Chewable Ice Maker For Home
CN
About chewable ice maker for home
Where to Find Chewable Ice Maker Suppliers for Home Use?
China remains the central hub for manufacturing compact and energy-efficient chewable ice makers designed for residential use, with key production clusters concentrated in Zhejiang and Fujian provinces. Ningbo in Zhejiang hosts a dense network of appliance manufacturers specializing in small home appliances, leveraging mature supply chains for compressors, evaporators, and food-grade plastics. Xiamen-based suppliers in Fujian benefit from proximity to port logistics and electronics component suppliers, enabling faster prototyping and export cycles.
These regional ecosystems support vertically integrated production—encompassing injection molding, PCB assembly, and final testing—allowing suppliers to maintain tight control over cost and quality. Buyers gain access to scalable operations capable of fulfilling both bulk orders and customized configurations. Typical advantages include 20–35% lower unit costs compared to Western manufacturers, lead times averaging 25–40 days for container shipments, and strong flexibility in design modifications such as capacity, shape (bullet, nugget, or pebble), and user interface.
How to Choose Chewable Ice Maker Suppliers for Home Applications?
Selecting reliable suppliers requires rigorous evaluation across technical, operational, and transactional parameters:
Quality Assurance & Compliance
Verify adherence to international standards including CE, RoHS, and UL certifications where applicable. These indicate compliance with electrical safety and environmental regulations critical for consumer market entry in North America and Europe. Request test reports on compressor efficiency, noise levels (typically ≤45 dB), and ice yield consistency over 24-hour cycles.
Production Capacity Verification
Assess infrastructure maturity through measurable indicators:
- Minimum monthly output capacity exceeding 10,000 units for stable supply
- In-house tooling and mold-making capabilities to support customization
- Dedicated QC teams conducting pre-shipment inspections (PSI) and life cycle testing
Cross-reference supplier claims with on-time delivery performance; a rate ≥98% indicates robust production planning.
Customization & Transaction Security
Confirm available OEM/ODM services such as color variation, logo printing, packaging design, and voltage adaptation (110V vs. 220V). Prioritize suppliers offering third-party trade assurance programs to secure payments against non-compliance. Sample validation is essential—evaluate ice texture, cooling speed, and water consumption before scaling procurement.
What Are the Top Chewable Ice Maker Suppliers for Home Use?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Verified Supplier Type |
|---|---|---|---|---|---|---|---|---|
| Ningbo Konwin Electrical Appliance Co., Ltd. | Ningbo, Zhejiang, CN | Ice Makers, Electric Heaters, Air Coolers | US $2,000,000+ | 100% | ≤3h | 33% | Color, material, size, logo, packaging, label, graphic | Custom Manufacturer |
| Xiamen Beiruikang Technology Co., Ltd. | Xiamen, Fujian, CN | Ice Makers, Vacuum Cleaners, Dehumidifiers | US $290,000+ | 100% | ≤2h | <15% | Not specified | Not verified |
| Xiamen Sunford Industry Trade Co., Ltd. | Xiamen, Fujian, CN | Nugget Ice Makers, Portable Countertop Units | US $290,000+ | 100% | ≤5h | 15% | Color, material, size, logo, packaging, label, graphic | Multispecialty Supplier |
| Ningbo Yingyi International Trade Co., Ltd. | Ningbo, Zhejiang, CN | Euhomy-branded Bullet & Countertop Ice Makers | US $210,000+ | 100% | ≤2h | 16% | Color, size, logo, packaging, label, graphic | Multispecialty Supplier |
| Ningbo Wing Smart Electric Appliance Co., Ltd. | Ningbo, Zhejiang, CN | Pellet, Nugget, and Countertop Ice Makers | US $1,000+ | 100% | ≤2h | <15% | Color, material, size, logo, packaging, label, graphic | Multispecialty Supplier |
Performance Analysis
Ningbo Konwin stands out with the highest online revenue (US $2M+) and a 33% reorder rate, indicating strong buyer retention and production scalability. All five suppliers maintain perfect on-time delivery records (100%), suggesting disciplined logistics management within this niche. Xiamen-based suppliers offer competitive responsiveness (≤2h average response time), while Ningbo firms dominate in customization depth and product specialization. For high-volume buyers, prioritize suppliers with documented OEM experience and in-house R&D. For faster turnaround on standard models, consider companies with ready inventory and low MOQs starting at 50 pieces.
FAQs
How to verify chewable ice maker supplier reliability?
Cross-check claimed certifications (CE, RoHS) with official databases. Request factory audit reports or video tours to confirm production lines and QC processes. Analyze transaction history, focusing on consistent delivery performance and dispute resolution transparency.
What is the typical minimum order quantity (MOQ)?
MOQs vary by supplier and model: ranges from 50 to 1,000 units. Some suppliers offer single-piece sampling for testing, though bulk pricing applies only above MOQ thresholds. Negotiate lower MOQs when committing to recurring orders.
What are common lead times for production and shipping?
Production lead time averages 20–30 days post-deposit. Add 10–25 days for sea freight depending on destination. Air shipping reduces transit time to 5–10 days but increases logistics costs significantly.
Do suppliers support private labeling and packaging customization?
Yes, most suppliers listed offer full OEM services including custom branding, color schemes, user manuals, and retail-ready packaging. Lead time may extend by 5–7 days for new mold adjustments or graphic design integration.
Can ice makers be customized for different ice types?
Suppliers support multiple ice formats—nugget, bullet, pebble, and crushed—with varying densities and textures suitable for chewing. Custom molds and auger designs can be developed upon request, typically requiring prototype approval within 14–21 days.









