Electactic Nugget Ice Maker
CN
About electactic nugget ice maker
Where to Find Electactic Nugget Ice Maker Suppliers?
China remains the central hub for electactic nugget ice maker production, with key manufacturing clusters located in Zhejiang, Jiangsu, and Guangdong provinces. These regions host vertically integrated supply chains that streamline component sourcing—such as compressors, evaporators, and food-grade plastic molds—enabling rapid prototyping and scalable output. Ningbo and Shenzhen serve as innovation centers, combining advanced injection molding techniques with smart cooling system integration, while Jiangsu-based factories emphasize high-volume export readiness through automated assembly lines.
The industrial ecosystem supports both commercial-grade and household models, with typical daily production capacities ranging from 1,000 to 5,000 units per facility. Localized access to refrigerants (R600a, R134a), copper condensers, and energy-efficient compressors reduces material costs by 18–25% compared to non-specialized regions. Buyers benefit from consolidated logistics networks, particularly near Shanghai and Shenzhen ports, which ensure average lead times of 25–35 days for container shipments. The concentration of OEM/ODM specialists also facilitates flexible order structuring, including drop-shipping configurations and private labeling.
How to Choose Electactic Nugget Ice Maker Suppliers?
Effective supplier selection requires systematic evaluation across three core dimensions:
Technical & Production Capability
Verify suppliers have in-house design control over critical systems: compressor integration, air-cooled condenser layout, and water circulation mechanisms. Prioritize manufacturers with documented experience in CE, RoHS, and UL compliance testing, especially for North American and EU market exports. Confirm availability of performance validation reports, including ice yield consistency (kg/24h), power consumption (kWh/day), and noise levels (dB).
Manufacturing Scalability
Assess operational scale through verifiable metrics:
- Minimum factory area exceeding 3,000m² for stable mass production
- Demonstrated monthly output capacity above 10,000 units
- In-house capabilities in mold development, sheet metal fabrication, and final-line testing
Cross-reference on-time delivery rates (target ≥95%) and response times (ideally ≤5 hours) to gauge operational responsiveness.
Customization & Transaction Security
Evaluate flexibility in color finishes, branding (logo/label placement), packaging design, and electrical specifications (voltage/plug type). Ensure suppliers support third-party inspection services and offer secure transaction frameworks such as escrow or trade assurance programs. Request sample units to validate build quality, cycle time accuracy, and thermal efficiency before bulk ordering.
What Are the Best Electactic Nugget Ice Maker Suppliers?
| Company Name | Location | Main Products (Listings) | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue | Customization Options | Min. Order Quantity |
|---|---|---|---|---|---|---|---|---|
| Jiangsu Eternity Import & Export Co., Ltd. | Jiangsu, CN | Ice Machines (891) | 100% | ≤2h | <15% | $70,000+ | Color, size, logo, packaging, refrigerant, compressor, plug | 100–1,000 pcs |
| Ningbo Aquart Electrical Appliance Co., Ltd. | Zhejiang, CN | Nugget Ice Makers (4+ listings) | 100% | ≤5h | 33% | $140,000+ | Color, material, size, logo, packaging | 455–1,000 pcs/carts |
| Cixi Jirui Electric Appliance Co., Ltd. | Zhejiang, CN | Ice Makers (135) | 100% | ≤5h | <15% | $3,000+ | Commercial models, multi-functional units | 2–2 cartons |
| Shenzhen Bway Tech Co., Ltd. | Guangdong, CN | Ice Makers (5+ listings) | 87% | ≤7h | <15% | $10,000+ | Color, logo, packaging, graphic design | 100–1,000 pcs |
| Whalfly Tek Co., Ltd. | Guangdong, CN | Ice Makers (468) | 100% | ≤1h | <15% | $9,000+ | Retail-ready designs, compact configurations | 1–665 pcs/sets |
Performance Analysis
Jiangsu Eternity and Ningbo Aquart demonstrate strong reliability with 100% on-time delivery and comprehensive customization options, making them suitable for branded procurement. Notably, Ningbo Aquart’s 33% reorder rate indicates higher customer retention, potentially reflecting superior product consistency or after-sales service. Whalfly Tek leads in responsiveness (≤1 hour), ideal for time-sensitive sourcing cycles, while Cixi Jirui offers low MOQs starting at two cartons, advantageous for market testing. Suppliers in Zhejiang province show stronger specialization in dedicated ice-making systems, whereas Guangdong-based vendors focus on compact, consumer-oriented designs with faster iteration cycles.
FAQs
How to verify electactic nugget ice maker supplier reliability?
Confirm compliance with international standards via test reports for electrical safety (IEC 60335), EMC, and environmental regulations (RoHS, REACH). Request evidence of production audits, facility videos, and historical shipment records. Analyze buyer feedback focusing on defect rates, warranty handling, and technical documentation clarity.
What is the typical sampling timeline?
Standard samples are produced within 7–14 days. Customized units requiring new molds or circuit adjustments may take 20–30 days. Air freight delivery adds 5–10 business days globally.
Can suppliers accommodate small batch orders?
Yes, several suppliers offer MOQs as low as 1–2 units for initial testing. However, unit costs decrease significantly at volumes exceeding 100 pieces, where full production line efficiencies apply.
Do manufacturers provide free samples?
Sample fees are typically charged but may be waived upon confirmation of large-scale orders. Expect to cover shipping and customs duties. Reimbursement policies vary and should be clarified pre-shipment.
How to initiate customization requests?
Submit detailed specifications including desired ice output (kg/24h), dimensions, voltage/frequency, plug type, color codes (Pantone), logo placement, and packaging structure. Leading suppliers provide CAD drawings or 3D renderings within 3–5 working days for approval prior to tooling.









