Machine To Make Butter From Milk
CN
About machine to make butter from milk
Where to Find Suppliers for Machines to Make Butter from Milk?
China remains the central hub for manufacturing equipment used in dairy and plant-based butter production, with key supplier clusters located in Henan and Shanghai. These regions host integrated food processing machinery ecosystems that combine engineering expertise with scalable manufacturing infrastructure. Henan Province, particularly around Zhengzhou, is home to a dense network of industrial suppliers specializing in fermentation, homogenization, and pasteurization systems critical to milk-to-butter conversion. Shanghai's advanced manufacturing base supports precision components such as colloid mills and mixing tanks, often tailored for both small-scale operations and commercial dairies.
The regional advantages include vertically aligned supply chains—encompassing stainless steel fabrication, refrigeration units, and automation controls—that reduce component lead times by up to 25%. Buyers benefit from proximity to technical R&D centers and testing facilities, enabling faster prototyping and validation cycles. Average production lead times range from 20–45 days depending on customization level, with standard models typically available within 30 days. The concentration of multispecialty suppliers also allows for bundled procurement of complementary equipment like filling machines, sealing systems, and nut butter processing units.
How to Choose a Machine to Make Butter from Milk Supplier?
Effective supplier selection requires systematic evaluation across technical, operational, and transactional dimensions:
Technical Specifications and Process Integration
Verify compatibility with intended raw materials (cow milk, plant-based milks) and desired output capacity (batch vs. continuous processing). Essential features include programmable temperature control, adjustable agitation speed, cooling or heating jackets, and CIP (clean-in-place) functionality. For regulatory compliance, ensure adherence to food-grade material standards (e.g., AISI 304/316 stainless steel) and request documentation on pasteurization and homogenization parameters.
Production Capability Assessment
Evaluate suppliers based on demonstrated engineering capacity:
- Custom design capability for tank volume, insulation type, and automation integration
- In-house development of core components such as agitators, compressors, and filtration systems
- Availability of modular configurations scalable from 50L to 5,000L batches
Cross-reference product listings with on-time delivery performance (target ≥95%) and response time metrics (ideally ≤3 hours) to assess operational reliability.
Quality Assurance and Transaction Security
Prioritize suppliers offering verifiable quality management practices. While formal ISO 9001 certification is not universally listed, consistent on-time delivery rates above 98% and reorder rates exceeding 20% indicate strong post-sale satisfaction. Utilize secure payment mechanisms and request sample testing prior to bulk orders. Validate machine performance against industry benchmarks for churn efficiency, fat recovery rate, and energy consumption.
What Are the Top Machines to Make Butter from Milk Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Reorder Rate | Avg. Response | Customization Options | Product Range |
|---|---|---|---|---|---|---|---|
| Zhengzhou Hongle Machinery Equipment Co., Ltd. | Butter making machine, Filling Machines, Grain Product Making Machines | US $260,000+ | 94% | <15% | ≤3h | Color, size, logo, packaging, label, graphic | 14 products |
| Henan Bayern Industrial Co., Ltd. | Butter making machine, Fermenters, Dairy Processing Units | US $290,000+ | 98% | 21% | ≤1h | Tank size, sheet thickness, cooling plate, homogenization, pasteurization setup | 5 products |
| Shanghai Tiangang Machine Manufacture Co., Ltd. | Colloid Mills, Peanut Butter Making Machines, Bean Processing Machinery | US $50,000+ | 100% | 20% | ≤5h | None specified | 5 products |
| American Pacific Rim Luxury Goods LLC | Mixing Equipment, Reactors, Colloid Mills | US $30,000+ | 53% | - | ≤8h | None specified | 5 products |
| Jiegang Technology Co., Ltd. | Peanut Butter Makers, Colloid Mills, Sauce Making Machines | US $150,000+ | 100% | 40% | ≤4h | Color, material, size, logo, packaging, label, graphic | 5 products |
Performance Analysis
Henan Bayern Industrial stands out with a 98% on-time delivery rate and one-hour average response time, supported by deep customization capabilities in thermal processing and mixing dynamics. Jiegang Technology demonstrates high customer retention (40% reorder rate), indicating strong post-purchase support and product reliability despite a narrower equipment scope. Zhengzhou Hongle offers the broadest product portfolio and high revenue volume, suggesting established market presence. Shanghai Tiangang specializes in colloid mill technology—a critical subsystem in emulsification stages—but focuses more on nut-based applications. American Pacific Rim shows lower delivery reliability (53%), which may pose fulfillment risks for time-sensitive projects.
FAQs
What certifications should butter-making machine suppliers have?
While not all suppliers list formal certifications, prioritize those complying with food safety standards such as FDA-approved materials (AISI 304/316 stainless steel), CE marking for electrical components, and HACCP-aligned design principles. Request evidence of internal quality audits and material traceability protocols.
What is the typical minimum order quantity (MOQ)?
Most suppliers set MOQ at 1 unit or set, allowing flexibility for pilot purchases. Some models are offered per piece, facilitating low-volume trials before scaling.
Can these machines process both dairy and plant-based milks?
Yes, many listed machines are designed for multi-feedstock use, including cow milk, almond milk, soy milk, and oat milk. Confirm compatibility with specific viscosity and fat content ranges during technical consultation.
Do suppliers offer customization?
Multiple suppliers provide extensive customization—including tank capacity, insulation type, control panel language, and branding options. Henan Bayern and Jiegang Technology explicitly list engineering-level modifications such as pasteurization integration and cooling system design.
How long does production and shipping take?
Manufacturing lead time averages 20–45 days post-design confirmation. Air freight delivers samples within 7–10 days; sea freight for full containers takes 25–40 days depending on destination port and customs procedures.









