Portable Ice Maker Making Small Cubes
CN
About portable ice maker making small cubes
Where to Find Portable Ice Maker Suppliers Making Small Cubes?
China remains the central hub for portable ice maker manufacturing, with key production clusters in Guangdong, Zhejiang, and Guangxi provinces. These regions host vertically integrated supply chains specializing in compact refrigeration systems, enabling rapid prototyping and cost-efficient scale production. Guangdong’s proximity to Shenzhen and Guangzhou ports facilitates streamlined export logistics, while Zhejiang's electrical appliance industrial base supports advanced compressor integration and smart control systems.
The sector benefits from mature ecosystems where component suppliers—compressors, evaporators, water pumps, and injection-molded housings—operate within close geographic proximity. This localization reduces lead times by 20–30% compared to offshore alternatives and allows for flexible batch sizing. Manufacturers in these clusters typically support MOQs as low as 1 unit for sample validation, with scalable output reaching 5,000+ units per month per facility. Average production lead times range from 15–30 days, depending on customization depth and order volume.
How to Choose Portable Ice Maker Suppliers Making Small Cubes?
Effective supplier selection requires structured evaluation across technical, operational, and transactional dimensions:
Technical & Design Capabilities
Confirm suppliers offer configurable options for cube size (typically 9–12mm), cycle time (6–12 minutes per batch), capacity (10–33 lbs/24h), and refrigerant type (R134a or R600a). Verify compatibility with voltage standards (110V/220V) and plug types (US/EU/UK/AU). Suppliers with in-house R&D teams can support custom UI panels, water filtration integration, and energy efficiency optimization.
Production & Quality Assurance
Prioritize manufacturers demonstrating measurable quality control metrics. Key benchmarks include:
- On-time delivery rate exceeding 97%
- Response time under 4 hours for inquiry resolution
- Reorder rates above 20%, indicating customer satisfaction
- Evidence of systematic testing protocols for cooling performance and compressor longevity
While formal ISO 9001 certification is not universally declared in available data, consistent online transaction histories and verifiable revenue streams (e.g., $300,000+ annual platform revenue) serve as indirect indicators of process maturity.
Customization and Transaction Security
Most suppliers support OEM/ODM services including logo printing, packaging redesign, color variation, and material substitution (ABS vs. stainless steel housing). Ensure graphic files and labeling specifications are reviewed pre-production. Utilize secure payment frameworks that release funds upon shipment confirmation or third-party inspection, especially for orders exceeding 100 units.
What Are the Best Portable Ice Maker Suppliers Making Small Cubes?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Min. Order Flexibility | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Whalfly Tek Co., Ltd. | Guangdong, CN | Ice Makers, Handheld Vacuums, Fans | US $9,000+ | 100.0% | ≤1h | <15% | 1 unit | Limited |
| Guangdong No. 7 Warehouse Hotel Supplies Co., Ltd. | Guangdong, CN | Hotel Equipment, Ice Makers | US $350,000+ | 99% | ≤4h | 25% | 1 piece | Capacity, Packaging |
| Nanning Nanyuanfang Refrigeration Equipment Co., Ltd. | Guangxi, CN | Refrigeration Systems, Ice Machines | US $750,000+ | 99% | ≤5h | 18% | 1–2 pieces | Shape, Cycle Time, Refrigerant, Plug, Logo, Filter, Panel |
| Jiangyin Brenu Industry Technology Co., Ltd. | Jiangsu, CN | Commercial & Industrial Ice Makers | US $140,000+ | 94% | ≤3h | 26% | 1 set | Size, Logo, Packaging |
| Zhejiang Raf Electric Co., Ltd. | Zhejiang, CN | Household & Commercial Ice Makers | US $310,000+ | 98% | ≤5h | <15% | 1–2 pieces | Color, Material, Logo, Label, Adapter, Graphic |
Performance Analysis
Whalfly Tek stands out for reliability with a perfect 100% on-time delivery record and sub-1-hour response time, though its lower reorder rate suggests limited post-sale engagement. Guangdong No. 7 Warehouse combines strong fulfillment (99%) with high buyer retention (25% reorder), indicating balanced service quality. Nanning Nanyuanfang leads in technical flexibility, offering customization across refrigerant, plug type, and internal components—critical for compliance in regulated markets. Jiangyin Brenu shows the highest reorder rate (26%), reflecting customer loyalty likely driven by product durability and responsive support. Zhejiang Raf provides broad aesthetic customization and competitive pricing, ideal for branded consumer products targeting retail channels.
FAQs
How to verify portable ice maker supplier reliability?
Assess on-time delivery history, response speed, and reorder rates as proxies for operational stability. Request product test reports on cooling cycle efficiency, noise levels (dB), and power consumption. For higher-risk markets, require CE, RoHS, or ETL certifications and validate through independent labs.
What is the typical sampling timeline?
Standard samples ship within 7–14 days after confirmation. Customized models may require 18–25 days for tooling adjustments and functional testing. Air freight adds 5–10 days for international delivery.
Can suppliers accommodate low-volume orders?
Yes, most suppliers listed accept MOQs of 1–2 units for initial testing. However, unit prices decrease significantly at volumes above 100 pieces, where bulk production efficiencies apply.
Do manufacturers provide free samples?
Free samples are uncommon unless tied to future volume commitments. Sample costs typically range from $40–$280, often partially or fully credited upon order placement.
How to initiate customization requests?
Submit detailed specifications covering desired cube dimensions, hourly output, voltage requirements, safety certifications, housing material, and branding elements. Reputable suppliers will respond with engineering feasibility assessments, 3D renderings, and prototype timelines within 3–5 business days.









