Little Ice Cube Maker
About little ice cube maker
Where to Source Little Ice Cube Maker Suppliers?
China remains the central hub for compact ice-making equipment manufacturing, with key production clusters in Guangdong, Guangxi, and Shanghai. These regions host vertically integrated supply chains specializing in small-scale refrigeration appliances, leveraging localized access to compressors, molds, and stainless-steel components. Shenzhen and Nanning-based manufacturers dominate the entry-level segment, offering mini countertop models priced between $40–$55 per unit, while Shanghai and Zhengzhou facilities focus on mid-range commercial units with enhanced cooling capacity and durability.
The concentration of component suppliers within 50km radii enables rapid prototyping and reduced assembly costs—typically 18–25% lower than offshore alternatives. Facilities benefit from streamlined logistics, with Shenzhen’s proximity to Hong Kong port and Zhengzhou’s rail-linked export corridors ensuring efficient global distribution. Buyers can expect standard lead times of 20–35 days for containerized orders, with air freight options available for sample shipments (7–10 days).
How to Evaluate Little Ice Cube Maker Suppliers?
Procurement decisions should be guided by verified operational metrics and technical compliance:
Quality Assurance Verification
Confirm adherence to international electrical and safety standards such as CE, RoHS, and UL where applicable. While not all suppliers list certifications explicitly, prioritize those with documented quality management systems, indicated by consistent on-time delivery rates exceeding 97%. Request test reports for critical functions including cycle time (typically 6–12 minutes per batch), refrigerant type (R134a or R600a), and water intake mechanisms.
Production and Customization Capacity
Assess scalability through facility performance indicators:
- Minimum monthly output capacity of 1,000 units for stable supply
- In-house design teams supporting OEM/ODM services (color, logo, packaging, panel layout)
- Material flexibility: ABS plastic, stainless steel housing, BPA-free trays
Cross-reference customization tags with response time (target ≤4 hours) and reorder rate to gauge customer satisfaction and service reliability.
Transaction Risk Mitigation
Utilize secure payment frameworks that align with order volume. For initial purchases, consider partial escrow arrangements until product validation is complete. Analyze supplier revenue trends—vendors reporting annual online sales above $300,000 demonstrate market viability and logistical maturity. Conduct sample testing to verify ice yield (typically 9–26 kg/24h), noise levels (<45 dB), and energy consumption (approx. 0.5–0.8 kWh/day).
What Are the Leading Little Ice Cube Maker Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Price Range (USD) | MOQ | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Jiuxiang Electric Appliance Co., Ltd. | Guangdong, CN | US $120,000+ | 97% | ≤4h | <15% | $40–42 | 1 piece/set | Color, material, size, logo, packaging, label, graphic |
| Nanning Nanyuanfang Refrigeration Equipment Co., Ltd. | Guangxi, CN | US $740,000+ | 99% | ≤5h | 15% | $112–362 | 1 piece | Cycle time, shape, refrigerant, plug, weight, material, logo, filter, compressor, packing size |
| Shanghai Tolcat Industrial Co., Ltd. | Shanghai, CN | US $300,000+ | 99% | ≤2h | 19% | $238–999 | 1 piece/set/m³ | Limited (industrial focus) |
| Zhengzhou Yize Machinery Co., Ltd. | Henan, CN | US $450,000+ | 98% | ≤2h | 29% | $390–4,400 | 1 set | Color, material, size, logo, packaging, label, graphic |
| Shenzhen Green Valley E-Commerce Co., Ltd. | Guangdong, CN | US $600+ | 100% | ≤3h | <15% | $44.50 | 1 piece | Not specified |
Performance Analysis
Shenzhen and Nanning-based suppliers offer competitive pricing and strong customization depth for consumer-grade units, making them ideal for retail and e-commerce buyers. Nanning Nanyuanfang stands out with extensive technical configurability across refrigerant, plug type, and cooling mode, suitable for region-specific deployments. Shanghai Tolcat and Zhengzhou Yize specialize in higher-capacity models, serving commercial clients needing durable, continuous-operation machines. Shenzhen Green Valley demonstrates flawless on-time delivery despite low transaction volume, suggesting niche operational efficiency. Prioritize suppliers with reorder rates above 15% and response times under 4 hours for reliable post-sale support and iterative order fulfillment.
FAQs
How to verify little ice cube maker supplier reliability?
Validate performance claims through third-party transaction records and delivery consistency (target ≥97%). Request product specifications including compressor type, ice shape (crescent, square, bullet), and daily output. Confirm compatibility with voltage standards (110V/220V) and frequency (50/60Hz) for destination markets.
What is the typical sampling timeline?
Standard samples are dispatched within 5–12 days after confirmation. Complex customizations involving mold adjustments or unique branding may require 18–25 days. Air shipping adds 7–10 business days internationally.
Can suppliers accommodate global shipping?
Yes, most suppliers support FOB, CIF, and DAP terms. Confirm whether packaging meets ISTA 3A standards for transit durability and if export documentation includes bill of lading, commercial invoice, and packing list. Sea freight is optimal for bulk orders (≥1x20GP container).
Do suppliers provide free samples?
Free samples are uncommon for this product category. Expect to pay full sample cost plus shipping, which may be reimbursed upon placement of a qualifying bulk order (typically MOQ x2 or higher).
How to initiate customization requests?
Submit detailed requirements covering dimensions, color Pantone codes, logo vector files, user interface language, and regulatory markings. Reputable suppliers will respond with technical drawings or 3D renderings within 72 hours and confirm tooling lead time for molded components (usually 10–15 days).









