Ice Maker That Makes Nugget Ice
CN
About ice maker that makes nugget ice
Where to Find Ice Maker That Makes Nugget Ice Suppliers?
China remains the dominant hub for manufacturing ice makers that produce nugget ice, with key industrial clusters concentrated in Guangdong and Zhejiang provinces. Shenzhen in Guangdong serves as a high-tech manufacturing center, hosting suppliers specializing in consumer-grade countertop units with smart features and compact designs. Meanwhile, Ningbo and Nanning in Zhejiang and Guangxi respectively focus on commercial and industrial-scale production, offering higher capacity models ranging from 30 to over 500 kg per day.
These regions benefit from vertically integrated supply chains—encompassing compressor fabrication, refrigeration system assembly, and plastic molding—allowing for reduced component lead times and cost-efficient scaling. The proximity of tier-1 suppliers enables faster prototyping and order fulfillment, with standard production cycles averaging 25–35 days. Buyers gain access to flexible output options, from small-batch desktop units (10–20 kg/day) to fully automated commercial systems (200+ kg/day), supported by localized engineering teams capable of rapid design adjustments.
How to Choose Ice Maker That Makes Nugget Ice Suppliers?
Effective supplier selection requires adherence to structured evaluation criteria:
Technical Specifications & Compliance
Verify compliance with international safety and environmental standards such as CE, RoHS, and UL where applicable. For export markets, ensure electrical configurations match regional voltage and plug requirements. Request documentation on refrigerant type (e.g., R600a, R134a), cooling efficiency, and noise levels (typically 40–50 dB for residential models).
Production and Customization Capability
Assess supplier infrastructure based on the following benchmarks:
- Minimum monthly output capacity exceeding 5,000 units for volume orders
- In-house tooling and mold development for customized housing, size, or branding
- Available customization parameters: color, logo printing, packaging, water intake configuration, and control panel interface
Cross-reference customization claims with actual product listings and available OEM/ODM service tags.
Transaction Reliability Metrics
Prioritize suppliers demonstrating consistent performance through verifiable metrics: on-time delivery rates ≥99%, response times under 12 hours, and reorder rates indicating customer retention. Utilize transaction assurance mechanisms such as escrow payments and pre-shipment inspections. Sample testing is critical—evaluate ice formation speed, texture consistency, bin capacity, and energy consumption before placing bulk orders.
What Are the Best Ice Maker That Makes Nugget Ice Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Quantity | Price Range (USD) | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Bway Tech Co., Ltd. | Guangdong, CN | US $900+ | 100% | ≤10h | <15% | 100–1,000 pcs | $34.58–122.75 | Color, material, size, logo, packaging, label, graphic |
| Ningbo Wing Precision Machin... Co., Ltd. | Zhejiang, CN | US $230,000+ | 100% | ≤3h | <15% | 500–1,000 pcs | $36.80–168.80 | Not specified |
| Ningbo Yingyi International Trade Co., Ltd. | Zhejiang, CN | US $210,000+ | 100% | ≤2h | 27% | 100 pcs | $89–120 | Color, size, logo, packaging, label, graphic |
| Nanning Nanyuanfang Refrigeration Equipment Co., Ltd. | Guangxi, CN | US $760,000+ | 99% | ≤5h | 15% | 1–2 pcs | $65.50–1,531 | Cycle time, shape, refrigerant, plug, weight, packaging, logo, filter, compressor, cooling mode, material, size, panel, packing |
| Shanghai Bingsu Refrigeration Technology Co., LTD. | Shanghai, CN | US $20,000+ | 100% | ≤1h | <15% | 1 set | $1,260–6,460 | Not specified |
Performance Analysis
Shenzhen Bway Tech offers entry-level pricing with extensive customization, ideal for private-label brands targeting retail markets. Ningbo Wing Precision demonstrates strong responsiveness and mid-range pricing, suitable for buyers prioritizing communication efficiency. Ningbo Yingyi stands out with a 27% reorder rate—indicating solid post-sale satisfaction—and flexible MOQs starting at 100 pieces. Nanning Nanyuanfang provides the broadest technical customization scope, including refrigerant and compressor specifications, catering to specialized commercial applications. Shanghai Bingsu focuses exclusively on large-capacity commercial systems, with MOQs as low as one unit but significantly higher price points reflecting industrial build quality. Buyers seeking fast iteration should prioritize suppliers with sub-5-hour response times and documented customization capabilities.
FAQs
How to verify ice maker supplier reliability?
Cross-check certifications (CE, RoHS) with official databases and request test reports for electrical safety and cooling performance. Analyze transaction history, focusing on on-time delivery consistency and dispute resolution outcomes. Conduct video audits to confirm factory operations and inventory readiness.
What is the typical sampling timeline?
Standard samples are produced within 7–15 days. Customized units requiring new molds or control boards may take 20–30 days. Air shipping adds 5–10 days depending on destination.
Can suppliers ship globally?
Yes, most suppliers support international shipping via air or sea freight. Confirm Incoterms (FOB, CIF, DDP), packaging standards for transit durability, and compliance with destination country regulations for electrical appliances.
Do manufacturers offer free samples?
Free samples are rare; most suppliers charge full or partial sample fees, which may be credited toward future bulk orders. Exceptions occur for high-volume commitments (e.g., 500+ units).
How to initiate customization requests?
Submit detailed specifications including daily ice output, dimensions, power requirements, refrigerant preference, and branding elements. Reputable suppliers will respond with technical drawings, component options, and tooling cost estimates within 48–72 hours.









