Label Printing Factory
About label printing factory
Where to Find Label Printing Factory Suppliers?
China remains a global hub for label printing manufacturing, with key industrial clusters in Guangdong, Jiangsu, and Anhui provinces driving competitive production. Shenzhen and Changzhou serve as primary centers for high-volume custom label fabrication, offering vertically integrated facilities that combine design, pre-press processing, digital and offset printing, die-cutting, and lamination under one roof. These regions benefit from concentrated supply chains for paper, adhesive films, foils, and ink systems, enabling cost efficiencies of 20–35% compared to Western-based printers.
Suppliers in these zones typically operate dedicated production lines for self-adhesive labels, shrink sleeves, hangtags, and specialty substrates such as kraft paper, vinyl, and BOPP. Integration with local packaging converters allows for rapid prototyping and short-run flexibility, supporting MOQs as low as 1 piece for digital orders. Lead times average 7–15 days for samples and 10–20 days for bulk production, depending on customization complexity and finishing requirements like embossing, spot UV, or foil stamping.
How to Choose Label Printing Factory Suppliers?
Effective supplier selection requires verification across technical, operational, and transactional dimensions:
Production & Material Capabilities
Confirm access to both digital and offset printing technologies for scalability. Evaluate substrate expertise—leading factories support matte/gloss paper, synthetic films, metallic finishes, and compostable materials. In-house die-cutting and laminating enhance process control. Prioritize suppliers listing paper & paperboard printing, packaging labels, and plastic packaging among core product lines.
Quality Management Indicators
While formal ISO 9001 certification is not explicitly stated in available data, performance metrics offer proxy indicators:
- On-time delivery rates ≥99% correlate with robust production planning
- Response times ≤1 hour suggest structured customer service protocols
- Reorder rates above 30% reflect consistent output quality and service reliability
For regulated industries (e.g., food, cosmetics), verify compliance with FDA, RoHS, or REACH standards for ink and adhesive safety through material declarations.
Order Flexibility & Transaction Security
Assess MOQ adaptability—suppliers offering 1-piece minimums cater to startups and testing phases, while those requiring 500+ units are optimized for volume efficiency. Unit pricing typically ranges from $0.01 to $0.68, influenced by size, material, and print complexity. Use incremental ordering strategies to validate quality before scaling. Where applicable, leverage secure payment terms and request physical samples to verify color accuracy, adhesion strength, and durability under real-use conditions.
What Are the Best Label Printing Factory Suppliers?
| Company Name | Location | Main Products | Monthly Output Capacity | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue | Min. Order Quantity | Unit Price Range |
|---|---|---|---|---|---|---|---|---|---|
| Shenzhen Minsda Printing Co., Ltd. | Guangdong, CN | Packaging Labels, Paper Boxes, Hangtags | High (diverse product range) | 87% | ≤2h | 26% | US $80,000+ | 500 pieces | $0.05–0.30 |
| Changzhou Jiuxin Printing Co., Ltd. | Jiangsu, CN | Packaging Labels | Moderate (focused output) | 99% | ≤1h | 36% | US $20,000+ | 1 piece | $0.01–0.05 |
| Hefei Dingwei Packaging Technology Co., Ltd. | Anhui, CN | Packaging Labels, Plastic Bottles, Lids | Moderate to High | 100% | ≤3h | 20% | US $10,000+ | 200–500 pieces | $0.01–0.68 |
| Xiamen Xinlisheng Printing & Packing Co., Ltd. | Fujian, CN | Packaging Labels, Paper Boxes, Stencils | Low to Moderate | 88% | ≤6h | <15% | US $6,000+ | 500–3,000 pieces | $0.01–0.08 |
| Shenzhen Tyson Paper Printing Co., Ltd. | Guangdong, CN | Paper & Paperboard Printing, Packaging Labels | High (broad capabilities) | 99% | ≤6h | 27% | US $220,000+ | 500 pieces | $0.01–0.15 |
Performance Analysis
Changzhou Jiuxin and Hefei Dingwei lead in punctuality with 99% and 100% on-time delivery, respectively, indicating strong operational discipline. Changzhou Jiuxin stands out for accessibility (≤1h response) and low MOQs, making it ideal for agile sourcing. Shenzhen Tyson reports the highest online revenue (US $220,000+), reflecting significant order volume and market presence, despite a slower average response. Shenzhen Minsda offers premium pricing tiers, suggesting specialization in higher-end cosmetic or beverage labeling. Buyers seeking rapid turnaround and small batches should prioritize suppliers with sub-500 MOQs and verified reorder rates above 25%.
FAQs
How to verify label printing factory reliability?
Analyze on-time delivery performance, reorder rate, and response time as proxies for operational stability. Request printed samples to assess color fidelity, edge precision, and material integrity. For long-term partnerships, conduct virtual audits of production floors and inquire about QC checkpoints during printing and finishing stages.
What is the typical sampling timeline?
Digital samples can be produced within 3–5 days; offset or multi-layer labels may require 7–10 days. Add 5–12 days for international shipping via express courier. Expedited services are often available at a premium.
Can label printing factories handle global shipping?
Yes, most export-ready suppliers manage international logistics via air or sea freight. Confirm Incoterms (e.g., FOB, EXW) and clarify responsibility for customs clearance, duties, and insurance. Factories with established export histories typically partner with freight forwarders to streamline documentation.
Do suppliers provide free samples?
Free samples are uncommon but negotiable upon commitment to future orders. Some suppliers waive fees for qualified buyers or offer discounted sample packs covering multiple materials and finishes.
How to initiate customization requests?
Submit artwork in vector format (AI, EPS, PDF) with bleed and trim marks. Specify dimensions, quantity, material type, adhesive properties (permanent/removable), and finishing preferences. Reputable factories will confirm feasibility, recommend optimizations, and provide proofs within 24–48 hours.









