Toroidal Transformer Winding Machine Price In India
CN
About toroidal transformer winding machine price in india
Where to Find Toroidal Transformer Winding Machine Suppliers?
China remains the dominant manufacturing hub for toroidal transformer winding machines, with key production clusters in Shandong, Shanghai, and Guangdong provinces. These regions host vertically integrated industrial ecosystems that combine precision engineering, CNC machining, and automation expertise. Shandong-based suppliers leverage proximity to steel and electrical component suppliers, reducing material lead times by 15–20%. Meanwhile, Guangdong’s Shenzhen zone specializes in high-precision CNC-controlled winding systems, supported by advanced R&D infrastructure and rapid prototyping capabilities.
The concentration of technical talent and supply chain efficiency enables competitive pricing without compromising build quality. Suppliers in these zones typically operate facilities exceeding 5,000m², with monthly production capacities ranging from 50 to 200 units depending on automation level. Buyers benefit from scalable output, short delivery cycles (average 30–45 days), and flexible customization for coil diameter, wire gauge, and control interface specifications.
How to Choose Toroidal Transformer Winding Machine Suppliers?
Selecting reliable suppliers requires a structured evaluation across technical, operational, and transactional dimensions:
Technical Compliance
Verify adherence to international standards such as ISO 9001 for quality management and CE marking for electrical safety compliance—critical for market access in India and other regulated economies. Request documentation on motor control systems, encoder accuracy, and software interfaces (e.g., PLC or CNC integration). Machines designed for high-volume transformer production should support programmable logic controllers and real-time tension control.
Production Capability Audits
Assess supplier infrastructure using the following benchmarks:
- Minimum factory area of 3,000m² indicating capacity for dedicated assembly lines
- In-house development teams focused on automation and machine diagnostics
- Integrated testing protocols for speed calibration, wire break detection, and turn-count accuracy
Cross-reference online revenue data and reorder rates where available; consistent repeat business signals reliability and post-sale support effectiveness.
Transaction Safeguards
Utilize secure payment mechanisms such as escrow services to mitigate risk during initial procurement. Prioritize suppliers with documented on-time delivery performance (target ≥97%) and response times under 12 hours. Conduct sample testing to validate machine precision—benchmark against industry standards for winding uniformity and cycle time consistency before scaling orders.
What Are the Best Toroidal Transformer Winding Machine Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Price Range (USD) | Min. Order |
|---|---|---|---|---|---|---|---|
| Shandong Darling Machinery Equipment Co., Ltd. | Shandong, CN | US $390,000+ | 100% | ≤1h | 100% | $9,300–15,800 | 1 set |
| Wisdom Import & Export (Shanghai) Co., Ltd. | Shanghai, CN | Not specified | 100% | ≤25h | Not available | $2,000–5,000 | 1 set |
| Shenzhen Pingsheng Automation Equipment Co., Ltd. | Guangdong, CN | US $10,000+ | 100% | ≤12h | Not available | $5,998–49,999.99 | 1 set |
| Yibo Automation Equipment Co., Ltd. | Zhejiang, CN | US $10,000+ | 100% | ≤3h | Not available | $1,000–14,000 | 1 set |
| Tianjin Grewin Technology Co., Ltd. | Tianjin, CN | US $20,000+ | 100% | ≤6h | 33% | $2,200–5,000 | 1 set |
Performance Analysis
Shandong Darling stands out with full order fulfillment reliability, strong financial activity (over $390k online revenue), and immediate responsiveness—ideal for buyers prioritizing supply chain continuity. In contrast, Wisdom (Shanghai) offers the most cost-competitive entry point ($2,000 minimum), though slower response times suggest potential delays in technical communication. Shenzhen Pingsheng presents a wide price spectrum, reflecting its range from basic models to high-end CNC systems capable of handling large-core transformers. Yibo Automation features one outlier unit priced at $1,000, likely a semi-automatic variant suited for small workshops. Tianjin Grewin combines affordability with moderate reorder activity, indicating acceptable customer satisfaction within budget constraints.
FAQs
What is the typical price range for toroidal transformer winding machines in India?
Imported machines from Chinese suppliers are listed between $1,000 and $50,000, with most automated models falling within $2,000–$15,000. Pricing correlates directly with automation level, control system sophistication, and maximum coil size capacity.
Are samples available before bulk purchase?
Yes, many suppliers offer functional demonstrations or video validations of machine operation. While physical samples may incur partial charges, they are often credited toward first orders. Confirm sample lead times—typically 10–20 days—and shipping terms (FOB vs. CIF).
Can winding machines be customized for Indian power standards?
Reputable manufacturers support voltage and frequency adjustments (e.g., 230V/50Hz compatibility) and can integrate local-language HMI panels. Provide detailed technical requirements early in discussions to ensure seamless integration into existing production lines.
What are common MOQ and lead time expectations?
Standard minimum order quantity is 1 set, facilitating pilot procurement. Average production lead time ranges from 20–40 days post-deposit, with sea freight adding 25–35 days for Indian ports. Expedited builds may reduce timelines by 10–15 days at additional cost.
Do suppliers provide installation and training support?
Most suppliers offer remote setup guidance via video or manuals. Some provide on-site technician deployment for an additional fee, particularly for fully automatic systems. Clarify service scope and costs during negotiation to avoid post-delivery gaps.









