Ultrafreeze Ice Cube Maker
CN
About ultrafreeze ice cube maker
Where to Find Ultrafreeze Ice Cube Maker Suppliers?
China remains the dominant hub for commercial ice-making equipment manufacturing, with key supplier clusters concentrated in Shandong, Guangdong, and Shanghai. These regions host vertically integrated production ecosystems specializing in refrigeration systems, stainless steel fabrication, and automated control integration—critical components for high-efficiency ultrafreeze ice cube makers. Shandong-based manufacturers leverage proximity to raw material suppliers and port logistics networks, reducing component lead times by up to 20%. Guangdong’s Pearl River Delta region offers advanced CNC machining and sheet metal processing infrastructure, enabling rapid prototyping and large-volume production runs.
The industrial clusters support scalable output with facilities averaging over 5,000m² and dedicated R&D teams focused on energy efficiency and automation. Suppliers in these zones typically operate full-cycle production lines—from compressor assembly to final testing—ensuring tighter quality control and faster time-to-shipment. Buyers benefit from localized supply chains that reduce manufacturing costs by 15–25% compared to non-Asian producers, while maintaining compliance with international performance standards. Standard lead times range from 25 to 40 days for containerized orders, with express production options available for urgent procurement needs.
How to Choose Ultrafreeze Ice Cube Maker Suppliers?
Procurement decisions should be guided by rigorous evaluation of technical, operational, and transactional indicators:
Technical Compliance and Quality Assurance
Verify adherence to CE, ISO 9001, and RoHS standards as baseline requirements for market access and product safety. Demand test reports for core components including compressors (e.g., Copeland or Bitzer equivalents), condensers, and evaporators. Confirm insulation materials meet food-grade safety regulations and that electrical systems comply with IEC 60335 for commercial appliances.
Production Capacity Verification
Assess supplier capability through measurable benchmarks:
- Minimum factory area of 3,000m² for sustained volume output
- In-house engineering team capable of customizing freezing cycles, ice cube size (full/half cube), and cooling methods (air/water-cooled)
- Integrated assembly lines with pressure testing, leak detection, and 72-hour operational burn-in procedures
Cross-reference declared capacities with verified online revenue data and on-time delivery rates exceeding 97%.
Transaction Security and After-Sales Support
Prioritize suppliers offering third-party payment protection and post-delivery service frameworks. Evaluate responsiveness (target ≤8 hours) and reorder rate as proxies for customer satisfaction. Request documentation for warranty terms (minimum 1-year standard), spare parts availability, and remote diagnostic support. On-site technician training and multilingual manuals are strong indicators of export readiness.
What Are the Best Ultrafreeze Ice Cube Maker Suppliers?
| Company Name | Location | Main Products (Listings) | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options |
|---|---|---|---|---|---|---|---|
| Shandong Qianrui Machinery Technology Co., Ltd. | Shandong, CN | Ice Machines (2,156) | US $9,000+ | 100% | ≤1h | <15% | Limited |
| Shanghai Zhaoxue Refrigeration Equipment Co., Ltd. | Shanghai, CN | Ice Machines (Not specified) | US $670,000+ | 100% | ≤14h | - | Color, material, size, logo, capacity |
| Xingji Cold And Hot Electric Appliance (Guangdong) Co., Ltd. | Guangdong, CN | Ice Machines (86) | - | 100% | ≤8h | - | Limited |
| Jinan Robin Machinery Co., Ltd. | Shandong, CN | Ice Machines (738) | US $100,000+ | 100% | ≤3h | 33% | Limited |
| Guangzhou Anhe Catering Equipment Co., Ltd. | Guangdong, CN | Ice Machines (Not specified) | US $870,000+ | 100% | ≤4h | 30% | Full range: capacity, motor, controller, phase, dimensions |
Performance Analysis
Shandong Qianrui leads in product breadth with over 2,100 listings, indicating robust inventory and standardized production, though its low reorder rate suggests limited differentiation. Jinan Robin and Guangzhou Anhe demonstrate higher customer retention (30–33% reorder rates), reflecting reliable service and consistent quality. Guangzhou Anhe stands out for extensive customization depth, supporting modifications across electrical configuration, compressor type, and structural design—critical for integration into commercial kitchens or industrial processing lines. Shanghai Zhaoxue offers broad aesthetic and dimensional flexibility but slower response times. All top-tier suppliers maintain perfect on-time delivery records, a key risk mitigation factor for time-sensitive installations.
FAQs
What is the typical MOQ for ultrafreeze ice cube makers?
Most suppliers list a minimum order quantity of 1 set, facilitating sample testing and small-scale deployment. Bulk pricing typically applies at 5+ units, especially for modular or high-capacity models (e.g., 1-ton/day and above).
What are common lead times for production and shipping?
Production lead time ranges from 20–35 days after deposit confirmation. Air freight delivers samples within 7–10 days; sea freight for full containers takes 25–40 days depending on destination port and customs clearance efficiency.
Can suppliers customize ice cube size and machine output?
Yes, reputable manufacturers offer configurable ice formats (full cube, half cube, crescent) and daily yield from 25kg to 5 tons. Custom molds, freezing cycle duration, and bin storage capacity can be adjusted based on client specifications.
Do suppliers provide certification documentation?
Leading suppliers issue CE and ISO 9001 certificates upon request. Third-party test reports for noise levels, power consumption, and ice purity are available for audit purposes, particularly for EU and North American regulatory compliance.
How to verify factory capabilities before ordering?
Request video tours of production lines, welding stations, and QA testing bays. Validate claims with documented evidence such as machinery calibration logs, workforce size, and export licenses. Third-party inspection services (e.g., SGS, BV) can conduct pre-shipment audits for high-value contracts.









