Nugget Ice Maker Built In
CN
About nugget ice maker built in
Where to Find Nugget Ice Maker Built-In Suppliers?
China remains the dominant hub for manufacturing built-in nugget ice makers, with key production clusters concentrated in Shanghai, Guangdong, and Jiangsu provinces. These regions host vertically integrated facilities specializing in commercial refrigeration equipment, leveraging mature supply chains for compressors, evaporators, and food-grade stainless steel components. The proximity of component suppliers—within 50km radii in industrial zones—enables efficient assembly and quality control, reducing lead times by up to 25% compared to non-specialized manufacturers.
Suppliers in these clusters benefit from economies of scale, producing units ranging from compact undercounter models (40–100 kg/24h) to high-capacity commercial machines (up to 1,000 kg/24h). Monthly output across leading factories exceeds 5,000 units collectively, supported by automated production lines and modular design frameworks. This infrastructure allows rapid fulfillment of both standard and customized orders, with typical lead times between 20–35 days for container shipments. Export readiness is widespread, with most suppliers experienced in compliance documentation and international logistics coordination.
How to Choose Nugget Ice Maker Built-In Suppliers?
Procurement decisions should be guided by structured evaluation criteria to ensure reliability, performance, and compliance:
Technical Specifications & Compliance
Verify adherence to international safety and performance standards such as CE, RoHS, and ISO 9001. For North American or European markets, confirm electrical compatibility (110V/60Hz or 220–240V/50Hz) and certification by recognized bodies. Demand technical documentation including compressor type (e.g., Emerson or Secop), condenser material (copper vs. aluminum), and insulation efficiency ratings.
Production Capacity & Operational Metrics
Assess supplier capability through objective indicators:
- Minimum factory area exceeding 3,000m² for consistent batch production
- In-house R&D teams focused on energy efficiency and noise reduction (≤45 dB)
- Stainless steel fabrication and precision welding capabilities
Cross-reference on-time delivery rates (target ≥97%) and response times (ideally ≤4 hours) to gauge operational responsiveness.
Quality Assurance & Transaction Security
Prioritize suppliers offering third-party inspection options prior to shipment. Utilize secure payment mechanisms such as escrow services to mitigate risk. Request product samples to evaluate ice texture consistency, cooling cycle duration, and build quality. Confirm post-sale support availability, particularly for warranty claims and spare parts distribution.
What Are the Best Nugget Ice Maker Built-In Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Response Time | Reorder Rate | Min. Order | Price Range (USD) |
|---|---|---|---|---|---|---|---|
| Shanghai Bingsu Refrigeration Technology Co., LTD. | Ice Machines, Ice Makers, Cold Room Storage | US $20,000+ | 100% | ≤1h | <15% | 1 set | $1,298–6,460 |
| Guangzhou LVNI Hotel Supplies Co., Ltd. | Commercial Ice Makers, Custom Solutions | US $60,000+ | 100% | ≤4h | 33% | 1 unit | $340–3,038 |
| Wellcooling Intelligent Technology (JM) Co., Ltd. | Ice Machines, Vending Systems, Popsicle Equipment | US $140,000+ | 100% | ≤9h | 16% | 1 piece | $388–1,488 |
| Cixi Jirui Electric Appliance Co., Ltd. | Ice Makers, Blenders, Crushers | US $2,000+ | 50% | ≤7h | <15% | 2 cartons | $295–1,000 |
| Nantong Wuding Technology Co., Ltd. | WICE-Brand Ice Makers, Refrigeration Equipment | US $60,000+ | 97% | ≤3h | 16% | 1 set | $165–1,519 |
Performance Analysis
Guangzhou LVNI stands out with a 33% reorder rate, indicating strong customer satisfaction and effective customization offerings, including color, logo, and packaging modifications. Wellcooling leads in online revenue (US $140,000+), reflecting broad market penetration and diversified product integration into vending and snack systems. Shanghai Bingsu offers premium capacity models (up to 1,000 kg/24h) with full on-time delivery performance, suitable for large-scale hospitality deployments. Nantong Wuding provides competitive entry-level pricing starting at $165 per unit while maintaining sub-4-hour response times and 97% on-time delivery, ideal for budget-conscious buyers seeking reliable service. Cixi Jirui, despite lower on-time delivery (50%), offers some of the lowest price points but may present higher logistical risk for time-sensitive contracts.
FAQs
How to verify nugget ice maker supplier reliability?
Cross-check certifications (CE, ISO 9001) with issuing authorities and request test reports for compressor durability and ice production cycles. Analyze transaction history, focusing on on-time delivery rates and response consistency. Conduct video audits of production lines to confirm in-house manufacturing versus dropshipping.
What is the average sampling timeline for built-in nugget ice makers?
Standard sample production takes 10–20 days, depending on model complexity. Shipping via express courier adds 5–7 business days internationally. High-capacity or custom-configured units may require up to 30 days for prototyping and testing.
Can suppliers accommodate OEM/ODM requests?
Yes, select suppliers like Guangzhou LVNI offer comprehensive customization, including branding, color finishes, control panel interfaces, and dimensional adjustments. Minimum order quantities for OEM projects typically start at 10 units, with additional lead time for design validation.
What are typical MOQ and pricing structures?
Most suppliers allow single-unit orders for standard models, though bulk pricing applies at 2+ units. Entry-level countertop units start at $165, while high-output commercial built-in systems exceed $6,000. Buyers can negotiate better terms when ordering full container loads (FCL) of 10+ units.
How to assess long-term maintenance and parts availability?
Inquire about warranty duration (typically 1–2 years), availability of replacement evaporators, compressors, and augers. Prefer suppliers with documented spare parts inventories and partnerships with regional service providers to minimize downtime.









