Lantech Stretch Wrap Machine
About lantech stretch wrap machine
Where to Find Lantech Stretch Wrap Machine Suppliers?
China remains the global epicenter for stretch wrapping machinery production, with key manufacturing clusters in Shandong and Henan provinces driving innovation and scale. Shandong—home to Jinan and Qingdao—hosts vertically integrated packaging equipment manufacturers that benefit from proximity to steel, automation component, and logistics hubs. These regions support rapid prototyping and high-volume output, with many facilities operating under ISO-certified quality management systems.
The industrial ecosystem enables streamlined access to CNC machining, robotic assembly, and film extrusion technologies, reducing lead times for standard and customized stretch wrap machines. Suppliers in this region typically offer 20–35% cost advantages over Western counterparts due to localized supply chains and optimized labor efficiency. Buyers can expect average delivery windows of 30–45 days for standard configurations, with expedited options available through suppliers maintaining pre-assembled inventory.
How to Choose Lantech Stretch Wrap Machine Suppliers?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional dimensions:
Technical & Production Capabilities
Prioritize suppliers demonstrating in-house engineering and fabrication capacity. Key indicators include dedicated R&D teams, CNC-controlled machining centers, and automated welding lines. Confirm compatibility with pre-stretch film technology (up to 300% elongation) and integration readiness with conveyor systems or warehouse management software.
Quality Assurance Protocols
Verify adherence to international standards such as CE marking for electrical safety and mechanical compliance. While not explicitly stated in all profiles, CE certification is critical for market access in Europe and North America. Request test reports on load cell accuracy (for weight-sensing models), motor durability (≥5,000 cycles), and film tension control precision.
- Target suppliers with on-time delivery rates exceeding 95%
- Prefer response times under 2 hours for faster issue resolution
- Cross-reference online revenue metrics as proxies for order volume and service maturity
Customization & Transaction Security
Assess customization depth: leading suppliers support modifications in roll size (core diameter: 3", 6", 8"), film width (up to 500mm), power supply (110V/220V/380V), control panels (language options), and structural materials (carbon steel vs. stainless). Use secure payment mechanisms such as escrow services and insist on post-delivery inspection clauses. Sample testing should validate cycle time, wrapping consistency, and emergency stop functionality before bulk orders.
What Are the Best Lantech Stretch Wrap Machine Suppliers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Response Time | Reorder Rate | Customization Options |
|---|---|---|---|---|---|---|---|
| Shanghai Pudi Packaging Material Co., Ltd. | Shanghai, CN | Plastic Film (775), Adhesive Paper & Film (80) | US $1,000,000+ | 100% | ≤1h | 32% | Color, thickness, core size, extrusion layers, moisture-proof, PVC, graphic design, packaging label, material rewind |
| Jinan Glorious Machinery Co., Ltd. | Jinan, Shandong, CN | Pallet Wrapping Machines, Pre-stretch Systems | US $300,000+ | 100% | ≤3h | 50% | Color, material, size, logo, packaging, label, graphic |
| Qingdao Goldtec Machinery Co., Ltd. | Qingdao, Shandong, CN | Automatic Stretch Wrappers, Orbital Systems | US $290,000+ | 100% | ≤1h | 38% | Color, material, size, weight, language, packaging, label, graphic |
| Luohe Quality Mechanical Equipment Co., Ltd. | Luohe, Henan, CN | Semi-Automatic, Robotic Pallet Wrappers | US $420,000+ | 75% | ≤1h | 25% | Color, material, size, logo, packaging, label, graphic |
| Qingdao Youchuang Packaging Equipment Co., Ltd. | Qingdao, Shandong, CN | Horizontal Orbital Wrappers, Turntable Machines | US $6,000+ | 100% | ≤2h | <15% | Not specified beyond basic parameters |
Performance Analysis
Shanghai Pudi leads in commercial scale with over US$1M in reported online revenue and extensive customization capabilities across film and machine specifications. Jinan Glorious stands out for customer retention (50% reorder rate) and consistent delivery performance despite longer response times. Qingdao Goldtec combines fast responsiveness with multilingual interface support, ideal for international deployment. Luohe Quality offers competitive pricing but shows a lower on-time delivery rate (75%), suggesting potential fulfillment risks. Qingdao Youchuang maintains perfect delivery records but has limited reorder activity, indicating possible niche positioning or newer market entry.
FAQs
How to verify stretch wrap machine supplier reliability?
Validate certifications (CE, ISO 9001) through official databases or third-party audit reports. Review transaction histories for dispute resolution patterns. Request facility videos highlighting CNC operations, final assembly lines, and quality testing stations. Analyze product listings for consistency in technical documentation and specification clarity.
What is the typical MOQ and lead time?
Minimum Order Quantity is commonly 1 set for standard models. Custom configurations may require MOQs of 5–10 units. Lead times range from 20–45 days depending on complexity, with semi-automatic units shipping faster than fully integrated robotic systems.
Can suppliers customize voltage and control interfaces?
Yes, most suppliers listed offer voltage adaptation (110V–380V) and multi-language HMI panels (English, Spanish, Russian, Arabic). Confirmation should be obtained during technical review, along with PLC brand specifications (e.g., Siemens, Delta).
Do suppliers provide installation support or training?
Support varies. Larger suppliers often include remote setup guidance via video or manuals. On-site commissioning may incur additional fees. Clarify terms during negotiation, especially for automated or networked systems requiring calibration.
Are spare parts and after-sales service available?
Established suppliers maintain inventories of common wear components (motor brushes, sensors, film carriages). Service responsiveness depends on location; prioritize partners offering English-speaking technicians and documented SLAs for part replacement (typically 7–14 days).









