Mini Cnc Turning Machine
CN
CN
CN
About mini cnc turning machine
Where to Find Mini CNC Turning Machine Suppliers?
China remains the global epicenter for mini CNC turning machine manufacturing, with concentrated production clusters in Guangdong, Shandong, and Shanghai offering distinct competitive advantages. Dongguan and Shenzhen in Guangdong province host advanced machining ecosystems, integrating precision component suppliers and automation specialists within tightly coordinated supply chains. These regions support rapid prototyping and low-volume customization, ideal for compact CNC systems targeting hobbyists, educational institutions, and small-scale manufacturers.
Shandong and Shanghai-based suppliers emphasize industrial-grade durability and scalability, leveraging vertical integration from casting to final assembly. Facilities in these zones typically maintain in-house machining centers, enabling tighter control over critical components such as spindles, turrets, and control systems. Buyers benefit from localized sourcing networks that reduce lead times by 20–30% compared to offshore alternatives, with standard delivery windows ranging from 30 to 45 days. Cost efficiencies of 15–25% are achievable due to reduced logistics overhead and mature supplier proximity.
How to Choose Mini CNC Turning Machine Suppliers?
Adopt a structured evaluation framework to mitigate procurement risks and ensure technical alignment:
Quality Assurance Verification
Confirm adherence to internationally recognized standards such as ISO 9001 for quality management. For export markets in Europe and North America, CE marking is essential to meet electromagnetic compatibility and machinery safety directives. Request test reports validating spindle runout (typically ≤0.005mm), positional accuracy (±0.01mm), and thermal stability under continuous operation.
Production Capacity Assessment
Evaluate operational scale and technical infrastructure:
- Minimum factory area exceeding 3,000m² to support dedicated CNC assembly lines
- In-house capabilities in sheet metal fabrication, electrical integration, and software calibration
- Presence of R&D or engineering teams to support custom configurations
Cross-reference on-time delivery performance (target ≥97%) with online transaction volume to validate operational consistency.
Procurement Risk Mitigation
Utilize secure payment mechanisms that release funds upon successful equipment commissioning. Prioritize suppliers with documented dispute resolution processes and verifiable after-sales service records. Conduct pre-shipment inspections to verify machine specifications, including chuck size, tool turret capacity, and control system interface (e.g., Fanuc, Siemens, or Mach3).
What Are the Best Mini CNC Turning Machine Suppliers?
| Company Name | Supplier Type | Main Products | On-Time Delivery | Response Time | Reorder Rate | Online Revenue | Customization Options |
|---|---|---|---|---|---|---|---|
| Dongguan Chengshuo Hardware Co., Ltd. | Custom Manufacturer | Machining Services, Sheet Metal Fabrication, Casting | 97% | ≤2h | 40% | US $200,000+ | Color, size, logo, drilling, packaging, label, stamping, graphic |
| Shenzhen Richon Industry Co., Ltd. | Multispecialty Supplier | CNC Turning Machines, Automation Systems | 89% | ≤2h | 15% | US $290,000+ | System, color, material, size, logo, packaging, label, graphic |
| Taian Best Machinery Co., Ltd. | Multispecialty Supplier | CNC Lathes, Double-Spindle Turning Centers | 100% | ≤2h | <15% | US $70,000+ | Color, material, size, logo, packaging, label, graphic |
| Shanghai Ants Machine Equipment Co., Ltd. | Brand Holder | Mini CNC Milling Machines, 4-Axis Desktop Models | 100% | ≤4h | 50% | US $30,000+ | Motor, color, precision, packaging, label, table travel, system, material, size, logo, gearbox, graphic, dimensions |
| Shandong HR Machinery Co., Ltd. | Multispecialty Supplier | CK-Series Mini CNC Lathes, Automatic Feeder Integration | 100% | ≤2h | 50% | US $200,000+ | Power turret, color, workflow, feeder, tool holder, precision, packaging, label, collets, cutter holders, material, size, flat table, live tools, logo, chuck, control system, graphic |
Performance Analysis
Dongguan Chengshuo and Shandong HR Machinery demonstrate strong reliability with on-time delivery rates of 97% and 100%, respectively, coupled with high reorder rates (40–50%), indicating customer satisfaction and consistent output quality. Shandong HR stands out for extensive customization depth, supporting technical modifications across control systems, tooling configurations, and automation integration—critical for specialized production environments. While Shenzhen Richon reports the highest online revenue (US $290,000+), its lower reorder rate (15%) suggests potential gaps in post-sale support or product consistency. Taian Best and Shanghai Ants achieve perfect on-time fulfillment, with Shanghai Ants exhibiting a 50% reorder rate, reflective of effective client retention despite smaller revenue volume. Prioritize suppliers offering both certification compliance and proven customization experience for mission-critical applications.
FAQs
How to verify mini CNC turning machine supplier credibility?
Validate certifications through issuing bodies and request facility audit reports covering raw material traceability, QC checkpoints, and final testing procedures. Analyze buyer feedback focusing on machine repeatability, software stability, and spare parts availability.
What is the typical MOQ and pricing range?
Standard minimum order quantity is 1 set, with prices ranging from $3,250 for entry-level desktop models to $45,000+ for double-spindle or high-RPM industrial variants. Volume discounts apply for orders exceeding five units.
Can suppliers accommodate technical customizations?
Yes, most suppliers offer modifications in control systems (Fanuc, GSK, Syil), tool turret count (4–12 stations), chuck size (60–200mm), and automation readiness (bar feeders, chip conveyors). Engineering teams typically provide CAD drawings within 72 hours of inquiry.
What are common lead times for production and shipping?
Production lead time averages 30–40 days for standard configurations. Customized units require 45–60 days. Air freight delivers in 5–10 days; sea freight takes 20–35 days depending on destination port.
Do suppliers support global logistics and after-sales service?
Established suppliers manage international shipments under FOB or CIF terms and provide basic installation guides. Some offer remote troubleshooting via video support. On-site technician deployment may incur additional fees and requires advance coordination.









