suppliers for Home Use?
| Company Name | Location | Verified Status | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Ningbo Konwin Electrical Appliance Co.,ltd. | Ningbo, CN | Custom Manufacturer | US $2,000,000+ | 100.0% | ≤3h | 33% | 500–1,000 pcs | $28–66 |
| Ningbo Yingyi International Trade Co., Ltd. | Ningbo, CN | Multispecialty Supplier | US $210,000+ | 100.0% | ≤2h | 27% | 100 pcs | $35–126 |
| Shenzhen Aurotech Technology Co., Ltd. | Shenzhen, CN | - | US $130,000+ | 100.0% | ≤2h | 15% | 10–500 pcs | $37.50–97 |
| Shenzhen Jiuxiang Electric Appliance Co., Ltd. | Shenzhen, CN | Multispecialty Supplier | US $120,000+ | 97% | ≤4h | <15% | 1–100 pcs | $40–52.80 |
| Nanning Nanyuanfang Refrigeration Equipment Co., Ltd. | Nanning, CN | Multispecialty Supplier | US $740,000+ | 99% | ≤5h | 15% | 1–500 pcs | $107–160 |
Performance Analysis
Ningbo Konwin stands out with the highest online revenue and a robust 33% reorder rate, indicating strong market acceptance and reliable fulfillment. Its lower price point ($28–29 for bulk orders) reflects economies of scale and direct manufacturing control. Ningbo Yingyi offers flexibility with a wide product range and customization support, backed by consistent 100% on-time delivery. Shenzhen-based suppliers provide low MOQs (as low as 10 pieces), making them suitable for niche branding or trial orders, though their smaller scale correlates with lower reorder rates. Nanning Nanyuanfang caters to premium segments with higher-capacity models, reflected in elevated pricing and advanced features such as dual compressors and automatic cleaning systems.
FAQs
How to verify ice maker machine supplier reliability?
Confirm certifications (CE, UL, RoHS) through issuing bodies and request test reports for electrical insulation, temperature performance, and water contact materials. Review transaction history via platform-backed assurance programs and analyze customer feedback focused on defect rates and after-sales responsiveness.
What is the typical sampling timeline?
Standard sample production takes 7–15 days, with express air shipping adding 5–10 days globally. Customized units with branded elements may require up to 21 days for tooling adjustments and validation.
Can suppliers ship internationally?
Yes, most suppliers offer FOB, CIF, or DDP shipping terms. Confirm Incoterms alignment with your logistics strategy and verify compliance with destination-country import regulations for household electrical appliances.
Do suppliers offer free samples?
Sample fees are typically charged but may be waived upon confirmation of large-volume orders (usually >500 units). Sample costs generally cover 40–60% of unit production expenses and are non-refundable unless defects are proven.
How to initiate customization requests?
Submit detailed specifications including desired bin capacity, ice cube size (bullet vs. cube), control panel interface (mechanical/digital), and branding requirements. Leading suppliers provide CAD drawings and functional prototypes within 5–7 business days for approval prior to mass production.










