Instant Ice Maker
CN
CN
About instant ice maker
Where to Find Instant Ice Maker Suppliers?
China remains the central hub for instant ice maker manufacturing, with key production clusters in Zhejiang, Fujian, and Shanghai offering specialized capabilities. These regions host vertically integrated supply chains that support rapid prototyping and scalable production, particularly for compact and countertop models. Ningbo and Xiamen serve as primary centers for consumer-grade appliances, leveraging localized access to stainless steel, injection molding, and refrigeration components to reduce material lead times by 20–30%.
The industrial ecosystem enables efficient coordination between component suppliers, assembly lines, and logistics providers, many operating within a 50km radius. This proximity supports lean manufacturing practices, allowing suppliers to maintain average production lead times of 25–40 days for standard orders. Buyers benefit from flexible MOQ structures, ranging from single-unit sampling to bulk container loads, alongside established export channels to North America, Europe, and Southeast Asia.
How to Choose Instant Ice Maker Suppliers?
Procurement decisions should be guided by systematic evaluation criteria to ensure product quality, compliance, and supply chain reliability.
Technical and Regulatory Compliance
Verify adherence to international safety and environmental standards. CE certification is essential for European market entry, while CB certification indicates broader global compliance. For food-contact components, confirm use of BPA-free materials and compliance with RoHS directives. Suppliers should provide documentation for electrical safety (IEC 60335) and performance testing under variable ambient conditions (typically 25°C–32°C).
Production and Customization Capacity
Assess supplier infrastructure based on the following benchmarks:
- Minimum factory area exceeding 3,000m² for sustained volume output
- In-house design or engineering teams capable of supporting OEM/ODM projects
- Processing capabilities including sheet metal fabrication, plastic injection molding, and refrigerant charging systems
Prioritize suppliers advertising customization options for color, logo, packaging, and control panel interfaces, as these indicate flexible tooling and design workflows.
Transaction and Quality Assurance
Evaluate operational reliability using verifiable metrics: on-time delivery rates above 98%, response times under 5 hours, and reorder rates indicating customer retention. Utilize third-party transaction platforms to enable payment protection and post-delivery inspections. Request product samples to validate build quality, noise levels (typically 45–50 dB), ice production rate (ranging from 8–26 lbs/24hrs in consumer models), and water/energy consumption efficiency.
What Are the Best Instant Ice Maker Suppliers?
| Company Name | Main Products | Customization | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue | Min. Order Flexibility |
|---|---|---|---|---|---|---|---|
| Whalfly Tek Co., Ltd. | Ice Makers, Handheld Vacuums, Fans | Limited | 100% | ≤1h | <15% | US $9,000+ | 1 unit (select models) |
| Xiamen Sunford Industry Trade Co., Ltd. | Kitchen Appliances, Ice Makers | Color, Logo, Packaging, Material | 100% | ≤5h | 15% | US $290,000+ | 100–280 pieces |
| Shanghai Bingxi Refrigeration Equipment Co., Ltd. | Commercial & Industrial Ice Makers | Color, Size, Logo, Material | 100% | ≤1h | <15% | US $6,000+ | 1 piece (commercial units) |
| Yiwu Libo Trading Firm (Individual Business) | Bullet Ice Makers, Small Appliances | Limited | 100% | ≤3h | <15% | US $10,000+ | 2–4 pieces |
| Ningbo Aoja Electric Appliance Co., Ltd. | Stainless Steel Ice Makers, Cream Makers | Color, Logo, Packaging, Material | 98% | ≤3h | <15% | US $330,000+ | 1 piece / 650+ pieces (tiered) |
Performance Analysis
Suppliers like Xiamen Sunford and Ningbo Aoja demonstrate strong export capacity with high online transaction volumes and comprehensive customization offerings, making them suitable for branded retail or private-label distribution. Whalfly Tek and Yiwu Libo offer low MOQs ideal for startups or niche market testing, though with limited customization depth. Shanghai Bingxi specializes in commercial-grade equipment with full-piece orders, targeting hospitality or food service clients requiring durable, high-output machines. All top-tier suppliers maintain 100% on-time delivery except Ningbo Aoja (98%), indicating robust order management systems. Rapid response times (≤3h across four suppliers) reflect competitive engagement levels in this segment.
FAQs
What are typical MOQs for instant ice makers?
MOQs vary significantly by supplier and model type. Consumer units range from 1–4 pieces for sample orders, while bulk pricing typically starts at 100–650 units. Commercial models may require only 1 piece but carry higher per-unit costs.
What is the average lead time for production and shipping?
Manufacturing lead time averages 25–35 days after deposit confirmation. Air freight adds 5–10 days for urgent shipments; sea freight requires 25–40 days depending on destination port and customs procedures.
Can suppliers provide CE or CB certification?
Yes, several suppliers explicitly list CB certification (e.g., Xiamen Sunford), while others produce CE-marked models compliant with EU safety directives. Always request certified test reports and verify markings on actual units before shipment.
Are customization options available for branding?
Mid-to-large scale suppliers such as Xiamen Sunford and Ningbo Aoja offer full OEM services including custom colors, logos, packaging, and user interface labels. Minimum order thresholds apply, typically starting at 500 units for full branding integration.
How to evaluate ice maker performance before ordering?
Request technical specifications covering ice production rate (lbs/24hrs), storage capacity, power consumption (W), noise level (dB), and dimensions. Conduct sample testing to verify cycle consistency, ease of cleaning, and condensation control under real-world ambient temperatures.









