Raspberry Pi Pico 2
CN
About raspberry pi pico 2
Where to Find Raspberry Pi Pico 2 Suppliers?
China remains a central hub for single-board computer manufacturing, with Shenzhen-based suppliers leading production of compact microcontroller units like the Raspberry Pi Pico 2. The city's electronics ecosystem—anchored by Futian and Bao'an districts—hosts vertically integrated supply chains that streamline component sourcing, PCB assembly, and firmware integration. This concentration enables rapid prototyping and scalable production, with many suppliers operating within proximity to IC distributors, testing labs, and logistics providers.
Suppliers in this region leverage established partnerships with semiconductor vendors and contract manufacturers to maintain consistent output of development boards. The localized infrastructure supports agile order fulfillment, with typical lead times ranging from 7–15 days for standard batches. Buyers benefit from competitive pricing due to reduced overheads and direct access to source components, with economies of scale further lowering per-unit costs for orders exceeding 100 pieces. Additionally, Shenzhen’s export-oriented facilities are equipped for international compliance, facilitating smoother customs clearance across EU, North American, and APAC markets.
How to Choose Raspberry Pi Pico 2 Suppliers?
Selecting reliable partners requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical & Quality Assurance
Confirm adherence to industry-standard quality management systems such as ISO 9001. While not always explicitly stated, reputable suppliers implement internal testing protocols for electrical performance, solder joint integrity, and thermal stability. Request validation of key specifications including RP2040 dual-core processor functionality, 2MB flash memory (Pico 2), and USB 1.1/UART/SPI/I2C interface reliability. For regulated applications, ensure RoHS and CE compliance documentation is available upon request.
Production and Customization Capability
Assess supplier flexibility through the following criteria:
- Minimum Order Quantity (MOQ) below 10 units indicates readiness for prototyping and small-scale projects
- Customization options for firmware preloading, pin header configuration, or labeling suggest advanced service depth
- In-house programming and testing infrastructure enhances consistency and traceability
Cross-reference product listings with on-time delivery rates (>96%) and response times (≤5 hours) to gauge operational efficiency.
Transaction Security and Verification
Prioritize suppliers with verifiable transaction histories and third-party assurance mechanisms. Analyze reorder rates as an indicator of customer satisfaction—values above 20% reflect strong post-sale reliability. Conduct sample testing to validate board functionality before scaling procurement. Use secure payment methods with escrow protection to mitigate risk during initial engagements.
What Are the Best Raspberry Pi Pico 2 Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | MOQ Range | Price Range (USD) | Customization |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Geermax Tech Co., Limited | Shenzhen, CN | US $110,000+ | 100% | ≤3h | 23% | 2–3 pcs | $5.40–10.60 | Color, material, size, logo |
| Shenzhen Oufade Electronics Co., Ltd. | Shenzhen, CN | US $50,000+ | 100% | ≤1h | 16% | 10 pcs | $6.00–12.00 | Memory, plug, RAM |
| Shenzhen Futian District New Asia Electronic Market Zhongshi Soldering Business Department | Shenzhen, CN | US $7,000+ | 100% | ≤1h | 26% | 1 pc | $4.18–10.34 | Not specified |
| Shenzhen Dalu Electronics Co., Ltd. | Shenzhen, CN | US $110,000+ | 96% | ≤6h | 15% | 1 unit | $3.70–8.80 | Not specified |
| Shenzhen Zarding Electronic Co., Limited | Shenzhen, CN | US $7,000+ | 100% | ≤5h | <15% | 1 unit/box | $7.00–18.00 | Not specified |
Performance Analysis
Shenzhen Geermax and Dalu Electronics demonstrate high-volume transaction capacity (US $110,000+ online revenue) and low MOQs, making them suitable for both prototyping and bulk procurement. Geermax stands out with a 23% reorder rate and customization support across multiple parameters. The Zhongshi Soldering Business Department offers the lowest entry MOQ (1 piece) and aggressive pricing starting at $4.18, ideal for individual developers or small labs. Oufade Electronics leads in responsiveness (≤1 hour) and maintains full on-time delivery, though its higher MOQ (10 pcs) may limit accessibility for low-volume buyers. Dalu Electronics provides the most competitive base price ($3.70), but slightly lower on-time delivery (96%) warrants closer shipment monitoring. Zarding targets niche demand with broader product bundling (e.g., box-level ordering), albeit with limited reorder data.
FAQs
How to verify Raspberry Pi Pico 2 supplier reliability?
Cross-check self-reported certifications with official registries where possible. Request batch test reports or functional verification videos. Evaluate supplier credibility through transaction volume, reorder rates, and response consistency. Engage in pre-order technical discussions to assess engineering support depth.
What is the typical lead time for Raspberry Pi Pico 2 orders?
Standard orders are typically fulfilled within 7–15 days after payment confirmation. Sample shipments can be dispatched within 3–5 business days. Add 5–10 days for international air freight depending on destination.
Can suppliers provide customized firmware or hardware modifications?
Yes, select suppliers offer customization such as pre-flashed MicroPython/CircuitPython firmware, modified pin layouts, or branded silkscreening. Confirm compatibility with official Raspberry Pi SDKs and debugging tools prior to integration.
Is there a minimum order quantity for Raspberry Pi Pico 2 boards?
MOQ varies by supplier: ranges from 1 unit (ideal for testing) to 10 pieces (common for cost-optimized runs). Larger orders often unlock tiered pricing and dedicated QC inspection.
Do suppliers support global shipping and export compliance?
Yes, most suppliers handle international logistics via express carriers (DHL, FedEx) or air freight. Verify whether export documentation, import duties, and VAT are included under quoted terms. Ensure products meet destination-market requirements for electronic equipment classification.









